Call 1300 877 609 to find out about the latest offers available.

Docking Saw Safe Work Method Statement (SWMS)

SKU:SWMAU200

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Docking Saw Safe Work Method Statement (SWMS)

Introducing our Safe Work Method Statement (SWMS) for using a docking saw, a comprehensive solution for ensuring safety in the workplace. Our SWMS is designed to provide a comprehensive guide for all employees who use a docking saw on their job sites. Here are some key features that make our SWMS stand out:

  • Pre-filled and Comprehensive: Our SWMS comes pre-filled with all the necessary details for using a docking saw safely. It covers all aspects of the job, including scope of work, PPE requirements, risk assessments, and more.
  • Fully editable and customisable: Our SWMS is provided in Microsoft Word format, making it easy for users to edit and customise it to suit their specific needs. This feature ensures that the SWMS is adaptable to any work site or job.
  • Includes project details: Our SWMS includes all relevant project details, making it easy to understand the job requirements and the role of the docking saw in the project.
  • Checklist of high-risk machinery: Our SWMS provides a checklist of all high-risk machinery on site, helping employees identify potential hazards and take steps to mitigate them.
  • Staff training records: Our SWMS includes space for recording staff training, ensuring that all employees are trained to use the docking saw safely and correctly.
  • Before and after risk ratings: Our SWMS includes a space to record the risk rating before and after the use of the docking saw, providing an accurate record of the effectiveness of the SWMS.
  • Resources for legislative references: Our SWMS provides all relevant legislative references and resources for users to refer to, ensuring that they are always up to date with the latest regulations.
  • All PPE required: Our SWMS lists all necessary PPE requirements for using the docking saw, ensuring that employees are adequately protected from potential hazards.
  • Risk assessment and risk assessment matrix: Our SWMS provides a comprehensive risk assessment and risk assessment matrix, ensuring that all potential hazards are identified and addressed.
  • Checklist for implementation: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS, providing a thorough guide for employees.
  • Sign off page for workers and responsible persons: Our SWMS includes a sign-off page for all workers and responsible persons, ensuring that everyone is aware of their responsibilities and has agreed to follow the SWMS.
  • Easy to use and customise: Our SWMS is designed to be easy to use and customise, making it a practical solution for all employees using a docking saw.
  • Suitable for large contracts and Tenders: Our SWMS is suitable for large contracts and Tenders, including tier 1 contractual work, providing a reliable solution for all job sites.
  • Instantly delivered download: Our SWMS is available as an instantly downloadable document, ensuring that users can access it quickly and easily.

In summary, our Safe Work Method Statement for using a docking saw provides a comprehensive and adaptable solution for ensuring safety in the workplace. It is designed to be easy to use and customise, making it a practical solution for all job sites, including large contracts and Tenders. Download our SWMS today and ensure that your employees are working safely and confidently with a docking saw.

Here is some safety information related to using a docking saw.

  1. Hazards Identification:
  • The potential for contact with sharp blades of the docking saw.
  • The risk of hand and finger injuries while operating the saw.
  • The potential for dust and debris to cause respiratory issues.
  • The possibility of tripping or slipping due to the presence of cords or debris on the work area.
  1. Control Measures:
  • Only trained and authorised personnel should operate the docking saw.
  • Protective gloves, safety glasses, earplugs, and a dust mask should be worn at all times when operating the saw.
  • The saw should be regularly checked and maintained to ensure it is in good working condition.
  • Ensure that the saw blade is securely attached before operating.
  • The work area should be kept clean and free from clutter.
  • Any cords should be properly secured to avoid tripping hazards.
  • The operator should be mindful of their position and ensure they are not standing in the line of fire.
  1. Procedure:
  • Before starting the saw, ensure the blade is in good condition and properly attached.
  • Turn on the saw and wait for the blade to reach full speed before beginning to cut.
  • Hold the material being cut securely in place and guide it through the blade.
  • If necessary, use a push stick or other tool to maintain a safe distance between the operator’s hands and the blade.
  • Once the cut is complete, turn off the saw and wait for the blade to come to a complete stop before removing the cut material.
  • Ensure the work area is clean and free from debris before leaving.
  1. Emergency Procedures:
  • In case of an emergency, immediately turn off the saw and remove the power cord from the outlet.
  • If there is an injury, provide first aid and seek medical attention if necessary.
  • Report the incident to the appropriate personnel.
  1. Training Requirements:
  • All operators of the docking saw must receive training on the safe use of the saw.
  • The training should cover the hazards associated with the saw, the control measures in place, and the proper operating procedures.
  • The training should be documented and kept on file.

Gary’s Safety Tips

Hey everyone, it’s your pal Gary here to talk to you about an important topic that often gets overlooked in the workplace – safety when working with a docking saw.

Now, I know what you’re thinking – “Gary, why are you talking about safety? We already know how to use a saw!” But let me tell you, accidents can happen even to the most experienced workers. That’s why it’s important to always keep safety in mind when working with a docking saw.

First and foremost, make sure you’re wearing the proper safety equipment. This includes eye protection, ear protection, and gloves. You should also wear clothing that covers your arms and legs to protect against any flying debris. Don’t forget to tie back long hair or remove any loose jewellery that could get caught in the saw.

When setting up the saw, make sure it’s on a stable surface and that the blade is properly aligned. This will help prevent any kickback or blade deflection that could result in injury. Make sure the saw blade is sharp and clean, and that the blade guard is in place and functioning properly. Don’t try to use a saw that’s damaged or in need of repair.

When cutting, always keep both hands on the saw and keep your body positioned away from the blade. Don’t try to rush through the cut – take your time and let the saw do the work. If you feel uncomfortable or unsure about a cut, stop and reassess before proceeding. Never force the saw through the material – this can cause kickback and result in serious injury.

Always be aware of your surroundings when using a docking saw. Keep a clear workspace and make sure there’s enough room for the saw to move freely. Don’t work in an area where there are distractions or other people moving around. If someone approaches you while you’re using the saw, stop and wait until they’re clear before continuing.

Another important aspect of safety when using a docking saw is proper maintenance and cleaning. Make sure the saw is cleaned and oiled regularly to prevent buildup and rust. Check the blade for any chips or cracks and replace as needed. Keep the saw blade sharp to prevent binding and kickback.

It’s also important to know when not to use a docking saw. If you’re feeling tired or distracted, it’s best to step away from the saw and come back when you’re feeling more focused. Never use a saw while under the influence of drugs or alcohol. If you’re not feeling well or have any physical limitations, don’t try to use the saw – it’s not worth the risk.

In the event of an accident, it’s important to know what to do. First, stop the saw and turn off the power. Assess the situation and call for help if needed. Don’t try to remove any material from the saw blade while it’s still running. Seek medical attention immediately if you’ve been injured.

Overall, working with a docking saw can be a safe and effective way to cut materials. However, it’s important to always keep safety in mind and follow proper procedures. By wearing the proper safety equipment, setting up the saw correctly, taking your time with cuts, being aware of your surroundings, and properly maintaining the saw, you can help prevent accidents and injuries. Remember, safety should always come first!

Cheers,

Docking Saw Safe Work Method Statement (SWMS)

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Docking Saw Safe Work Method Statement (SWMS)

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket