Call 1300 877 609 to find out about the latest offers available.

Pressure Cooker Safe Work Method Statement

SKU:SWMAU923

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Pressure Cooker Safe Work Method Statement

Introducing our Safe Work Method Statement Template for using a pressure cooker – a helpful tool that is comprehensive, fully editable, and easy to use, ensuring safety and compliance on your project site. Here are the key features that make this template a valuable asset for managing risks and hazards:

  • Pre-filled and Comprehensive: Our SWMS template comes pre-filled with essential details, including the scope of the project, high-risk machinery on site, PPE requirements, risk assessment, and more. It is a comprehensive document that covers all bases.
  • Fully Editable and Customisable: We understand that every project is unique, and that is why our SWMS template is fully editable and customisable in Microsoft Word format. You can easily add or remove sections, adjust risk ratings, and tailor it to your specific needs.
  • Includes Before and After Risk Ratings: To make it easy for you to assess the effectiveness of your risk controls, our SWMS template includes before and after risk ratings. This helps you track your progress and make any necessary adjustments to your safety measures.
  • Includes Checklist of High-Risk Machinery on Site: To ensure that all high-risk machinery is identified and managed, our template includes a checklist that you can use to tick off each item as it is addressed.
  • Includes Space for Recording Staff Training: To ensure that all staff members are trained and competent in their tasks, our template includes space to record any relevant training and qualifications.
  • Includes Resources for Legislative References: Our SWMS template includes all the necessary legislative references and resources, so you can be confident that you are meeting all the legal requirements.
  • Includes All PPE Required: Our SWMS template specifies all the PPE that is required on the project site, ensuring that all workers are protected from potential hazards.
  • Includes Risk Assessment and Risk Assessment Matrix: Our SWMS template includes a risk assessment and risk assessment matrix that you can use to identify, assess, and control risks on the site.
  • Includes Checklist to Ensure All Requirements are Covered: To ensure that all requirements are met when implementing the SWMS, our template includes a comprehensive checklist that you can use to verify that everything has been covered.
  • Includes Sign-Off Page for All Workers and Responsible Persons: To ensure that everyone is aware of the SWMS and their responsibilities, our template includes a sign-off page that all workers and responsible persons must complete.
  • Easy to Use, Easy to Customise: Our SWMS template is designed to be user-friendly, with clear instructions and a logical layout. It is easy to use, and you can customise it to suit your specific needs.
  • Suitable for Large Contracts and Tenders: Our SWMS template is suitable for large contracts and tenders, including tier 1 contractual work. It is a professional, high-quality document that will impress potential clients and stakeholders.
  • Instantly Delivered Download: You don’t have to wait to get started on your project – our SWMS template is available for instant download, so you can start using it right away.

In summary, our Safe Work Method Statement Template for Pressure Cooker is a helpful tool that is comprehensive, fully editable, and easy to use, ensuring safety and compliance on your project site. With its many features, including before and after risk ratings, high-risk machinery checklist, and comprehensive checklist, you can be confident that you are meeting all the necessary requirements. Download our SWMS template today and start taking control of your project’s safety.

Here is some safety information regarding Pressure Cooker:

Hazard identification:

  • Burns and scalds due to high pressure and temperature.
  • Explosion due to over-pressurisation or misuse of the pressure cooker.
  • Contact with hot surfaces or steam.
  • Electrocution if the pressure cooker is faulty or improperly grounded.

Risk assessment:

  • The risk of burns and scalds is high if the pressure cooker is mishandled or if the safety valves fail.
  • The risk of explosion is low if the pressure cooker is used according to the manufacturer’s instructions and safety guidelines.
  • The risk of contact with hot surfaces or steam is moderate if proper PPE (personal protective equipment) is not used.
  • The risk of electrocution is low if the pressure cooker is properly grounded and inspected before use.

Control measures:

  1. Preparation
  • Check the pressure cooker for any damages or defects before use.
  • Ensure the pressure cooker is properly grounded and plugged into a power outlet.
  • Ensure the safety valves and pressure gauge are in good working condition.
  • Use only approved electrical cords and plugs.
  • Keep the pressure cooker away from flammable materials.
  • Use appropriate PPE, including heat-resistant gloves and aprons.
  1. Operating procedures
  • Follow the manufacturer’s instructions for operating the pressure cooker.
  • Do not overfill the pressure cooker beyond the maximum capacity.
  • Use only approved cooking liquids and do not use oil or fat.
  • Release the pressure before opening the pressure cooker.
  • Use tongs or other tools to remove the lid or contents of the pressure cooker to avoid contact with hot surfaces or steam.
  • Turn off the power and unplug the pressure cooker when it is not in use.
  1. Emergency procedures
  • In case of a fire, turn off the power and unplug the pressure cooker.
  • Do not attempt to remove the pressure cooker from the heat source.
  • Call emergency services if necessary.

Training and instruction:

  • All personnel using the pressure cooker must be trained and instructed in the safe use of the equipment.
  • Personnel must be informed of the hazards associated with using a pressure cooker and the control measures that must be taken to minimize risks.

Signage and barriers:

  • Signage must be displayed in the area where the pressure cooker is used, warning of the hazards associated with the equipment.
  • Barriers must be used to prevent unauthorised access to the pressure cooker.

Gary’s Safety Tips

Hey everyone, it’s important to know the ins and outs of pressure cookers, especially if you’re using them in a workplace setting. While they’re a great tool for cooking meals quickly and efficiently, they also come with some potential dangers that need to be addressed. Today, I want to talk about the safety recommendations for working with pressure cookers in a workplace.

First things first, it’s essential to always read the manufacturer’s instructions before using a pressure cooker. These instructions will give you the specific guidelines for your model of pressure cooker and ensure that you’re using it correctly. Make sure to pay close attention to the maximum fill line and never fill the pressure cooker beyond that point. Overfilling the pot can cause a dangerous buildup of pressure that could lead to an explosion.

Another crucial safety tip is to always release the pressure before opening the lid. Never try to open a pressure cooker while it’s still pressurised, as this can result in serious burns or injuries. The pressure release valve should be used to release the steam and pressure before attempting to open the lid. This step is vital, especially if you’re in a workplace environment where you may be rushed or distracted.

It’s also important to inspect the pressure cooker regularly for signs of wear or damage. Any cracks or dents in the pot or lid can weaken the structure of the pressure cooker and increase the risk of an explosion. If you notice any damage, stop using the pressure cooker immediately and have it inspected by a professional.

When using a pressure cooker in a workplace setting, it’s also important to ensure that all employees are properly trained in its use. This includes understanding the potential dangers of the pressure cooker and knowing how to operate it safely. Make sure to train employees on the proper use of the pressure release valve and the maximum fill line, as well as how to inspect the pot for damage.

Additionally, it’s crucial to maintain a clean workplace environment when using a pressure cooker. Make sure that the pot and lid are cleaned thoroughly after each use, as any leftover food or debris can interfere with the proper functioning of the pressure cooker. It’s also important to keep the pressure release valve and other parts of the pot clean and free from blockages.

One final safety tip is to always use the right amount of liquid when cooking with a pressure cooker. The steam that builds up inside the pot needs to have enough liquid to create pressure, so make sure to follow the recipe instructions carefully. Using too little liquid can cause the pressure cooker to overheat and potentially explode.

In conclusion, pressure cookers are a great tool for cooking meals quickly and efficiently, but they come with some potential dangers that need to be taken seriously. By following these safety recommendations, you can ensure that you and your employees are using pressure cookers safely in a workplace setting. Remember to always read the manufacturer’s instructions, release the pressure before opening the lid, inspect the pot for damage, train employees on proper use, maintain a clean workplace environment, and use the right amount of liquid when cooking. Stay safe, and happy cooking!

Cheers,

Pressure Cooker Safe Work Method Statement

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket