Call 1300 877 609 to find out about the latest offers available.

WHS System Packages

Industry Specific and Customised Safety Management Systems

ISO 9001 Quality Packages

Quality Assurance Documentation System Packages

ISO 45001 Safety Packages

Industry Specific ISO 45001 Safety Management System Packages

NDIS & Aged Care Packages

NDIS and Aged Care Documentation Systems and Related Services

Unlock the latest package deals.

1300 877 609

Clearing Vegetation From Site Safe Work Method Statement (SWMS)

SKU:SWMS34745

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile

Download a Sample SWMS

Clearing Vegetation From Site Safe Work Method Statement (SWMS)

Safe Work Method Statement Template for Clearing Vegetation From Site

  • Pre-filled and Comprehensive:
    The template comes pre-filled with comprehensive information regarding the safe work method statement for clearing vegetation from a site of excavation and earthmoving. This saves your time and effort in creating the document from scratch.
  • Fully editable and customisable in Microsoft Word format:
    The template is provided in Microsoft Word format, allowing for easy editing and customization to suit your specific project requirements. You can update the content, add or remove sections as needed, making it a flexible tool for developing SWMS.
  • Includes scope of the project and project details:
    The template includes a section to outline the scope of the project and provide specific project details, helping ensure that all aspects of the clearing vegetation process are adequately addressed and documented.
  • Checklist of high-risk machinery on site:
    To enhance safety, a checklist is included to identify any high-risk machinery present on the site. This ensures that appropriate control measures are implemented to minimize the risks associated with operating such machinery.
  • Space for recording staff training:
    There is dedicated space within the template to record the training and competency details of the staff involved in the clearing vegetation process. This allows for better management of human resources and ensures the workforce is adequately trained for their roles.
  • Before and after risk ratings:
    The template includes sections to assess the level of risk both before and after implementing control measures. This enables you to monitor the effectiveness of the risk control measures implemented during the vegetation clearing process.
  • Resources for legislative references:
    The template provides resources and references to relevant legislation and regulations, ensuring compliance with the required standards and procedures. This helps you stay up-to-date with legal obligations related to vegetation clearing in excavation and earthmoving projects.
  • Includes all PPE required:
    A comprehensive list of personal protective equipment (PPE) required during vegetation clearing activities is included in the template. This helps ensure the safety of workers by outlining the necessary protective gear to prevent injuries or accidents.
  • Risk assessment and risk assessment matrix:
    The template incorporates a risk assessment section allowing you to identify, assess, and prioritize potential risks associated with vegetation clearing operations. It also includes a risk assessment matrix for better risk management and decision-making.
  • Checklist to ensure all requirements are covered:
    A checklist is provided within the template to help you ensure that all necessary steps and requirements have been adequately addressed when implementing the Safe Work Method Statement. It serves as a handy tool to verify compliance and completion of tasks.
  • Sign off page for all workers and responsible persons:
    The template includes a sign-off page where all workers involved and responsible persons can acknowledge their understanding and agreement to abide by the stated Safe Work Method Statement. This helps promote accountability and collective commitment to safety.
  • Easy to use and customize:
    Designed with a user-friendly interface, the template is easy to navigate and modify to suit your specific needs. Its clear structure and intuitive layout make it accessible even for individuals who may not be experienced in creating SWMS documents.
  • Suitable for large contracts and tenders:
    The Safe Work Method Statement Template is designed to meet the requirements of large contracts and tenders, including tier 1 contractual work. This ensures that you are adequately prepared to meet the demands of larger projects and comply with documentation standards.
  • Instantly delivered download:
    As soon as your purchase is completed, you will receive an instant download link, allowing you to access and start using the template right away. This eliminates any delays in obtaining the necessary resources for efficiently managing your vegetation clearing project.

Risks Associated with Clearing Vegetation From Site:

Clearing vegetation from a site of excavation and earthmoving poses several risks to workers’ health and safety. These risks include:

  • Falling branches or trees: When clearing vegetation, there is a risk of branches or trees falling unpredictably, potentially causing serious injuries or fatalities.
  • Exposure to harmful plants: Some vegetation, such as poison ivy or thorny bushes, may cause allergic reactions or skin irritations when it comes into contact with the skin.
  • Slips, trips, and falls: Uneven ground, loose debris, or hidden obstacles beneath the vegetation can create hazards that may result in slips, trips, or falls.
  • Entanglement in machinery: Workers operating machinery for clearing vegetation may face the risk of entanglement if they are not properly trained or if equipment is faulty.
  • Hazardous wildlife encounters: Some vegetation may house snakes, spiders, or other hazardous wildlife, increasing the chances of bites or stings.
  • Exposure to dust and airborne particles: During the clearing process, dust and other airborne particles may be released, posing respiratory health risks to workers.

How a Safe Work Method Statement for Clearing Vegetation From Site will help mitigate these risks:

A Safe Work Method Statement (SWMS) provides a systematic approach to identifying, assessing, and controlling potential risks associated with clearing vegetation on excavation and earthmoving sites. It outlines specific measures that must be followed to minimize the risks mentioned above. Some ways in which an SWMS can help mitigate these risks are:

  • Hazard identification: The SWMS will prompt a thorough assessment and identification of potential hazards, ensuring that workers are aware of the associated risks before commencing clearance activities.
  • Safe work procedures: The SWMS will outline step-by-step safe work procedures for clearing vegetation, including the use of appropriate personal protective equipment (PPE) to minimize the risk of injuries or exposure to harmful plants.
  • Machinery operation guidelines: The SWMS will provide guidelines for safe machinery operation, including regular maintenance checks and proper training requirements, reducing the risk of accidents and entanglement.
  • Prevention of wildlife encounters: The SWMS can include measures to identify and manage potential wildlife hazards, such as conducting a pre-clearing inspection or calling in experts to handle hazardous animals.
  • Dust control measures: The SWMS should address control measures to minimize dust generation, such as using water suppression systems or wearing respiratory protection to reduce the risk of respiratory ailments.

By following the steps and recommendations outlined in the Safe Work Method Statement for Clearing Vegetation From Site, workers can increase their awareness of the risks involved and implement proactive measures to safeguard their health and safety while carrying out vegetation clearing activities during excavation and earthmoving projects.

Gary’s Safety Tips

Tips for creating a Clearing Vegetation From Site Safe Work Method Statement

Alright, mate! Let’s jump right into it. Creating a Clearing Vegetation From Site Safe Work Method Statement is crucial when it comes to ensuring the safety of workers and properly managing risks on the job site. Today, I’m going to share with you some tips that will help you create a robust statement that covers all the bases.

1. Identify the Hazards: The first step in developing a safe work method statement is to identify all potential hazards associated with clearing vegetation from the site. This could include falling trees, uneven terrain, poisonous plants, or even wildlife. Take the time to thoroughly assess the site and make a list of these hazards.

2. Evaluate the Risks: Once you’ve identified the hazards, it’s important to assess the level of risk they pose. Consider the likelihood and severity of each hazard and determine what control measures need to be put in place. This might involve using personal protective equipment (PPE), implementing exclusion zones, or using specific tools and machinery for certain tasks.

3. Involve Your Team: Safety is a team effort, so make sure to involve your workers in the development of the method statement. They are the ones who will be executing the tasks, so their input is invaluable. Encourage them to share their insights and experiences to ensure all potential risks are covered.

4. Specify Control Measures: Once you have identified and evaluated the hazards, it’s time to specify the control measures that will be implemented. Be as detailed as possible, outlining the steps that need to be taken to mitigate each risk. For example, if there are overhead power lines nearby, specify that an exclusion zone must be established and only qualified personnel are allowed to perform work within that area.

5. Provide Adequate Training: It’s not enough to simply outline the control measures; you also need to ensure that your workers are properly trained on how to implement them. Make sure they receive comprehensive training on using tools and machinery safely, understanding the dangers of poisonous plants, and following proper procedures for clearing vegetation.

6. Regularly Review and Update: Safety is an ongoing process, so your Safe Work Method Statement should be regularly reviewed and updated as required. This includes conducting regular site inspections to identify any new hazards or changes to existing ones. It’s important to communicate any updates to your team and provide them with the necessary information and training.

7. Documentation and Communication: Keep thorough records of all Safe Work Method Statements and related documentation. Ensure that they are easily accessible to all workers and contractors involved in the project. Regularly communicate the importance of adhering to the statement and encourage open dialogue about safety concerns.

8. Seek Expert Advice: If you’re unsure about any aspect of developing a Safe Work Method Statement, don’t hesitate to seek expert advice. Consult with industry professionals, government agencies, or safety experts who can provide guidance and ensure you’re meeting all legal requirements.

Remember, mate, safety should always be the number one priority on any job site. By creating a robust Clearing Vegetation From Site Safe Work Method Statement, you’re not only protecting your workers but also minimizing risks and potential incidents. So take the time to do it right, involve your team, and ensure everyone goes home safe at the end of each day.

Clearing Vegetation From Site Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Clearing Vegetation From Site Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket