Call 1300 877 609 to find out about the latest offers available.

Plasma Cutter Safe Work Method Statement (SWMS)

SKU:SWMAU127

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Plasma Cutter Safe Work Method Statement (SWMS)

Introducing our Safe Work Method Statement for working with a plasma cutter – a comprehensive and pre-filled document that will help you manage risks associated with plasma cutting. Our SWMS is designed to help you maintain a safe work environment and comply with legislative requirements. Here are some key features that make our SWMS stand out:

  • Pre-filled and Comprehensive: Our SWMS comes pre-filled with information, but it also allows you to add additional information specific to your project, making it a comprehensive solution for all your plasma cutting needs.
  • Fully Editable and Customisable: Our SWMS is fully editable and customisable in Microsoft Word format, allowing you to easily edit and tailor it to suit your project’s requirements. This makes it an easy-to-use solution that can be customised for your specific needs.
  • Includes Scope and Project Details: Our SWMS includes the scope of the project and project details, which helps to ensure that all aspects of the project are considered, including potential hazards and risks.
  • Includes Checklist of High-Risk Machinery: We include a checklist of high-risk machinery on site, which ensures that all machinery is checked and maintained to prevent potential hazards.
  • Includes Recording Space for Staff Training: Our SWMS includes space for recording any staff training, which ensures that all staff are trained to use the machinery safely and efficiently.
  • Before and After Risk Ratings: We include before and after risk ratings, which allows you to assess the effectiveness of the safety measures that you have implemented.
  • Resources for Use of Legislative References: Our SWMS includes resources for use of legislative references, which ensures that you are complying with all relevant safety regulations.
  • Includes All PPE Required: Our SWMS includes all PPE required for safe plasma cutting. This ensures that all staff have the necessary PPE to protect themselves from potential hazards.
  • Risk Assessment and Risk Assessment Matrix: We include a risk assessment and risk assessment matrix, which helps to identify potential hazards and assess the level of risk associated with each hazard.
  • Checklist to Ensure All Requirements Covered: We include a checklist to ensure all requirements have been covered when implementing the SWMS, which helps to ensure that all necessary steps have been taken to maintain a safe work environment.
  • Sign Off Page for All Workers and Responsible Persons: Our SWMS includes a sign-off page for all workers and responsible persons, which ensures that everyone involved in the project acknowledges their responsibilities and obligations to maintain a safe work environment.
  • Easy to Use and Customise: Our SWMS is designed to be easy to use and customise, making it a flexible solution that can be tailored to suit your needs.
  • Suitable for Large Contracts and Tenders: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work, making it a valuable solution for any business.
  • Instantly Delivered Download: Our SWMS is available as an instant download, which means you can start using it right away.

Overall, our Safe Work Method Statement for working with a plasma cutter is a valuable tool that can help you maintain a safe work environment and comply with legislative requirements. With its comprehensive features and customisable format, it’s an easy-to-use solution that can be tailored to suit your specific needs.

Here is some safety information related to working with a plasma cutter.

 

  1. Hazard Identification and Risk Assessment:

a. Identify potential hazards associated with plasma cutter operation, such as electric shock, fire, explosion, burns, and exposure to fumes and noise. b. Assess the risks associated with the identified hazards, considering the likelihood and potential consequences of their occurrence. c. Implement control measures to eliminate or minimise the risks, such as using appropriate personal protective equipment (PPE), maintaining a safe distance from the cutting area, and ensuring adequate ventilation.

  1. Pre-operational checks:

a. Inspect the plasma cutter, power source, and cables for damage or defects. b. Check that the work area is clear of flammable materials and other hazards. c. Ensure that the power source is grounded and the circuit breaker is in the off position.

  1. Set up:

a. Select the appropriate consumables and adjust the cutting parameters based on the material being cut. b. Secure the workpiece to prevent movement during cutting. c. Position the plasma cutter and cables in a safe and ergonomic position. d. Check that the workpiece is positioned correctly and is free from any obstructions that may impede the cutting process.

  1. Operation:

a. Turn on the power source and adjust the cutting parameters as required. b. Hold the plasma cutter firmly and move it along the cutting line, keeping a safe distance from the workpiece and other people. c. Monitor the cutting process and adjust the cutting parameters if necessary. d. Stop the cutting process if any hazards or issues arise.

  1. Post-operational checks:

a. Turn off the power source and disconnect the plasma cutter cables. b. Inspect the workpiece for any defects or irregularities. c. Store the plasma cutter and consumables in a safe and secure location. d. Dispose of any waste materials in accordance with local regulations.

PPE Requirements:

a. Eye protection, such as safety glasses or goggles. b. Hearing protection, such as earplugs or earmuffs. c. Respiratory protection, such as a half-face respirator with P2 filters or a powered air-purifying respirator (PAPR). d. Hand protection, such as heat-resistant gloves. e. Clothing protection, such as a welding jacket or apron.

Gary’s Safety Tips

Hey there, folks! Today, I want to talk about an important topic that should not be taken lightly: the dangers of working with a plasma cutter.

Now, I know what you might be thinking – “Gary, I’m a professional, I know what I’m doing.” But here’s the thing, accidents can happen to even the most experienced of us. So, it’s important to take the necessary precautions to ensure our safety.

First off, let’s talk about the dangers of plasma cutters. Plasma cutters use a high-temperature plasma arc to cut through various metals. This means they produce a lot of heat and sparks, which can be a hazard if proper safety measures aren’t taken.

One of the biggest dangers of working with a plasma cutter is the risk of electrical shock. Plasma cutters use high voltage to create the plasma arc, which means you should never touch the electrode or the metal being cut while the cutter is on. Additionally, you should always wear gloves and protective clothing to avoid coming into contact with the metal being cut.

Another danger of plasma cutters is the risk of fire. The sparks produced during the cutting process can easily ignite flammable materials nearby. To prevent this, always make sure your workspace is clear of any flammable materials and keep a fire extinguisher on hand just in case.

Eye protection is also crucial when working with a plasma cutter. The bright light produced by the plasma arc can damage your eyes, so it’s important to wear a welding helmet or goggles with a shaded lens.

Now that we’ve covered some of the dangers of working with a plasma cutter, let’s talk about some safety recommendations to help you avoid these hazards.

First and foremost, always read the manufacturer’s instructions before operating a plasma cutter. This will give you a better understanding of how to use the cutter safely and what precautions you should take.

Make sure your workspace is well-ventilated to prevent the buildup of fumes and gases. Plasma cutting produces a lot of smoke and fumes, which can be harmful if inhaled. Use an exhaust system or work in an open area with good air flow to avoid breathing in these harmful substances.

When setting up your workspace, ensure that there is enough space for you to move around comfortably. This will help you avoid accidentally coming into contact with the plasma arc or the metal being cut.

Always wear protective clothing and gear, including gloves, long-sleeved shirts, pants, and closed-toe shoes. This will help protect your skin from the heat and sparks produced during the cutting process.

Before beginning your work, inspect your plasma cutter for any damage or loose parts. A damaged plasma cutter can be dangerous to use and should be repaired or replaced before use.

Finally, always have a first aid kit on hand in case of an accident. Accidents can happen even when taking proper precautions, so it’s important to be prepared for any potential injuries.

In conclusion, working with a plasma cutter can be dangerous if proper safety measures aren’t taken. However, by following these safety recommendations and being aware of the potential hazards, you can safely operate a plasma cutter and get your work done without any accidents. Remember, safety should always be your top priority!

Cheers,

Plasma Cutter Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Plasma Cutter Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket