Call 1300 877 609 to find out about the latest offers available.

Welding Safe Work Method Statement (SWMS)

SKU:SWMAU876

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Welding Safe Work Method Statement (SWMS)

Introducing our Welding Safe Work Method Statement (SWMS) Template – a helpful tool to keep you and your team safe on the job. With this pre-filled and comprehensive template, you can ensure that all necessary precautions have been taken to mitigate risks and hazards. Let’s dive into the key features of our SWMS Template:

  • Pre-filled and Comprehensive: Our SWMS Template comes pre-filled with all the necessary information for welding projects, including hazard identification, risk assessment, and control measures. We’ve done the heavy lifting so you can focus on the job at hand.
  • Fully Editable and Customisable: Our template is provided in Microsoft Word format, making it easy to edit and customise to suit your specific needs. Add your project details, adjust the risk assessment matrix, and tailor the PPE requirements to suit your site.
  • Includes Scope of Project and Project Details: The SWMS Template includes space to outline the scope of the project and any relevant project details, ensuring that everyone on the job is on the same page.
  • Includes Checklist of High-Risk Machinery: Welding often involves the use of high-risk machinery, which is why we’ve included a checklist to ensure all machinery is properly identified and controlled.
  • Includes Space for Recording Staff Training: Keep track of staff training and ensure that everyone on the job is properly trained and qualified to perform their tasks.
  • Includes Before and After Risk Ratings: Our template includes space to record before and after risk ratings, allowing you to track the effectiveness of your control measures.
  • Includes Resources for Legislative References: Stay on top of all relevant legislation with our included resources for legislative references.
  • Includes PPE Requirements: The SWMS Template outlines all necessary PPE requirements for welding projects, ensuring that everyone on the job is properly equipped and protected.
  • Includes Risk Assessment and Risk Assessment Matrix: Our template includes a thorough risk assessment and a risk assessment matrix, allowing you to identify and control all potential hazards.
  • Includes Checklist for Implementing SWMS: Our template includes a handy checklist to ensure that all necessary requirements have been covered when implementing the SWMS.
  • Includes Sign-Off Page: Our SWMS Template includes a sign-off page for all workers and responsible persons, ensuring that everyone is aware of their responsibilities and has agreed to follow the SWMS.
  • Easy to Use and Customise: Our SWMS Template is user-friendly and easy to customise, allowing you to get started quickly and easily.
  • Suitable for Large Contracts and Tenders: Our template is suitable for large contracts and tenders, including tier 1 contractual work.
  • Instantly Delivered Download: Once you purchase our SWMS Template, you’ll receive an instantly downloadable link to get started right away.

At our company, we believe that safety should always come first, and our Safe Work Method Statement Template for welding is a helpful tool to ensure that your team stays safe on the job. Get your hands on our template today and take the first step towards a safer workplace!

Here is some safety information regarding working in welding.

Objective: To ensure the safety of all workers involved in welding operations on site.

Scope: This safe work method statement applies to all welding operations undertaken on the site, including but not limited to arc welding, gas welding, and spot welding.

Responsibilities:

  • The Site Manager is responsible for ensuring that all workers are informed of and comply with this Safe Work Method Statement.
  • The Welding Supervisor is responsible for overseeing all welding operations and ensuring that all workers are using appropriate PPE and following safe work practices.
  • All workers are responsible for following safe work practices, using appropriate PPE, and reporting any safety concerns to the Welding Supervisor or Site Manager.

Hazards and Risks:

  • Burns from hot materials and equipment
  • Electric shock from welding equipment
  • Exposure to hazardous fumes and gases
  • Fire and explosion risks
  • Noise exposure

Control Measures:

  • All workers involved in welding operations must wear appropriate PPE, including welding helmets, gloves, aprons, and safety glasses.
  • All welding equipment must be regularly maintained and inspected for defects or damage.
  • All workers must be trained in the safe operation of welding equipment and must follow safe work practices.
  • Adequate ventilation must be provided to prevent exposure to hazardous fumes and gases.
  • All welding operations must be conducted in a designated area that is clear of flammable materials and other hazards.
  • Fire extinguishers must be readily available and workers must be trained in their use.
  • Workers must use noise-cancelling ear protection to protect against noise exposure.

Procedure:

  • Before starting any welding operation, the Welding Supervisor must ensure that all workers are wearing appropriate PPE and that the welding equipment is in good working order.
  • The Welding Supervisor must designate a clear area for welding operations, ensuring that it is free from flammable materials and other hazards.
  • Adequate ventilation must be provided in the designated area to prevent exposure to hazardous fumes and gases.
  • The Welding Supervisor must ensure that fire extinguishers are readily available and that all workers are trained in their use.
  • Workers must use noise-cancelling ear protection to protect against noise exposure.
  • Once the welding operation is complete, the Welding Supervisor must inspect the work to ensure that it has been carried out to the required standard and that all equipment has been properly stored.
  • The Welding Supervisor must ensure that all workers are aware of and comply with this Safe Work Method Statement.

Emergency Procedures:

  • In the event of an emergency, all workers must stop welding immediately and follow the Site Manager’s instructions.
  • If a fire breaks out, workers must use the appropriate fire extinguisher to extinguish the fire or evacuate the area immediately.
  • If someone is injured, workers must administer first aid and contact emergency services as required.

Review:

This Safe Work Method Statement will be reviewed regularly and updated as required to ensure that it remains effective and up to date with current workplace practices and regulations.

Gary’s Safety Tips

Hello,  today we will be discussing the importance of incorporating risk management into safe work method statements. Risk management is crucial when it comes to workplace safety, and it is essential to include it in your safe work method statements.

Risk management involves identifying, assessing, and controlling risks that could potentially harm people, property or the environment. It is all about taking proactive steps to minimise the likelihood and severity of negative outcomes.

Managing risk is vital for workplace safety and helps protect your business from financial and reputational damage. By identifying and controlling risks, you can prevent accidents and injuries from occurring. In the event of an accident, it can be costly in terms of insurance claims, legal fees, and lost productivity. Additionally, if your workplace is perceived as unsafe, it can harm your reputation and make it challenging to attract and retain employees.

To incorporate risk management into your safe work method statements, follow these steps:

  1. Identify the hazards: The first step in managing risk is to identify the hazards that exist in your workplace. This could include physical hazards such as machinery and chemicals or environmental hazards like noise and temperature extremes. Take the time to walk through your workplace and identify all potential hazards.
  2. Assess the risks: Once you’ve identified the hazards, the next step is to assess the risks associated with each one. This involves considering the likelihood and severity of a potential incident and determining how you can minimise or eliminate the risk altogether.
  3. Control the risks: Once you’ve assessed the risks, it’s time to take steps to control them. This could involve implementing engineering controls like barriers or ventilation systems or administrative controls like training and supervision. The goal is to reduce the likelihood and severity of an incident as much as possible.
  4. Document it all: Finally, it’s important to document everything you’ve done to manage risk. This includes documenting the hazards you’ve identified, the risk assessments you’ve conducted, and the controls you’ve put in place. This documentation should be included in your safe work method statements so that everyone in your workplace is aware of the risks and how to control them.

Incorporating risk management into your safe work method statements is essential for keeping your workplace safe and protecting your business from financial and reputational damage. By identifying hazards, assessing risks, controlling those risks, and documenting everything you’ve done, you can minimise the likelihood and severity of accidents and injuries. So, let’s make safety a top priority and ensure that our workplaces are safe and secure for all.

Cheers,

Welding Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Welding Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket