Call 1300 877 609 to find out about the latest offers available.

Planer Safe Work Method Statement (SWMS)

SKU:SWMAU141

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Planer Safe Work Method Statement (SWMS)

Introducing the Planer Safe Work Method Statement – your reliable companion in promoting safety and efficiency on your worksite. We understand the importance of providing a comprehensive and user-friendly tool that helps you navigate the complexities of your project while prioritising the well-being of your team. With our SWMS, you can confidently streamline your planning process, foster a culture of safety, and maintain compliance with regulatory requirements. Let’s dive into the key features that make our SWMS stand out:

  1. Pre-filled and Comprehensive: Our SWMS comes pre-filled with essential information, ensuring you have a solid foundation to work from. It covers a wide range of potential hazards and risks associated with using a planer, making it a comprehensive guide that addresses the most critical aspects of your work.
  2. Fully Editable and Customisable: We understand that every project is unique, and flexibility is key. Our SWMS is provided in Microsoft Word format, allowing you to easily customise it to align with your specific requirements. Whether you need to modify the scope, tailor the checklist, or update legislative references, our user-friendly template makes editing a breeze.
  3. Project Scope and Details: To facilitate a clear understanding of your project, our SWMS includes a dedicated section to outline the scope and provide essential project details. This helps to ensure that all personnel involved are on the same page, working towards a common goal, and adhering to the necessary safety measures.
  4. Checklist of High-Risk Machinery: We recognise the importance of identifying and managing high-risk machinery on your worksite. Our SWMS includes a comprehensive checklist, enabling you to systematically evaluate the safety requirements specific to the planer and take appropriate measures to mitigate any associated risks effectively.
  5. Staff Training Record: Promoting a culture of safety starts with proper training. Our SWMS provides space to record staff training, allowing you to document and track the training sessions conducted. This helps ensure that all team members are adequately informed and equipped with the necessary knowledge to operate the planer safely.
  6. Before and After Risk Ratings: Assessing and managing risks is a critical part of any project. Our SWMS includes before and after risk ratings, providing a practical framework to evaluate the potential hazards before implementation and monitor the effectiveness of the risk controls afterward. This helps you continuously improve the safety measures in place.
  7. Legislative References: Navigating through the legal landscape can be daunting. Our SWMS includes a section that references relevant legislation, ensuring you have easy access to the necessary guidelines and requirements. This helps you stay compliant with the latest regulations and fosters a safer working environment.
  8. Comprehensive Personal Protective Equipment (PPE) List: Protecting your team is paramount. Our SWMS includes a comprehensive list of all the necessary personal protective equipment required when using a planer. By ensuring that everyone is properly equipped, you can minimise the risk of injuries and create a safer work environment.
  9. Risk Assessment and Risk Assessment Matrix: Our SWMS provides a structured approach to risk assessment. It guides you through the process of identifying hazards, assessing risks, and implementing appropriate control measures. Additionally, the included risk assessment matrix allows you to prioritise risks and allocate resources accordingly, ensuring a focused and efficient safety management strategy.
  10. Checklist for Complete SWMS Implementation: To ensure that all crucial aspects are covered and no steps are overlooked, our SWMS includes a comprehensive checklist. This checklist serves as a handy reference, guiding you through the implementation process and ensuring that all the necessary requirements are met, thereby reducing the chances of oversight.
  11. Sign-off Page for Accountability: Accountability is crucial for maintaining a culture of safety. Our SWMS includes a sign-off page for all workers and responsible persons involved in the project. By signing off, each individual acknowledges their understanding of the SWMS and their commitment to following the outlined safety procedures. This fosters a sense of responsibility and encourages active participation in maintaining a safe working environment.
  1. Easy to Use and Customise: We understand that simplicity is key when it comes to implementing safety measures. Our SWMS is designed to be user-friendly, allowing you to navigate through the document with ease. The clear structure and intuitive layout make it straightforward to locate and modify specific sections according to your project’s needs.
  2. Suitable for Large Contracts and Tenders: Whether you’re working on large-scale contracts or participating in tenders, our SWMS is designed to meet your requirements. Its comprehensive nature and adaptable format make it suitable for various project sizes and complexities, including tier 1 contractual work. With our SWMS, you can confidently present your commitment to safety during the bidding process.
  3. Instantly Delivered Download: Time is of the essence, and we understand the need for prompt access to important resources. Our SWMS is available for instant download, allowing you to start implementing safety measures without delay. Once you’ve completed your purchase, you can immediately access the template and begin customising it to align with your project’s specific needs.

In conclusion, our Safe Work Method Statement for using a planer combines comprehensive guidance with user-friendly customisation options. With features such as pre-filled sections, editable format, project scope details, high-risk machinery checklist, staff training record, risk assessment tools, legislative references, PPE requirements, implementation checklist, and sign-off page, our SWMS empowers you to prioritise safety and maintain compliance on your worksite. It is designed to assist and support your team, fostering a culture of safety while allowing for flexibility and customisation. Download our SWMS today and take a proactive step towards creating a safer working environment.

Here is some safety information related to using a planer.

  1. Hazards Identification:
    • Moving parts of the planer machine can cause entanglement and crush injuries.
    • Noise exposure may exceed safe levels.
    • Dust and wood chips can cause respiratory issues.
    • Electrical hazards from the operation of the planer.
  2. Personal Protective Equipment (PPE):
    • Safety glasses or goggles to protect eyes from flying debris.
    • Hearing protection (ear muffs or earplugs) to reduce noise exposure.
    • Dust mask or respirator to protect against dust inhalation.
    • Safety gloves to protect hands during machine setup and maintenance.
    • Steel-toed safety boots for foot protection.
  3. Pre-Start Checks:
    • Inspect the planer machine for any damage or defects.
    • Ensure the emergency stop button is easily accessible and functional.
    • Check that the machine is properly grounded and electrical cords are in good condition.
    • Verify that all safety guards and shields are in place.
  4. Setup and Preparation:
    • Clear the work area of any obstructions, debris, or tripping hazards.
    • Securely fasten the planer machine to the workbench or floor.
    • Ensure the machine is stable and not prone to tipping.
    • Position the machine in a well-ventilated area to minimise dust accumulation.
  5. Operation Procedures:
    • Familiarise yourself with the manufacturer’s instructions and safety guidelines.
    • Ensure the material being planed is free of nails, staples, or other metal objects.
    • Use push sticks or other appropriate tools to feed the material into the planer.
    • Maintain a safe distance from the rotating cutter head.
    • Do not wear loose clothing or jewellery that could get caught in the machine.
  6. Dust Extraction:
    • Connect a suitable dust extraction system to the planer machine.
    • Regularly clean and empty the dust collection bag or container.
    • Dispose of collected dust and debris in accordance with local regulations.
  7. Maintenance and Repairs:
    • Disconnect the planer machine from the power source before performing any maintenance or repairs.
    • Only trained and authorised personnel should conduct repairs.
    • Follow lockout/tagout procedures when working on the machine.
    • Regularly inspect and replace worn or damaged parts.
  8. Emergency Procedures:
    • In case of an emergency, immediately activate the emergency stop button.
    • Report any incidents, near misses, or hazards to the supervisor.
    • If an injury occurs, administer first aid and seek medical attention as necessary.

Gary’s Safety Tips

Hey, everyone! Gary here, and today I want to talk about a tool that can be incredibly useful but also potentially dangerous if not used with caution: the planer. Now, before we dive into the details, I want to make it clear that safety should always be your top priority when working with any power tool. So, let’s get right into it and discuss the dangers associated with using a planer, as well as some important safety recommendations.

First and foremost, let’s address the risks involved in operating a planer. This powerful tool is designed to shave down wood surfaces, making them smoother and more even. However, this also means that it can easily remove a significant amount of material in a short period. If you’re not careful, it’s all too easy to accidentally remove more than you intended, leading to a loss of structural integrity or an imbalance in the wood piece you’re working on.

Moreover, the cutting blades of a planer can cause severe injuries if mishandled. These blades rotate at high speeds and can easily catch loose clothing, jewellery, or even your fingers if you’re not paying close attention. One moment of distraction or carelessness can result in a serious accident that could have been prevented with proper safety precautions.

So, what can you do to ensure your safety when using a planer? Here are some recommendations that you should always keep in mind:

  1. Protective Gear: Before you even power up the planer, make sure you’re properly equipped with safety gear. This includes safety glasses or goggles to protect your eyes from flying debris, ear protection to minimise the noise levels, and a dust mask to avoid inhaling potentially harmful particles.
  2. Stable Workspace: Ensure that your work area is stable and secure. The planer should be placed on a sturdy, level surface to prevent any wobbling or tipping during operation. This will help maintain control and reduce the chances of accidents.
  3. Follow the Manual: Every planer comes with an instruction manual, and it’s crucial to read and understand it thoroughly before using the tool. The manual provides valuable information on setup, operation, and safety guidelines specific to your planer model.
  4. Maintain a Safe Distance: When operating a planer, it’s essential to keep a safe distance between your body and the machine. Avoid reaching over the planer or standing directly in line with the cutting blades to minimise the risk of injury if something were to go wrong.
  5. Mind Your Clothing: Loose clothing, jewellery, or accessories can easily get caught in the planer’s blades. To prevent accidents, ensure that you’re wearing fitted clothing and remove any dangling items that could potentially get entangled.
  6. Slow and Steady Wins the Race: Take your time when planing and avoid rushing through the process. Applying too much pressure or feeding the wood too quickly can lead to unintended consequences. It’s better to make multiple light passes than one heavy pass that could result in damage or compromise safety.
  7. Unplug and Store Properly: Once you’ve completed your work, unplug the planer from the power source and store it in a safe place. Make sure the blades are properly covered, and the cord is neatly coiled to prevent tripping hazards.

Remember, accidents can happen to anyone, regardless of their level of experience. So, whether you’re a seasoned woodworker or just starting out, don’t underestimate the importance of safety precautions when using a planer.

In conclusion, while planers are incredible tools that can transform rough wood into beautifully finished pieces, they also come with inherent risks. By following these safety recommendations, you can minimise the dangers associated with using a planer and ensure a safer and more enjoyable woodworking experience. Stay safe, my friends, and keep creating amazing things!

Regards,

Planer Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Planer Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket