Call 1300 877 609 to find out about the latest offers available.

Transporting Plant and Machinery – Trucks and Trailers Safe Work Method Statement (SWMS)

SKU:SWMAU875

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Transporting Plant and Machinery – Trucks and Trailers Safe Work Method Statement (SWMS)

Introducing our Transporting Plant and Machinery – Trucks and Trailers Safe Work Method Statement (SWMS) Template! Designed to make your job easier and your team safer, this pre-filled and comprehensive template covers all aspects of transporting high-risk machinery on site. Let’s take a closer look at some of its key features:

  • Pre-filled and Comprehensive: Our SWMS template comes pre-filled with all the necessary information you need for transporting plant and machinery on site. It covers everything from project details to risk assessment and PPE requirements, making it a helpful tool for your safety needs.
  • Fully Editable and Customisable: Our template is fully editable and customisable in Microsoft Word format, so you can easily tailor it to suit your specific requirements. Whether you need to add or remove sections, update project details or adjust risk ratings, our template makes it easy to do so.
  • Includes Scope of the Project and Project Details: The SWMS template includes a detailed scope of the project and project details, ensuring all aspects of the job are covered and accounted for.
  • Checklist of Any High-Risk Machinery on Site: We understand that high-risk machinery can pose a serious safety risk on site. That’s why our template includes a checklist of any high-risk machinery that will be present, so you can take extra precautions and ensure safety measures are in place.
  • Space for Recording Staff Training: It’s important that your staff are properly trained and equipped to handle high-risk machinery. Our SWMS template includes space for recording any staff training, so you can keep track of who has received the necessary training and when.
  • Before and After Risk Ratings: Our template includes before and after risk ratings, so you can easily assess the effectiveness of your safety measures and make adjustments as needed.
  • Resources for Use of Legislative References: It can be difficult to keep track of all the necessary legislative references for transporting high-risk machinery. Our SWMS template includes resources to help you understand and implement the required legislative references.
  • All PPE Required: Personal protective equipment (PPE) is crucial for ensuring the safety of your staff. Our template includes a list of all the PPE required for transporting high-risk machinery on site.
  • Risk Assessment and Risk Assessment Matrix: A thorough risk assessment is essential for identifying potential hazards and developing effective safety measures. Our SWMS template includes a risk assessment and risk assessment matrix, so you can easily identify and mitigate risks.
  • Checklist to Ensure All Requirements Have Been Covered: Our template includes a checklist to ensure all requirements have been covered when implementing the SWMS. This helps to ensure that all necessary safety measures are in place and nothing is overlooked.
  • Sign-Off Page for All Workers and Responsible Persons: Our template includes a sign-off page for all workers and responsible persons, ensuring that everyone is aware of the safety measures in place and has agreed to follow them.
  • Easy to Use, Easy to Customise: Our SWMS template is designed to be user-friendly and easy to customise, so you can focus on getting the job done safely and efficiently.
  • Suitable for Large Contracts and Tenders, Including Tier 1 Contractual Work: Our template is suitable for large contracts and tenders, including tier 1 contractual work. Whether you’re working on a small or large-scale project, our SWMS template has you covered.
  • Instantly Delivered Download: Once you purchase our SWMS template, you’ll receive an instant download link. This means you can start using the template right away, saving you time and hassle.

Overall, our Safe Work Method Statement (SWMS) Template for Transporting Plant & Machinery – Trucks & Trailers is a helpful tool for any team working with high-risk machinery on site. It’s easy to use, easy to customise and covers all aspects of safety, from risk

Here is some safety information regarding transporting plant & machinery – trucks & trailers

Purpose: The purpose of this Safe Work Method Statement (SWMS) is to provide a framework for the safe transportation of plant and machinery using trucks and trailers. This SWMS is to be used in conjunction with the specific transport and handling procedures for each piece of equipment being transported.

Scope: This SWMS applies to the transportation of all plant and machinery, including but not limited to excavators, bulldozers, loaders, backhoes, cranes, and other heavy equipment, using trucks and trailers.

Responsibilities: The following individuals have specific responsibilities for ensuring the safety of the transportation of plant and machinery:

  1. The truck driver is responsible for ensuring that the truck and trailer are in good working order, properly loaded, and secured before transportation. They should also ensure that the load is within the allowable weight and dimensions limits.
  2. The operator of the plant or machinery being transported is responsible for ensuring that it is prepared for transportation, including disconnecting and securing all attachments and ensuring that fluids are drained, as required.
  3. The person coordinating the transportation is responsible for ensuring that all necessary permits and approvals are obtained and that the transportation is scheduled in a safe and efficient manner.

Hazards and Risks: The transportation of plant and machinery using trucks and trailers can pose various hazards and risks, including:

  1. Overloading the truck or trailer, which can lead to instability and loss of control.
  2. Inadequate securing of the load, which can lead to shifting or falling during transportation.
  3. Striking overhead obstructions, such as power lines and bridges, due to the height of the load.
  4. Poor visibility when reversing or maneuvering the truck and trailer.
  5. Unforeseen road conditions, such as steep inclines, narrow roads, and adverse weather conditions.
  6. Exceeding the allowable weight and dimension limits, resulting in legal penalties and safety risks.

Control Measures: To ensure the safe transportation of plant and machinery using trucks and trailers, the following control measures should be implemented:

  1. Ensure that the truck and trailer are in good working order and that the load is properly secured and within the allowable weight and dimension limits.
  2. Disconnect and secure all attachments and drain fluids, as required, before loading the plant or machinery.
  3. Ensure that the route is planned and that all necessary permits and approvals are obtained.
  4. Use appropriate signaling devices, such as flags and warning signs, to alert other road users of the oversized load.
  5. Use spotters to assist the truck driver when reversing or maneuvering the truck and trailer.
  6. Monitor weather conditions and adjust the transportation schedule accordingly.
  7. Provide appropriate training and instruction to truck drivers, plant operators, and other personnel involved in the transportation.

Emergency Procedures: In the event of an emergency during the transportation of plant and machinery, the following procedures should be followed:

  1. Stop the truck and trailer immediately and assess the situation.
  2. Notify the relevant emergency services, such as police and ambulance, if required.
  3. Implement appropriate emergency response procedures, such as evacuation or first aid, as necessary.
  4. Document the incident and report it to the appropriate authorities.

Conclusion: The safe transportation of plant and machinery using trucks and trailers requires careful planning, preparation, and implementation of control measures. By following this SWMS and specific transport and handling procedures for each piece of equipment, the risks associated with the transportation can be minimised, ensuring the safety of all personnel involved.

Gary’s Safety Tips

G’day everyone, it’s your mate Gary here, and today I wanna talk about something that’s been on everyone’s mind lately: safety protocols. Whether you’re at work, out and about, or just trying to live your daily life, following safety protocols is essential to keep yourself and those around you safe and healthy.

I know some of ya might be thinkin’, “Gary, come on mate, we’ve heard all this before.” But let me tell ya, following safety protocols is not somethin’ to take lightly. It’s easy to get complacent and start takin’ unnecessary risks, but the consequences can be severe. The last thing any of us want is to get sick or to spread sickness to others, especially in these times.

So, what are some of the safety protocols we should be followin’? Well, it really depends on the situation, but there are a few general rules that apply no matter where ya are. First and foremost, wear a mask. I know, I know, masks can be uncomfortable and annoying, but they’re also one of the most effective ways to prevent the spread of disease. If you’re in a crowded area or around other people, put on that mask and keep it on.

Next, practice social distancin’. Keep at least six feet between yourself and others whenever possible. This can be tough, especially in crowded places, but it’s worth it to reduce the risk of transmission. And hey, who knows, maybe ya’ll even enjoy the extra personal space!

Another important safety protocol is washin’ ya hands. This might seem obvious, but it’s somethin’ a lot of people still don’t take seriously enough. Make sure ya washin’ ya hands thoroughly and frequently, especially after touchin’ high-contact surfaces like doorknobs or shoppin’ carts. And if ya can’t wash ya hands, use hand sanitiser.

Finally, be aware of ya surroundings. Stay informed about any outbreaks or spikes in cases in ya area, and adjust ya behaviour accordingly. If you’re feelin’ sick, stay home and don’t risk spreadin’ the illness to others. And if ya around others who are sick, take extra precautions to protect yourself.

Now, I know some of ya might be thinkin’ that followin’ all these safety protocols is just too much of a hassle. But let me tell ya, it’s worth it. Not only will ya be keepin’ yourself and those around ya safe, but ya’ll also be doin’ ya part to help slow the spread of disease and get us all back to normal as soon as possible.

And here’s the thing, followin’ safety protocols doesn’t have to be all doom and gloom. Ya can still have fun and live ya life, ya just need to do it safely. Instead of goin’ out to crowded bars or restaurants, try havin’ a small gatherin’ with mates outdoors. Instead of goin’ to the gym, try workin’ out at home or goin’ for a run outside. And hey, who knows, maybe ya’ll even discover some new hobbies or activities ya never would have tried otherwise.

So, to sum it up, followin’ safety protocols is essential to keep yourself and those around you safe and healthy. Wear a mask, practice social distancin’, wash ya hands, be aware of ya surroundings, and adjust ya behaviour accordingly. It might be a hassle, but it’s worth it. And who knows, maybe we’ll all come out of this with some new habits and hobbies that’ll make us healthier and happier in the long run.

Thanks for tunin’ in,

Cheers,

Transporting Plant and Machinery – Trucks and Trailers Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Transporting Plant and Machinery – Trucks and Trailers Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket