Call 1300 877 609 to find out about the latest offers available.

Crawler Crane Safe Work Method Statement (SWMS)

SKU:

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Crawler Crane Safe Work Method Statement (SWMS)

Introducing the Crawler Crane Safe Work Method Statement – the perfect tool for any construction project that involves the use of this type of equipment. Our SWMS has been meticulously crafted to provide a comprehensive and pre-filled guide that can be customised to suit your project’s specific needs.

Here are the key features of our SWMS:

  • Pre-filled and Comprehensive: Our SWMS comes pre-filled with all the necessary details for a crawler crane operation. It covers all the important aspects of the project, including the scope of the project, the project details, and any high-risk machinery on site. This provides a comprehensive guide that covers most scenarios you may encounter in the project.
  • Fully editable and customisable in Microsoft Word format: We understand that each project is unique, and that’s why our SWMS is fully editable and customisable in Microsoft Word format. You can easily tailor the document to meet your project’s specific requirements.
  • Includes space for recording any staff training: Our SWMS includes space for recording any staff training, ensuring that everyone involved in the project has received the appropriate training and understands their roles and responsibilities.
  • Includes before and after risk ratings: Our SWMS includes before and after risk ratings, helping you to identify potential hazards and track progress throughout the project.
  • Includes resources for use of legislative references: Our SWMS includes resources for the use of legislative references, making sure you are fully compliant with any relevant laws and regulations.
  • Includes all PPE required: Our SWMS includes all Personal Protective Equipment (PPE) required for a crawler crane operation, ensuring the safety of all workers on site.
  • Includes risk assessment and risk assessment matrix: Our SWMS includes a risk assessment and risk assessment matrix, which will help you identify potential hazards and determine the appropriate control measures to reduce risks.
  • Includes a checklist to ensure all requirements have been covered: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS, so you can rest assured that you’ve got everything under control.
  • Includes sign off page for all workers and responsible persons: Our SWMS includes a sign off page for all workers and responsible persons, ensuring that everyone involved in the project has read and understood the SWMS before commencing work.
  • Easy to use and customise: Our SWMS is designed to be easy to use and customise. You don’t need to be an expert to edit and tailor the document to suit your needs.
  • Suitable for large contracts and tenders, including tier 1 contractual work: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work, making it the perfect tool for any construction project that involves a crawler crane.
  • Instantly delivered download: Our SWMS is available as an instant download, so you can get started right away.

Our SWMS is the perfect tool for any construction project that involves a crawler crane. With its pre-filled and comprehensive guide, editable and customisable format, and various features, you can rest assured that you’re getting a document that can help you reduce risks and ensure the safety of everyone involved in the project.

Here is some safety information related to working with crawler cranes.

Hazards and Risks:

The operation of a crawler crane presents a number of hazards and risks which include but are not limited to the following:

  1. The potential for collision with other mobile plant or stationary objects.
  2. The risk of structural failure due to overload or misuse of the crane.
  3. The potential for injury or fatality due to the crane’s swinging or rotating boom.
  4. The risk of entanglement in the crane’s hoisting or rigging gear.
  5. The potential for electrical hazards due to the crane’s power source and electrical system.
  6. The risk of slips, trips, and falls while working on the crane or on the worksite.

Control Measures:

In order to mitigate the hazards and risks associated with the operation of a crawler crane, the following control measures must be implemented:

  1. Before commencing work, a pre-start inspection of the crane must be conducted by a competent person to ensure that it is in safe working condition.
  2. A risk assessment must be conducted to identify potential hazards and risks associated with the work to be undertaken and appropriate control measures implemented.
  3. The crane operator must be qualified, competent, and licensed to operate the specific type of crawler crane being used.
  4. The crane must be operated in accordance with the manufacturer’s instructions and any relevant regulations and standards.
  5. A minimum exclusion zone of at least twice the length of the crane’s boom must be established around the crane to prevent collisions with other plant or stationary objects.
  6. The crane must be rigged with appropriate hoisting and rigging gear and the load must be securely attached and balanced.
  7. All personnel involved in the operation of the crane must be trained and competent in their roles and responsibilities.
  8. The crane must be fitted with appropriate safety devices such as an anti-two block device and an overload protection system.
  9. The worksite must be kept clear of obstructions and any trip hazards identified and removed.
  10. A communication system must be established between the crane operator and any personnel involved in the lifting operation.

Emergency Procedures:

In the event of an emergency, the following procedures must be followed:

  1. The crane operator must immediately stop the crane and secure the load.
  2. The worksite must be evacuated and the area around the crane must be cordoned off to prevent access.
  3. Emergency services must be notified and assistance requested.
  4. The crane must not be moved until the emergency has been resolved and the area declared safe by the competent person.

Conclusion:

The safe operation of a crawler crane requires a comprehensive understanding of the hazards and risks associated with the work and the implementation of appropriate control measures. By following the procedures outlined here, the risks associated with the operation of a crawler crane can be minimised, ensuring a safe worksite for all personnel involved.

Gary’s Safety Tips

Hey everyone, it’s Gary, and today I want to talk about an important topic that every construction worker should be aware of: the dangers and safety recommendations when working with a crawler crane.

Crawler cranes are powerful machines that can lift and move heavy loads, making them an essential tool in many construction projects. However, they can also be extremely dangerous if not operated correctly. That’s why it’s crucial to follow proper safety protocols when working with a crawler crane.

One of the biggest dangers of working with a crawler crane is the risk of tipping. These machines are designed to be stable while lifting loads, but they can become unstable if not properly balanced. It’s important to ensure that the crane is on stable ground and that the load is evenly distributed before beginning any lifting operation.

Another risk associated with crawler cranes is electrical hazards. These machines are often powered by electricity, and workers must be aware of the potential for electrocution when working near power lines or other sources of electricity. It’s important to stay clear of power lines and other electrical hazards when operating a crawler crane.

In addition to these specific risks, there are also general safety recommendations that workers should follow when working with crawler cranes. Here are some of the most important ones:

First and foremost, all workers should be properly trained on the use of crawler cranes. This includes both the operation of the machine itself and the proper safety protocols to follow. Workers should also be familiar with the specific model of crane they are working with, as each machine can have unique features and requirements.

Workers should always wear appropriate personal protective equipment (PPE) when working with a crawler crane. This includes hard hats, safety glasses, and steel-toed boots, among other items. PPE can help protect workers from injuries in case of accidents.

Before beginning any lifting operation, workers should perform a thorough inspection of the crane and the load. This includes checking all cables and connections, as well as making sure the load is properly secured. Workers should also check the surrounding area for any potential hazards, such as overhead power lines.

During lifting operations, workers should communicate clearly and effectively with each other. This includes using hand signals or radios to coordinate movements and make sure everyone is on the same page. Workers should also be aware of their surroundings at all times and stay clear of any potential hazards.

Finally, workers should always follow the manufacturer’s instructions and recommendations when operating a crawler crane. This includes following load capacity guidelines and other safety requirements. If there is any doubt about how to operate the crane safely, workers should seek out additional training or guidance.

In conclusion, working with a crawler crane can be a challenging and rewarding experience, but it is also associated with significant risks. By following proper safety protocols and recommendations, workers can help reduce the likelihood of accidents and injuries when using these powerful machines. Remember, safety should always be the top priority when working in construction. Stay safe out there!

Regards,

Crawler Crane Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Crawler Crane Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket