Call 1300 877 609 to find out about the latest offers available.

General Maintenance Hydraulic Services Safe Work Method Statement (SWMS)

SKU:SWMAU537

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

General Maintenance Hydraulic Services Safe Work Method Statement (SWMS)

Introducing our General Maintenance Hydraulic Services Safe Work Method Statement (SWMS) – the perfect tool to ensure your project is completed safely and efficiently! Our SWMS is designed to help you meet your obligations under Australian workplace health and safety legislation, and to provide guidance to workers and contractors to ensure that risks associated with maintenance hydraulic services are identified and effectively managed.

Here are the key features of our SWMS:

  • Pre-filled and Comprehensive: Our SWMS is pre-filled with relevant information and includes all necessary details for general maintenance hydraulic services. This ensures that nothing is missed and that all requirements are covered.
  • Fully editable and customisable in Microsoft Word format: Our SWMS is provided in Microsoft Word format, which allows for easy editing and customisation to meet your specific needs. This means that you can tailor the document to suit your project requirements and update it as necessary.
  • Includes the scope of the project and the project details: Our SWMS includes a clear scope of the project and all relevant project details. This helps to ensure that everyone involved in the project is clear on what needs to be done.
  • Includes checklist of any high-risk machinery on site: Our SWMS includes a checklist of any high-risk machinery on site. This helps to ensure that these risks are identified and managed appropriately.
  • Includes space for recording any staff training: Our SWMS includes space for recording any staff training. This helps to ensure that all workers are adequately trained and competent to perform their tasks safely.
  • Includes before and after risk ratings: Our SWMS includes before and after risk ratings. This helps to ensure that the effectiveness of risk controls can be evaluated and improved as necessary.
  • Includes resources for use of legislative references: Our SWMS includes resources for use of legislative references. This helps to ensure that all legislative requirements are met and complied with.
  • Includes all PPE required: Our SWMS includes all personal protective equipment (PPE) required. This helps to ensure that all workers are adequately protected from hazards.
  • Includes risk assessment and risk assessment matrix: Our SWMS includes a risk assessment and risk assessment matrix. This helps to ensure that all risks associated with the project are identified and managed appropriately.
  • Includes a checklist to ensure all requirements have been covered when implementing the SWMS: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS. This helps to ensure that the SWMS is implemented effectively and efficiently.
  • Includes sign off page for all workers and responsible persons: Our SWMS includes a sign off page for all workers and responsible persons. This helps to ensure that everyone involved in the project is aware of the SWMS and has agreed to follow it.
  • Easy to use, easy to customise: Our SWMS is designed to be easy to use and easy to customise. This means that it can be quickly adapted to suit your specific project needs.
  • Suitable for large contracts and tenders, including tier 1 contractual work: Our SWMS is suitable for use on large contracts and tenders, including tier 1 contractual work. This means that it meets the requirements of major clients and projects.
  • Instantly delivered download: Our SWMS is available as an instantly delivered download. This means that you can access it quickly and easily, and start using it straight away.

Overall, our SWMS for General Maintenance Hydraulic Services is a comprehensive and effective tool to help ensure that your project is completed safely and efficiently. By identifying and managing risks associated with maintenance hydraulic services, our SWMS helps to protect workers and contractors, and to ensure compliance with workplace health and safety legislation. So why wait? Download our SWMS today and get started on your project!

Here is some safety information related to general maintenance hydraulic services.

 

  1. Hazards and Risks:
  • Risk of injury from moving hydraulic parts and equipment
  • Risk of electrical hazards from hydraulic equipment
  • Risk of falls from heights when accessing elevated hydraulic components
  • Risk of exposure to hydraulic fluid, which can cause skin irritation and other health issues
  • Risk of fire or explosion from hydraulic system leaks
  1. Control Measures:
  • Prior to starting work, ensure that all hydraulic components are de-energised and all energy sources are isolated and locked out/tagged out
  • Wear appropriate Personal Protective Equipment (PPE) including gloves, eye protection, and any necessary respiratory protection
  • Ensure that all tools and equipment are in good working condition and have appropriate guarding in place
  • Use appropriate lifting and handling equipment to prevent manual handling injuries
  • Follow manufacturer’s instructions and recommendations when performing maintenance on hydraulic components
  • Clean up spills immediately and dispose of contaminated materials appropriately
  • Ensure all electrical components are properly grounded and isolated before commencing work
  • Conduct a risk assessment before working at height and use appropriate fall protection equipment
  • Ensure all equipment and components are properly secured before starting work
  1. Procedure:
  • Obtain the necessary permits and approvals for the work to be carried out
  • Identify and assess any hazards associated with the work
  • Prepare a Safe Work Method Statement (SWMS) that includes the hazards and control measures identified
  • Ensure that all personnel involved in the work are trained and competent
  • Isolate and lock out/tag out all energy sources and ensure all components are de-energised
  • Wear appropriate PPE
  • Conduct any necessary tests to ensure that components are properly isolated and de-energised
  • Use appropriate tools and equipment to perform maintenance on hydraulic components
  • Clean up any spills immediately and dispose of contaminated materials appropriately
  • Test the hydraulic system to ensure it is functioning properly
  • Ensure that all components are properly secured before finishing work
  • Remove all equipment and materials from the work area and return it to its proper storage location
  • Conduct a final inspection to ensure that the work has been completed to the required standard
  • Sign off on the SWMS to indicate that the work has been completed safely and successfully.
  1. Emergency Procedures:
  • In the event of an emergency, immediately stop work and follow the emergency procedures outlined and any other relevant procedures or policies
  • If someone is injured, provide first aid as necessary and call for medical assistance if required
  • If there is a fire, activate the fire alarm and follow the evacuation procedures
  • Report the incident to the relevant authorities and investigate the cause of the incident.

Gary’s Safety Tips

Hello everyone! Today, I want to talk about a topic that’s essential for any business that takes safety and risk management seriously. I’m talking about creating risk assessment templates, including environmental risk assessments.

As a business owner, it’s important to be aware of the risks that your business faces. These risks can be related to health and safety, environmental factors, or anything else that could potentially harm your business, employees, customers, or the general public. And that’s where risk assessments come into play.

A risk assessment is a systematic process of evaluating potential risks and hazards associated with a particular activity or process. It helps you identify potential risks, assess the likelihood of those risks occurring, and evaluate the severity of their impact. Once you have a good understanding of the risks, you can then develop and implement strategies to mitigate or manage them.

So, how do you create a risk assessment template, including an environmental risk assessment? Here are some steps to follow:

Step 1: Identify the Risks The first step in creating a risk assessment template is to identify the potential risks that your business faces. This will depend on the nature of your business and the activities or processes involved. For example, if you’re running a manufacturing plant, you’ll need to identify risks related to machinery, chemicals, and other hazards associated with your operations.

When it comes to environmental risk assessments, you’ll need to consider risks related to pollution, waste management, emissions, and any other environmental factors that could potentially harm the environment.

Step 2: Assess the Likelihood and Severity of Risks Once you’ve identified the potential risks, the next step is to assess their likelihood and severity. You’ll need to consider how likely each risk is to occur and how severe the consequences could be if it does. This will help you prioritise the risks and develop appropriate strategies to manage them.

When it comes to environmental risk assessments, you’ll also need to consider the potential impact on the environment and any regulatory requirements that you need to comply with.

Step 3: Develop Strategies to Mitigate or Manage Risks The next step is to develop strategies to mitigate or manage the identified risks. This could involve implementing safety measures, training employees on safety procedures, implementing environmental management systems, or any other strategies that are appropriate for your business.

When it comes to environmental risk assessments, you’ll need to develop strategies that comply with regulatory requirements and minimise the impact on the environment.

Step 4: Create a Risk Assessment Template Once you’ve identified the risks and developed strategies to manage them, it’s time to create a risk assessment template. This template should include all the necessary information, such as the identified risks, the likelihood and severity of each risk, and the strategies to mitigate or manage them.

When creating an environmental risk assessment template, you’ll need to include information related to environmental factors, such as pollution, emissions, waste management, and any other factors that could potentially harm the environment.

Step 5: Implement and Review the Risk Assessment Template The final step is to implement the risk assessment template and review it periodically to ensure that it remains up-to-date and effective. You should also review the template whenever there are changes to your business operations or any new risks are identified.

In conclusion, creating a risk assessment template, including an environmental risk assessment, is an essential step for any business that takes safety and risk management seriously. By following the steps outlined above, you can identify potential risks, assess their likelihood and severity, develop strategies to mitigate or manage them, and create a comprehensive risk assessment template that will help you keep your business safe and compliant. So, what are you waiting for? Get started on your risk assessment template today!

Cheers,

General Maintenance Hydraulic Services Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

General Maintenance Hydraulic Services Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket