Call 1300 877 609 to find out about the latest offers available.

Vacuum Excavator Safe Work Method Statement (SWMS)

SKU:

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Vacuum Excavator Safe Work Method Statement (SWMS)

Introducing our Vacuum Excavator Safe Work Method Statement – a comprehensive and pre-filled document that helps you ensure safety while working with high-risk machinery on your project site. Our SWMS provides you with all the necessary tools to create a safe work environment while avoiding potential hazards that may occur during excavation works.

Key Features:

  • Pre-filled and Comprehensive: Our SWMS is pre-filled with all the necessary information required for a vacuum excavation project, and covers all the critical components for ensuring safety on site.
  • Fully Editable: Our document is customisable in Microsoft Word format, making it easy to edit and modify to suit your project needs.
  • Includes Scope and Project Details: Our SWMS includes details on the project scope, location, date and time of work, and other critical project details.
  • High-Risk Machinery Checklist: Our SWMS includes a checklist of high-risk machinery that may be present on site, ensuring that all necessary safety precautions are taken before starting work.
  • Staff Training Record: Our SWMS includes a section for recording staff training, ensuring that all workers on site are equipped with the necessary knowledge and skills for safe operation.
  • Before and After Risk Ratings: Our SWMS includes before and after risk ratings to measure the level of safety before and after the work is completed.
  • Legislative References: Our SWMS includes legislative references to ensure compliance with safety laws and regulations.
  • PPE Requirements: Our SWMS includes a list of all PPE required for safe work on site.
  • Risk Assessment and Risk Assessment Matrix: Our SWMS includes a risk assessment and risk assessment matrix to identify potential hazards and mitigate risks.
  • Checklist: Our SWMS includes a checklist to ensure that all safety requirements have been covered before starting work.
  • Sign-off Page: Our SWMS includes a sign-off page for all workers and responsible persons to acknowledge and confirm their commitment to safety on site.
  • Easy to Use and Customise: Our SWMS is easy to use and customise, ensuring that all aspects of safety are covered while keeping it simple.
  • Suitable for Large Contracts and Tenders: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work.
  • Instant Download: Our SWMS is instantly downloadable, ensuring that you can start your project safely without any delay.

We understand that safety is of the utmost importance when it comes to excavation work. Our SWMS provides you with all the necessary tools to create a safe work environment and avoid any potential hazards that may occur during excavation works. Order our SWMS today and ensure safety on your project site.

Here is some safety information related to working with a vacuum excavator.

Hazards:

  1. Contact with underground utilities
  2. Slips, trips and falls
  3. Confined space entry
  4. Electrocution
  5. Equipment failure
  6. Traffic hazards

Control Measures:

  1. Contact with underground utilities: a. Before commencing excavation, the area must be inspected for underground utilities. b. Use a cable locator to identify the location of underground utilities. c. Hand excavation should be used to expose any underground utilities that cannot be located with a cable locator. d. Excavation should be conducted in a manner that minimises the risk of damaging underground utilities. e. Personnel responsible for underground utility identification and exposure should be trained and competent.
  2. Slips, trips and falls: a. Appropriate footwear should be worn. b. The work area should be clear of debris and other tripping hazards. c. Where possible, the work area should be barricaded or clearly marked. d. Workers should be trained on safe work practices for the work area.
  3. Confined space entry: a. A confined space entry permit should be obtained before entry into a confined space. b. Adequate ventilation should be provided before entry. c. The vacuum excavator should not be used for confined space entry. d. Workers should be trained in confined space entry procedures.
  4. Electrocution: a. The vacuum excavator should be kept clear of power lines. b. The vacuum excavator should be properly grounded. c. Personnel should not touch the vacuum excavator while it is in contact with power lines.
  5. Equipment failure: a. The vacuum excavator should be inspected prior to use. b. Any defects or faults should be reported and repaired before use. c. The vacuum excavator should be maintained in accordance with manufacturer’s instructions. d. Workers should be trained on the correct operation and maintenance of the vacuum excavator.
  6. Traffic hazards: a. The work area should be clearly marked and barricaded where necessary. b. Workers should wear high-visibility clothing. c. Workers should be trained on traffic management procedures.

Conclusion:

It is important that all workers involved in the operation of the Vacuum Excavator are trained and competent in the control measures outlined here. Any changes to the work or equipment must be assessed for potential hazards and appropriate control measures put in place.

Gary’s Safety Tips

Hey there, everyone! Today, I want to talk about something that might not be the most exciting topic in the world, but it’s incredibly important for anyone who works in construction or excavation: vacuum excavators.

Now, some of you might be thinking, “What’s the big deal? It’s just a fancy vacuum cleaner, right?” Well, yes and no. While vacuum excavators are certainly a powerful tool for digging and removing debris, they also come with some serious risks if not used properly.

First and foremost, one of the biggest dangers of working with a vacuum excavator is the risk of injury from the high-pressure air or water that powers the machine. If you or anyone on your team gets too close to the suction hose or the excavation nozzle, you could easily get knocked off your feet or even get your hand or arm sucked into the machine. Trust me, you do NOT want that to happen.

To avoid this risk, always make sure to stay a safe distance away from the excavation site while the vacuum excavator is in use. Never put your hands or any other body parts near the suction hose or nozzle, and make sure to wear sturdy, non-slip shoes so you don’t get knocked over by the force of the air or water.

Another risk to keep in mind is the potential for damage to underground utility lines or other buried infrastructure. While vacuum excavators are designed to be gentler on the ground than traditional digging methods, they can still cause damage if not used properly.

To avoid this risk, always make sure to have a clear understanding of the location and depth of any utility lines or other infrastructure before you start digging. If you’re not sure, use a utility locator or other tools to help you identify potential hazards. And always be careful when digging near any underground infrastructure, even if you think you know where it is.

Finally, it’s important to remember that vacuum excavators can also pose a fire hazard if not properly maintained. The high-pressure air and water used to power the machine can generate a lot of heat, which can cause flammable materials to ignite if they’re not handled properly.

To avoid this risk, always make sure to keep your vacuum excavator clean and well-maintained, and never use it near any open flames or other potential sources of ignition. And if you ever suspect that something might be wrong with your machine, be sure to get it checked out by a professional before using it again.

So those are some of the dangers to keep in mind when working with a vacuum excavator. But don’t let that scare you away from using this powerful tool – as long as you follow some basic safety guidelines, you can use a vacuum excavator to safely and efficiently complete all kinds of excavation projects.

To get you started, here are a few safety recommendations to keep in mind:

  1. Always wear appropriate personal protective equipment (PPE) when using a vacuum excavator, including gloves, eye protection, and sturdy footwear.
  2. Before starting any excavation work, make sure to thoroughly inspect your equipment and check for any signs of wear or damage.
  3. Always use the right nozzle and hose for the job at hand, and never use a nozzle that’s too small or too large for the material you’re working with.
  4. Keep a safe distance from the excavation site while the vacuum excavator is in use, and never put any body parts near the suction hose or nozzle.
  5. Make sure to properly dispose of any debris or waste material that’s collected by the vacuum excavator, and never leave it lying around where it could cause a hazard.

By following these simple safety recommendations, you can use a vacuum excavator to complete excavation projects quickly and safely, without putting yourself or anyone else at risk.

So there you have it, folks – some important safety tips to keep in mind when working with a vacuum excavator. Remember, safety should always be your top priority when working in construction or excavation. It’s not worth risking injury or property damage to save a little time or money.

But with that being said, don’t be afraid to use vacuum excavators in your excavation work. These machines can be incredibly powerful and efficient, and they can help you complete your projects much more quickly than traditional digging methods. Just make sure to always use them safely and responsibly, and you’ll be well on your way to success.

Thanks for tuning in, and I’ll catch you all next time!

Regards,

Vacuum Excavator Safe Work Method Statement (SWMS)

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Vacuum Excavator Safe Work Method Statement (SWMS)

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket

Verified by MonsterInsights