Call 1300 877 609 to find out about the latest offers available.

Demolition Hammer Safe Work Method Statement (SWMS)

SKU:

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Demolition Hammer Safe Work Method Statement (SWMS)

Introducing the Demolition Hammer Safe Work Method Statement (SWMS), the perfect solution for those in the construction industry who want to ensure a safe work environment. Our SWMS is designed to provide a comprehensive and easy-to-use framework for anyone looking to use a demolition hammer on their project. Here are the key features of our SWMS:

Pre-filled and Comprehensive: Our SWMS comes pre-filled with all the necessary details, making it comprehensive and ready for use. It covers all the important aspects of using a demolition hammer on your project.

Fully editable and customisable: Our SWMS comes in a Microsoft Word format that is fully editable and customisable. This means you can easily modify it to suit your specific needs and requirements.

Scope of the project and project details: Our SWMS includes a detailed scope of the project, as well as project details such as the location, date, and time of the work.

Checklist of high-risk machinery: Our SWMS includes a checklist of any high-risk machinery that may be present on the worksite. This helps to ensure that all potential hazards are identified and addressed before work begins.

Space for recording staff training: Our SWMS includes space for recording any staff training that has been undertaken. This is important for ensuring that all workers are trained and competent in the use of the demolition hammer.

Before and after risk ratings: Our SWMS includes before and after risk ratings, which help to identify any changes in the level of risk associated with using the demolition hammer.

Legislative references: Our SWMS includes resources for use of legislative references, making it easy to comply with all relevant regulations and standards.

PPE requirements: Our SWMS includes all the necessary PPE required for using a demolition hammer. This ensures that all workers are properly protected while carrying out the work.

Risk assessment and risk assessment matrix: Our SWMS includes a risk assessment and risk assessment matrix. This helps to identify and mitigate any potential risks associated with using the demolition hammer.

Checklist for implementation: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS. This helps to ensure that all necessary steps have been taken to ensure a safe work environment.

Sign-off page: Our SWMS includes a sign-off page for all workers and responsible persons. This ensures that everyone involved in the project has read and understood the SWMS, and agrees to abide by its contents.

Easy to use and customise: Our SWMS is designed to be easy to use and customise, making it perfect for large contracts and tenders, including tier 1 contractual work.

Instant download: Our SWMS is available for instant download, so you can get started right away.

With our SWMS for using demolition hammer, you can rest assured that you have a comprehensive and reliable framework to ensure a safe and successful project.

Here is some safety information related to using a demolition hammer.

Hazard Identification: The operation of demolition hammers can present a number of hazards. The most significant hazards associated with demolition hammers include:

  1. Noise – Demolition hammers generate high levels of noise that can damage hearing.
  2. Vibration – Demolition hammers generate high levels of vibration that can cause damage to hands and arms.
  3. Dust – Demolition hammers generate dust that can cause respiratory problems.
  4. Striking Hazards – Demolition hammers can cause damage if they strike objects or people.

Risk Assessment: The following control measures should be implemented to reduce the risk associated with the operation of demolition hammers:

  1. Personal Protective Equipment (PPE) – All personnel involved in the operation of demolition hammers should wear appropriate PPE including ear protection, eye protection, hand protection, and respiratory protection.
  2. Training – All personnel involved in the operation of demolition hammers should receive adequate training and instruction on the safe operation of the equipment.
  3. Site Preparation – The work area should be prepared to reduce the risk of striking hazards. This may involve the removal of obstacles and the installation of barriers.
  4. Noise Control – Noise levels should be reduced through the use of acoustic barriers or by operating the equipment during quieter periods.
  5. Vibration Control – Vibration levels should be reduced through the use of anti-vibration gloves and the use of the equipment for short periods.
  6. Dust Control – Dust levels should be reduced through the use of dust suppression techniques such as water sprays or by using the equipment in a well-ventilated area.

Safe Work Procedure: The following procedure should be followed when operating demolition hammers:

  1. All personnel involved in the operation of demolition hammers should wear appropriate PPE.
  2. The work area should be prepared to reduce the risk of striking hazards.
  3. The demolition hammer should be inspected prior to use to ensure that it is in good working order.
  4. The operator should be trained and competent in the use of the equipment.
  5. The operator should hold the demolition hammer firmly with both hands and ensure that the chisel is secure.
  6. The operator should stand in a stable position with their feet apart and use the equipment in short bursts.
  7. The operator should be aware of their surroundings and avoid striking objects or people.
  8. The operator should stop using the equipment immediately if they experience any discomfort or pain.
  9. The equipment should be turned off and the chisel should be removed before any maintenance is carried out.

Emergency Procedures: The following emergency procedures should be followed in the event of an accident:

  1. First aid should be administered immediately to any injured personnel.
  2. The equipment should be turned off and made safe.
  3. The incident should be reported to the supervisor or site manager.

Conclusion: The safe operation of demolition hammers requires careful planning, adequate training, and the use of appropriate control measures. By following the procedures outlined here, the risks associated with the operation of demolition hammers can be minimised, and the safety of personnel can be ensured.

Gary’s Safety Tips

Hey everyone, it’s Gary, and today I want to talk to you about something that’s near and dear to my heart: safety in the workplace. Specifically, I want to discuss the dangers and safety recommendations when working with a demolition hammer.

Now, for those of you who don’t know, a demolition hammer is a powerful tool used to break up concrete, brick, and other hard materials. They’re commonly used on construction sites and can make quick work of tough jobs. However, they’re also incredibly dangerous if not used properly.

One of the biggest dangers of working with a demolition hammer is the risk of flying debris. When you’re breaking up concrete or other materials, small pieces can go flying in all directions. If you’re not wearing the proper protective gear, you could end up with serious injuries to your eyes, face, or other parts of your body.

That’s why it’s so important to wear safety goggles or a face shield when using a demolition hammer. You should also wear a hard hat, gloves, and sturdy work boots to protect yourself from other hazards on the job site.

Another danger of using a demolition hammer is the risk of hearing damage. These tools are incredibly loud, and prolonged exposure to the noise can cause permanent hearing loss. That’s why it’s important to wear earplugs or earmuffs to protect your hearing.

You should also make sure that you’re using the right tool for the job. Demolition hammers come in a variety of sizes and strengths, and you need to choose the right one for the task at hand. Using a tool that’s too weak for the job can be dangerous, as it could overheat and malfunction. On the other hand, using a tool that’s too powerful for the job can be difficult to control, leading to accidents and injuries.

When you’re using a demolition hammer, you should also make sure that the tool is in good working order. Check the tool before each use to make sure that all the parts are working correctly and that there are no cracks or other damage to the housing. If you notice any problems with the tool, stop using it immediately and have it repaired or replaced.

It’s also important to use the right technique when using a demolition hammer. You should always hold the tool with both hands and keep it close to your body to maintain control. Make sure that you’re using the tool at the right angle and that you’re not putting too much pressure on it. If you’re not sure how to use a demolition hammer properly, ask for help or consult the instruction manual.

Finally, it’s important to take breaks when using a demolition hammer. These tools can be very tiring to use, and you don’t want to risk making mistakes or losing control due to fatigue. Take breaks every 20-30 minutes to rest and recharge.

In conclusion, working with a demolition hammer can be a dangerous task if not done properly. However, if you follow these safety recommendations, you can minimise the risks and ensure that you’re working in a safe and secure environment. Remember to wear the proper protective gear, choose the right tool for the job, maintain the tool properly, use the right technique, and take breaks when needed. By doing so, you can help prevent accidents and injuries on the job site. Thanks for tuning in, and stay safe out there!

Regards,

Demolition Hammer Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Demolition Hammer Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket