Call 1300 877 609 to find out about the latest offers available.

Roller, Compactor Safe Work Method Statement

SKU:SWMAU769

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Roller, Compactor Safe Work Method Statement

Introducing our Safe Work Method Statement (SWMS) Template for roller and compactor operations! Designed with the utmost care and attention to detail, this comprehensive and pre-filled template has been created to assist in creating a safer work environment for all workers involved in roller and compactor operations.

Here are some key features that make our SWMS template stand out from the rest:

  • Fully editable and customisable: Our SWMS template is available in Microsoft Word format, making it incredibly easy to edit and customise to suit your specific project requirements. You can easily add, delete or modify any section to make it a perfect fit for your unique needs.
  • Includes all necessary project details: Our SWMS template includes the scope of the project and all important details that are relevant to the project. This helps to ensure that everyone involved in the project has a clear understanding of what needs to be done and how to do it safely.
  • Checklist for high-risk machinery: Our template includes a checklist for all high-risk machinery that will be on-site. This helps to ensure that all necessary precautions are taken to mitigate any potential risks associated with the use of these machines.
  • Space for recording staff training: Our SWMS template includes space for recording any staff training that has taken place. This is an important feature that helps to ensure that all workers are trained and competent in operating the machinery safely.
  • Before and after risk ratings: Our template includes before and after risk ratings, making it easy to assess the effectiveness of the risk management measures that have been implemented.
  • Resources for legislative references: Our SWMS template includes resources for legislative references to help ensure that your project complies with all relevant legislation.
  • Includes all PPE required: Our template includes all necessary Personal Protective Equipment (PPE) required for the project. This helps to ensure that all workers are properly protected while carrying out their duties.
  • Risk assessment and risk assessment matrix: Our SWMS template includes a risk assessment and risk assessment matrix to help identify, assess and control any potential hazards associated with the project.
  • Checklist for ensuring all requirements are covered: Our template includes a checklist to ensure that all requirements have been covered when implementing the SWMS. This helps to ensure that no important details are overlooked.
  • Sign-off page for workers and responsible persons: Our SWMS template includes a sign-off page for all workers and responsible persons involved in the project. This helps to ensure that everyone is aware of their responsibilities and that they have agreed to abide by the SWMS.
  • Suitable for large contracts and tenders: Our SWMS template is suitable for large contracts and tenders, including tier 1 contractual work. This makes it a valuable tool for contractors and project managers alike.
  • Instantly delivered download: Our SWMS template is available as an instant download, making it easy to access and use right away.

Overall, our SWMS template is an easy-to-use, comprehensive and customisable tool that can help ensure a safer work environment for all workers involved in roller and compactor operations. We’re here to help make your workplace safer and more efficient, and we believe that our SWMS template can be a valuable asset in achieving this goal.

Here is some safety information regarding roller and compactor operations.

Hazards and Risks: The following hazards and risks are associated with roller/compactor operations:

  1. Crushing or striking injuries due to the heavy weight of the equipment and moving parts.
  2. Injuries from falls or slipping on uneven surfaces.
  3. Exposure to hazardous substances such as diesel exhaust fumes.
  4. Risk of collisions with other vehicles or equipment on site.
  5. Electrical hazards from overhead power lines.

Control Measures:

  1. Equipment Inspection and Maintenance: a. Inspect the roller/compactor before use to ensure it is in good working condition. b. Check all safety features, such as lights, brakes, seat belts, and warning devices. c. Ensure that all guards are in place and that all moving parts are properly lubricated. d. Do not use the equipment if there are any defects or if it is not functioning correctly. e. Regularly maintain the equipment according to the manufacturer’s recommendations.
  2. Site Preparation: a. Ensure that the work site is free from hazards such as loose debris, rocks, or other obstructions that could cause the equipment to overturn. b. Ensure that all workers in the area are aware of the roller/compactor operations and are kept at a safe distance. c. If necessary, erect barriers or use signs to prevent unauthorised access to the work area. d. Ensure that the ground is level and stable to prevent the equipment from tipping over or sinking.
  3. Personal Protective Equipment (PPE): a. All personnel involved in roller/compactor operations must wear appropriate PPE such as safety shoes, hard hats, high-visibility vests, and gloves. b. Operators must wear hearing protection to reduce exposure to noise from the equipment. c. Respiratory protection may be necessary if workers are exposed to diesel exhaust fumes.
  4. Safe Operating Procedures: a. Only trained and authorised personnel should operate the roller/compactor. b. Always wear seat belts while operating the equipment. c. Follow the manufacturer’s instructions for starting, operating, and shutting down the equipment. d. Never exceed the maximum speed or load capacity of the equipment. e. Avoid sudden starts or stops, which can cause the equipment to overturn. f. Keep hands, feet, and clothing away from moving parts. g. Do not operate the equipment in reverse unless it is necessary. h. Always use a spotter when backing up or manoeuvring the equipment in tight spaces. i. Always turn off the engine and set the parking brake before leaving the equipment.
  5. Emergency Procedures: a. All workers must be trained on emergency procedures such as what to do in case of an accident, fire, or electrical hazard. b. First aid supplies and fire extinguishers should be readily available on site. c. If the equipment overturns, shut off the engine and evacuate the area immediately. d. Contact emergency services and report any injuries or incidents immediately.

Gary’s Safety Tips

Hey there, my friends! Today I want to talk about a really important topic that affects a lot of people in the construction industry: roller and compactor operations.

First of all, let’s start by acknowledging that these machines are extremely powerful and potentially dangerous. They are used to compact soil, asphalt, and other materials, and they can weigh several tons. So, if you’re not careful, you could seriously injure yourself or someone else.

That being said, I don’t want to scare you away from using rollers and compactors altogether. They are incredibly useful machines that can save you a lot of time and effort when working on a construction project. But, like any piece of heavy machinery, they need to be used with caution and respect.

Here are some safety recommendations to keep in mind when operating a roller or compactor:

  1. Wear proper personal protective equipment (PPE): This is a no-brainer, but it’s worth repeating. Whenever you’re working with heavy machinery, you should always wear the appropriate PPE. This includes a hard hat, safety glasses, steel-toed boots, and high-visibility clothing.
  2. Inspect the machine before use: Before you start using the roller or compactor, take a few minutes to inspect it. Check the brakes, steering, lights, and tires. Look for any signs of damage or wear and tear. If you notice any issues, don’t use the machine until they’ve been fixed.
  3. Keep bystanders away: When operating a roller or compactor, make sure there are no bystanders in the immediate vicinity. Set up barriers or cones to keep people away from the work area. If you’re working on a busy construction site, make sure everyone is aware that the machine is in use.
  4. Use caution on slopes: When using a roller or compactor on a slope, be extra cautious. Always drive up and down the slope, not across it. If you need to move across the slope, do so slowly and carefully.
  5. Never exceed the machine’s capacity: Every roller and compactor has a weight capacity. Make sure you know what that capacity is and never exceed it. Overloading the machine can cause it to tip over or lose traction.
  6. Be aware of your surroundings: When operating a roller or compactor, always be aware of your surroundings. Look out for other workers, equipment, and obstacles. Be especially careful when working near utility lines or underground pipes.
  7. Use the machine’s safety features: Most rollers and compactors come equipped with safety features like backup alarms, seat belts, and emergency stop buttons. Make sure you know how to use these features and always use them when necessary.
  8. Follow proper operating procedures: Finally, make sure you’re following the manufacturer’s recommended operating procedures. This includes things like starting and stopping the machine, driving and turning, and operating the controls. If you’re unsure about anything, consult the machine’s manual or ask a supervisor for guidance.

In conclusion, rollers and compactors are incredibly useful machines, but they can also be dangerous if not used properly. By following these safety recommendations, you can help ensure that you and your coworkers stay safe on the job.

Thanks for tuning in, my friends! Stay safe out there and keep hustling!

Cheers,

Roller, Compactor Safe Work Method Statement

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket