Call 1300 877 609 to find out about the latest offers available.

Hydraulic Panbrake Safe Work Method Statement (SWMS)

SKU:SWMAU101

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Hydraulic Panbrake Safe Work Method Statement (SWMS)

Introducing our Hydraulic Panbrake Safe Work Method Statement (SWMS) – a comprehensive and user-friendly document that puts safety first. Our SWMS is designed to provide a clear and concise guide for workers, supervisors and contractors to ensure that all necessary precautions are taken when working with a hydraulic panbrake.

Key Features:

Pre-filled and Comprehensive: Our SWMS is pre-filled with all the essential information required for working with a hydraulic panbrake. It’s comprehensive enough to cover all the necessary details and help ensure a safe work environment.

Fully editable and customisable: Our SWMS comes in Microsoft Word format, which makes it easy to edit and customise to fit your specific project requirements. You can tailor it to meet your company’s safety standards, making it a flexible and versatile document.

Scope and Project Details: Our SWMS includes the scope of the project and all the important project details to ensure that everyone involved understands the scope of work and can take the necessary safety measures.

Checklist for High-Risk Machinery: Our SWMS includes a checklist of any high-risk machinery on site, which helps to identify any potential hazards that may arise while using the hydraulic panbrake. It ensures that safety measures are in place to prevent accidents.

Staff Training Record: Our SWMS includes space for recording any staff training, which helps to ensure that all workers are competent and qualified to operate the hydraulic panbrake safely.

Before and After Risk Ratings: Our SWMS includes before and after risk ratings, which helps to identify any potential hazards before starting work and ensure that appropriate safety measures are taken.

Legislative References: Our SWMS includes resources for the use of legislative references, ensuring that all safety regulations and standards are being met.

PPE Requirements: Our SWMS includes all Personal Protective Equipment (PPE) required for working with a hydraulic panbrake. It ensures that all workers are equipped with the necessary safety gear.

Risk Assessment and Matrix: Our SWMS includes a risk assessment and risk assessment matrix to ensure that all risks are identified and mitigated. It ensures that all safety measures are taken, and workers are protected from potential hazards.

Checklist to Ensure Requirements are Covered: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS. It ensures that nothing is overlooked, and all safety measures are in place.

Sign Off Page: Our SWMS includes a sign-off page for all workers and responsible persons. It ensures that everyone involved in the project has read and understood the SWMS and is committed to following it.

Easy to Use and Customise: Our SWMS is easy to use and customise, making it a user-friendly document that can be easily adapted to meet your specific safety requirements.

Suitable for Large Contracts and Tenders: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work. It ensures that safety is prioritised, and all safety measures are taken.

Instantly Delivered Download: Our SWMS is available for instant download, making it quick and easy to access. It’s convenient, saves time and ensures that safety measures are in place right from the start.

Our SWMS is a valuable tool for ensuring that safety is prioritised when working with a hydraulic panbrake. It provides a clear and concise guide for workers, supervisors and contractors to ensure that all necessary precautions are taken. So, stay safe and choose our SWMS for your next hydraulic panbrake project.

Here is some safety information related to working with a hydraulic panbrake.

Hazards: The following hazards have been identified in the operation of hydraulic panbrakes:

  • Electrical hazards from the machinery’s power source
  • Crushing, pinching or trapping of fingers, hands, and arms in the panbrake
  • Slips, trips, and falls when accessing the machinery
  • Manual handling injuries from lifting and moving heavy materials

Risk Controls: To minimize the risk of injury from these hazards, the following controls must be implemented:

  • Workers must be trained and authorised to operate hydraulic panbrakes
  • The panbrake must be maintained and inspected regularly to ensure it is in safe working order
  • The power source must be isolated and locked out before any maintenance or repairs are carried out
  • Protective clothing, including gloves and safety glasses, must be worn when operating the panbrake
  • Workers must ensure the work area is clear of obstacles and debris to prevent trips and falls
  • Materials must be lifted and moved using mechanical aids or by more than one person to avoid manual handling injuries
  • Workers must keep their hands and arms away from the panbrake’s moving parts and pinch points
  • Workers must not remove or tamper with any guards or safety devices on the panbrake.

Procedure: The following steps must be followed when operating a hydraulic panbrake:

  1. Conduct a pre-operational inspection of the machinery to ensure it is in safe working order
  2. Isolate the power source and lock out before carrying out any maintenance or repairs
  3. Wear appropriate personal protective equipment, including gloves and safety glasses
  4. Ensure the work area is clear of obstacles and debris to prevent slips, trips, and falls
  5. Lift and move materials using mechanical aids or by more than one person to avoid manual handling injuries
  6. Keep hands and arms away from the panbrake’s moving parts and pinch points
  7. Do not remove or tamper with any guards or safety devices on the panbrake.
  8. Follow the manufacturer’s instructions for operating the hydraulic panbrake.
  9. Conduct a post-operational inspection of the machinery to ensure it is in safe working order.
  10. Isolate the power source and lock out the panbrake at the end of the work shift.

Emergency Procedures: In the event of an emergency, workers must follow the site’s emergency procedures and notify the site supervisor immediately.

Gary’s Safety Tips

Hey, everyone! Today, I want to talk to you about an important topic that affects many people who work with metal – the hydraulic panbrake. Now, I know what you’re thinking – “Gary, what could be dangerous about a simple tool like a panbrake?” Well, let me tell you, my friends, there are several risks involved in using this tool, and it’s crucial that you take the necessary precautions to ensure your safety.

First off, let’s talk about what a hydraulic panbrake is. Essentially, it’s a machine that is used to bend sheet metal into various shapes and angles. It works by applying pressure to the metal using a hydraulic system, which causes it to bend along a predetermined axis. Now, while this may seem like a simple process, there are several dangers involved.

One of the most significant risks associated with using a hydraulic panbrake is the potential for crushing injuries. If you’re not careful when operating the machine, it’s easy to get your hands, fingers, or other body parts caught between the metal and the machine’s moving parts. This can cause severe injuries, including broken bones, amputations, and even death. To prevent these types of accidents, it’s crucial that you always keep your hands and other body parts away from the machine’s moving parts, and never try to adjust the metal while the machine is in operation.

Another risk associated with hydraulic panbrakes is the potential for electrical shock. These machines are powered by electricity, which means that there is always a risk of electrical shock if you’re not careful. To avoid this, it’s important that you always wear insulated gloves and shoes, and never touch any part of the machine while it’s in operation.

In addition to these risks, there are several other safety recommendations that you should keep in mind when working with hydraulic panbrakes. For example, you should always make sure that the machine is properly grounded and that all electrical connections are secure. You should also ensure that the machine’s hydraulic system is free from leaks and that all hydraulic hoses are in good condition.

Another important safety tip is to always follow the manufacturer’s instructions and guidelines when operating the machine. This includes making sure that you’re using the correct type and size of metal for the machine, and that you’re using the correct tools and accessories. It’s also crucial that you never exceed the machine’s maximum capacity, as this can lead to serious accidents and injuries.

Finally, it’s important to always wear the appropriate personal protective equipment when working with hydraulic panbrakes. This includes safety glasses, earplugs or earmuffs, gloves, and a face shield. By wearing this equipment, you can protect yourself from flying metal shards, loud noise, and other hazards that are associated with this type of work.

In conclusion, working with hydraulic panbrakes can be a rewarding and satisfying experience, but it’s crucial that you take the necessary precautions to ensure your safety. By following these safety recommendations and guidelines, you can reduce the risk of accidents and injuries and create a safe and productive working environment. So, my friends, remember to always be careful, stay focused, and put safety first. Stay safe out there, and I’ll catch you all on the flip side!

Cheers,

Hydraulic Panbrake Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Hydraulic Panbrake Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket