Call 1300 877 609 to find out about the latest offers available.

Harrow Safe Work Method Statement (SWMS)

SKU:

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Harrow Safe Work Method Statement (SWMS)

Introducing our Harrow Safe Work Method Statement (SWMS)! Our SWMS is a comprehensive guide designed to help you and your team safely carry out harrowing operations while reducing the risk of accidents and injuries. Here are the key features of our SWMS:

  • Pre-filled and Comprehensive: Our SWMS is pre-filled with all the necessary details and comprehensive in its coverage of the required safety measures. This saves you valuable time and ensures that all critical aspects are covered.
  • Fully Editable and Customisable: Our SWMS comes in Microsoft Word format, making it easy to edit and customise according to your specific project requirements. This flexibility allows you to tailor the SWMS to suit your unique needs.
  • Includes the Scope of the Project and Project Details: Our SWMS includes a clear scope of the project, ensuring that all team members are aware of their roles and responsibilities. It also includes key project details, such as timelines and site locations.
  • Checklist of Any High-Risk Machinery on Site: Our SWMS includes a checklist of high-risk machinery that may be present on the site. This helps ensure that all equipment is in safe working order and that proper precautions are taken.
  • Space for Recording Staff Training: Our SWMS includes space for recording staff training, ensuring that everyone is adequately trained and competent to carry out the harrowing operations safely.
  • Before and After Risk Ratings: Our SWMS includes before and after risk ratings, allowing you to track and measure the effectiveness of the safety measures implemented.
  • Resources for Use of Legislative References: Our SWMS includes resources for the use of legislative references, ensuring compliance with all relevant legislation and regulations.
  • Includes all PPE Required: Our SWMS includes all the necessary personal protective equipment (PPE) required for safe harrowing operations.
  • Risk Assessment and Risk Assessment Matrix: Our SWMS includes a comprehensive risk assessment and risk assessment matrix, which helps identify potential hazards and assess the level of risk associated with each.
  • Checklist to Ensure All Requirements Have Been Covered: Our SWMS includes a checklist to ensure that all the required safety measures have been covered when implementing the SWMS.
  • Sign Off Page for All Workers and Responsible Persons: Our SWMS includes a sign off page for all workers and responsible persons, ensuring that everyone has read and understood the SWMS before commencing work.
  • Easy to Use and Customise: Our SWMS is user-friendly and easy to customise, ensuring that you can quickly and easily tailor it to suit your specific project requirements.
  • Suitable for Large Contracts and Tenders: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work.
  • Instantly Delivered Download: Our SWMS is an instantly downloadable product, allowing you to access it immediately and start using it right away.

We understand that workplace safety is of utmost importance, and our SWMS is designed to help you and your team carry out harrowing operations safely and efficiently. Get your copy today and start working towards a safer workplace!

Here is some safety information related to working with a harrow.

Hazards:

  • Risk of falls from height
  • Risk of cuts and lacerations
  • Risk of electric shock
  • Risk of struck by falling objects
  • Risk of manual handling injuries

Control Measures:

  1. Planning and Preparation
  • Conduct a site assessment to identify potential hazards and assess the risks involved in the task.
  • Develop a safe work method statement (SWMS) and communicate it to all workers involved in the task.
  • Ensure that all workers have the necessary skills, training, and experience to carry out the task safely.
  • Ensure that all necessary tools and equipment are in good working condition and appropriate for the task.
  1. Working at Height
  • Use appropriate fall protection equipment, such as harnesses, lanyards, and anchor points, when working at heights.
  • Ensure that all ladders, scaffolds, and elevated work platforms are in good condition and meet safety standards.
  • Erect barriers and signs to prevent unauthorised access to the work area.
  1. Handling Materials and Equipment
  • Use appropriate lifting equipment, such as cranes or forklifts, to lift heavy materials and equipment.
  • Use gloves and other protective equipment to prevent cuts and lacerations.
  • Ensure that all electrical tools and equipment are in good working condition and are properly grounded.
  1. Electrical Safety
  • Ensure that all electrical tools and equipment are properly grounded.
  • Use appropriate electrical safety equipment, such as insulation mats and gloves, when working with electrical equipment.
  • Ensure that all electrical equipment is inspected and tested regularly.
  1. First Aid
  • Ensure that a first aid kit is available on site.
  • Train workers in basic first aid and emergency procedures.
  • Ensure that all workers know the location of the first aid kit and how to access it in case of an emergency.

Gary’s Safety Tips

Hey everyone, Gary here! Today we’re going to talk about something serious – the dangers of working with a harrow and the safety precautions you need to take to protect yourself.

First of all, let me make one thing clear: a harrow is a powerful piece of farming equipment that is designed to break up soil, level the ground, and prepare it for planting. But it can also be extremely dangerous if not used properly. That’s why it’s essential to follow these safety recommendations when working with a harrow:

  1. Wear the right protective gear

The first rule of working with a harrow is to wear the right protective gear. This includes sturdy work boots, gloves, and protective eyewear. You should also wear long pants and a shirt with sleeves to protect your arms and legs from debris.

  1. Inspect the harrow before use

Before using the harrow, it’s important to inspect it thoroughly for any signs of damage or wear and tear. Check the blades, tines, and bearings for any signs of rust, cracks, or missing pieces. If you notice any issues, do not use the harrow until they have been repaired.

  1. Use the right tractor

It’s essential to use the right tractor when operating a harrow. Make sure the tractor is powerful enough to handle the weight of the harrow and that the hitch is securely attached to the tractor.

  1. Be aware of your surroundings

When operating a harrow, it’s important to be aware of your surroundings at all times. Look out for obstacles, such as rocks or tree stumps, that could damage the harrow or cause it to tip over. Also, be aware of any animals or people in the area and make sure they are safely out of the way before operating the harrow.

  1. Follow the manufacturer’s instructions

Always follow the manufacturer’s instructions when operating a harrow. This includes instructions on how to attach the harrow to the tractor, how to adjust the depth of the harrow blades, and how to operate the harrow safely.

  1. Use the right speed

When operating a harrow, it’s important to use the right speed. Going too fast can cause the harrow to bounce and skip, which can damage the ground and the harrow itself. Going too slow can also cause damage, as the harrow will not be able to properly break up the soil.

  1. Keep your hands and feet away from moving parts

Never put your hands or feet near the moving parts of a harrow. This includes the blades, tines, and bearings. If you need to make adjustments to the harrow, turn off the tractor and wait for the parts to come to a complete stop before making any changes.

  1. Never leave the harrow unattended

Never leave a harrow unattended, especially if it’s still attached to the tractor. Always make sure the harrow is properly secured before leaving it, and never leave it on an incline or uneven ground.

In conclusion, working with a harrow can be dangerous, but if you follow these safety recommendations, you can minimise the risks and stay safe. Always wear the right protective gear, inspect the harrow before use, use the right tractor, be aware of your surroundings, follow the manufacturer’s instructions, use the right speed, keep your hands and feet away from moving parts, and never leave the harrow unattended. By taking these precautions, you can safely and effectively use a harrow to prepare your soil for planting. Stay safe out there, and I’ll catch you in the next one!

Regards,

Harrow Safe Work Method Statement (SWMS)

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Harrow Safe Work Method Statement (SWMS)

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket

Verified by MonsterInsights