Call 1300 877 609 to find out about the latest offers available.

Flatbed Truck Safe Work Method Statement (SWMS)

SKU:

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Flatbed Truck Safe Work Method Statement (SWMS)

Introducing our Flatbed Truck Safe Work Method Statement! Our SWMS is designed to help businesses manage high-risk activities when using a flatbed truck on site. We understand the importance of safety in the workplace, and our product is a tool that can help you manage and mitigate risks.

Here are some of the key features that make our SWMS stand out:

Pre-filled and Comprehensive: Our SWMS is pre-filled with comprehensive information to help you manage your flatbed truck activity safely. It includes all the essential details that you need to manage your project effectively.

Fully editable and customisable: Our SWMS comes in Microsoft Word format, which means you can easily edit and customise it to fit your specific needs. This feature makes it easy to incorporate your company branding, project details, and specific requirements.

Checklist of high-risk machinery: Our SWMS includes a checklist of any high-risk machinery on site. It helps to ensure that you are aware of the potential hazards associated with the use of these machines.

Recording staff training: Our SWMS includes space for recording any staff training. This feature helps to ensure that your workers have received the necessary training to operate the flatbed truck safely.

Before and after risk ratings: Our SWMS includes before and after risk ratings. This feature helps to identify potential risks before starting the activity and assess the effectiveness of the controls used after completion of the work.

Legislative references: Our SWMS includes resources for use of legislative references. It helps you stay up to date with the latest legal requirements and ensures that your operation is fully compliant.

PPE requirements: Our SWMS includes all PPE required for the flatbed truck activity. This feature ensures that your workers have access to the necessary safety equipment to perform the job safely.

Risk assessment and matrix: Our SWMS includes a risk assessment and risk assessment matrix. It helps to identify potential risks associated with the activity and determine the likelihood and severity of those risks.

Checklist for all requirements: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS. This feature helps to ensure that no critical aspect of the project has been overlooked.

Sign-off page: Our SWMS includes a sign-off page for all workers and responsible persons. This feature helps to ensure that all parties involved in the project have read and agreed to follow the SWMS.

Easy to use and customise: Our SWMS is easy to use and customise, making it a perfect tool for managing flatbed truck activities on site. You can quickly and easily modify the document to meet your specific requirements.

Suitable for large contracts and tenders: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work. It provides a comprehensive solution for managing your flatbed truck activity on site.

Instantly delivered download: Our SWMS is available for instant download, making it easy and convenient for you to get started with your project right away.

Overall, our SWMS is an essential tool for managing the risks associated with using a flatbed truck on site. It’s comprehensive, easy to use, and fully customisable to meet your specific needs. By using our SWMS, you can be confident that you’re taking the necessary steps to ensure a safe workplace for everyone involved in the project.

Here is some safety information related to working with a flatbed truck.

Tasks involved:

  1. Conduct pre-operational checks of the flatbed truck
  2. Load and secure cargo onto the flatbed truck
  3. Drive the flatbed truck to the designated location
  4. Unload cargo from the flatbed truck
  5. Conduct post-operational checks of the flatbed truck

Hazards:

  • Risk of injury from manual handling
  • Risk of slips, trips, and falls while loading and unloading cargo
  • Risk of collision or rollover while driving the flatbed truck
  • Risk of damage to the cargo due to inadequate securing or handling
  • Risk of damage to the flatbed truck or other vehicles or property in the area

Control Measures:

  1. Conduct pre-operational checks of the flatbed truck before each use, including brakes, steering, lights, and tires, to ensure it is in safe working condition.
  2. Use appropriate personal protective equipment (PPE), such as safety shoes, gloves, and high-visibility clothing, to reduce the risk of injury.
  3. Use mechanical lifting aids, such as forklifts or cranes, to lift and load heavy or awkward cargo.
  4. Secure cargo properly using tie-downs, straps, chains, or other suitable restraints to prevent movement or damage during transportation.
  5. Follow safe driving practices, such as obeying speed limits, avoiding distractions, and maintaining a safe distance from other vehicles.
  6. Ensure that the flatbed truck is parked in a secure area and chocked to prevent it from moving while loading or unloading cargo.
  7. Conduct post-operational checks of the flatbed truck after each use, including brakes, lights, and tires, to ensure it is in safe working condition.
  8. Use appropriate warning signs or barriers to alert other workers or members of the public to the presence of the flatbed truck in the area.

Emergency Procedures:

  1. In the event of an injury or medical emergency, call 911 or the designated emergency number immediately.
  2. In the event of a fire, follow the company’s fire safety procedures and evacuate the area immediately.
  3. In the event of an accident or collision, report the incident to the supervisor and complete an incident report form.
  4. In the event of a hazardous spill, follow the company’s spill response procedures and contain the spill to prevent it from spreading.

Gary’s Safety Tips

Hey, everybody! Today, I want to talk about the dangers and safety recommendations for working with a flatbed truck. Now, I know some of you out there might be thinking, “Gary, what’s the big deal? It’s just a truck.” But let me tell you, flatbed trucks can be dangerous if you don’t know what you’re doing.

First and foremost, let’s talk about the dangers. Flatbed trucks have a lot of potential hazards that you need to be aware of. One of the biggest dangers is the risk of falling. When you’re working on a flatbed truck, you’re often up high, which means you’re at risk of falling off. This can be especially dangerous if you’re carrying heavy loads.

Another danger to be aware of is shifting cargo. When you’re carrying loads on a flatbed truck, it’s important to make sure that they’re properly secured. If they’re not, they can shift during transport, which can be dangerous. Imagine driving down the highway at 60 miles per hour and suddenly having your cargo shift and fall off the truck. Not a good situation.

Flatbed trucks also have blind spots, just like any other vehicle. However, the blind spots on a flatbed truck are much larger than those on a car or pickup truck. This means that it can be difficult to see other vehicles, pedestrians, or obstacles around the truck. It’s important to always be aware of your surroundings when you’re driving a flatbed truck.

So, what can you do to stay safe when working with a flatbed truck? Here are some safety recommendations:

  1. Always wear proper safety gear: When you’re working with a flatbed truck, it’s important to wear the proper safety gear. This includes a hard hat, safety glasses, and steel-toed boots. This gear will help protect you from falling objects and other hazards.
  2. Secure your loads: As I mentioned earlier, one of the biggest dangers of working with a flatbed truck is shifting cargo. Make sure that your loads are properly secured before you hit the road. Use straps, chains, or other tie-downs to keep your cargo in place.
  3. Be aware of your surroundings: As I mentioned earlier, flatbed trucks have large blind spots. Make sure that you’re always aware of your surroundings when you’re driving. Use your mirrors and be on the lookout for other vehicles, pedestrians, and obstacles.
  4. Get proper training: If you’re new to working with flatbed trucks, it’s important to get proper training. This will teach you the ins and outs of working with these vehicles and will help you stay safe on the job.
  5. Perform regular maintenance: Like any other vehicle, flatbed trucks require regular maintenance to stay in good working order. Make sure that you’re performing regular inspections and addressing any issues that arise.

In conclusion, working with a flatbed truck can be dangerous if you’re not careful. However, if you take the proper safety precautions, you can minimise the risks and stay safe on the job. Always wear proper safety gear, secure your loads, be aware of your surroundings, get proper training, and perform regular maintenance. Stay safe out there, everyone!

Regards,

Flatbed Truck Safe Work Method Statement (SWMS)

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Flatbed Truck Safe Work Method Statement (SWMS)

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket

Verified by MonsterInsights