Call 1300 877 609 to find out about the latest offers available.

Roll Former Safe Work Method Statement (SWMS)

SKU:SWMAU942

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Roll Former Safe Work Method Statement (SWMS)

Introducing our Safe Work Method Statement (SWMS) Template for working with a roll former, a helpful tool to ensure workplace safety and compliance with Australian regulations. Our SWMS template is comprehensive and pre-filled with many features that make it easy to use and customisable to fit your project’s specific needs.

Here are some of the key features of our SWMS template:

  • Pre-filled and Comprehensive: Our SWMS template is pre-filled with detailed information and step-by-step guidance on how to complete the document for your specific project. It covers all the necessary elements required by law to ensure a safe workplace.
  • Fully editable and customisable: Our SWMS template is in Microsoft Word format, which means it’s fully editable and customisable to your specific needs. You can easily update the template as your project progresses, making it a flexible tool that can adapt to your changing requirements.
  • Includes scope and project details: Our SWMS template includes a section for the scope of the project and project details. This ensures that all relevant details are captured and communicated to everyone involved in the project.
  • Checklist of high-risk machinery: Our SWMS template includes a checklist of high-risk machinery on site, which is a crucial element in ensuring workplace safety.
  • Space for recording staff training: Our SWMS template includes space to record staff training, ensuring that all workers on site have received the necessary training to operate machinery and perform their job safely.
  • Before and after risk ratings: Our SWMS template includes before and after risk ratings, allowing you to measure the effectiveness of your risk management strategies and adjust accordingly.
  • Legislative references: Our SWMS template includes resources for legislative references, ensuring that you have all the necessary information to comply with Australian regulations.
  • PPE requirements: Our SWMS template includes all the necessary personal protective equipment (PPE) required for the job, ensuring that workers are protected at all times.
  • Risk assessment and matrix: Our SWMS template includes a risk assessment and risk assessment matrix, which is a crucial step in identifying potential hazards and implementing measures to manage risks.
  • Checklist for all requirements: Our SWMS template includes a checklist to ensure all requirements have been covered when implementing the SWMS, ensuring that no essential elements are missed.
  • Sign-off page for workers and responsible persons: Our SWMS template includes a sign-off page for all workers and responsible persons, ensuring that everyone involved in the project has reviewed and agreed to the SWMS.
  • Easy to use and customise: Our SWMS template is designed to be user-friendly and easy to customise, making it accessible to all levels of experience and expertise.
  • Suitable for large contracts and tenders: Our SWMS template is suitable for large contracts and tenders, including tier 1 contractual work. This ensures that your workplace is compliant and safe, regardless of the size of the project.
  • Instant download: Our SWMS template is available for instant download, making it a quick and convenient solution to your workplace safety needs.

In conclusion, our Safe Work Method Statement Template for working with a roll former is a helpful tool to ensure workplace safety and compliance with Australian regulations. It is suitable for large contracts and tenders, making it an essential tool for all types of construction projects. With our SWMS template, you can have peace of mind knowing that you have taken all the necessary steps to keep your workplace safe and compliant.

Here is some safety information regarding working with a roll former.

Hazards and Risks:

  1. Crushing: The machine has moving parts that can crush fingers, hands, and limbs.
  2. Electrical hazards: The machine is powered by electricity and can cause electric shocks.
  3. Noise: The machine produces loud noise that can cause hearing damage.
  4. Manual handling: The machine components can be heavy and awkward to lift, leading to musculoskeletal injuries.
  5. Slips, trips, and falls: The machine’s surrounding area can become slippery, leading to slips, trips, and falls.

Control Measures:

  1. Personal Protective Equipment (PPE):
    • All personnel operating the machine must wear appropriate PPE, including safety glasses, hearing protection, and gloves.
    • Operators should wear steel-toed safety boots.
  2. Machine Guarding:
    • The machine must be guarded to prevent access to moving parts and protect personnel from being crushed.
    • The guard must be in place before the machine is operated.
  3. Electrical Safety:
    • The machine must be regularly inspected and maintained by a qualified electrician.
    • All electrical cables must be properly insulated and protected.
  4. Noise Control:
    • A noise level assessment must be conducted to determine if the noise level exceeds safe levels.
    • If the noise level is above safe levels, noise-reducing measures must be implemented, such as using earplugs or installing noise barriers.
  5. Manual Handling:
    • The machine components should be lifted using mechanical aids such as cranes or forklifts.
    • Operators should receive manual handling training to ensure they lift components correctly and safely.
  6. Housekeeping:
    • The surrounding area of the machine should be kept clean and tidy to prevent slips, trips, and falls.

Procedure:

  1. Before operating the machine, check that all safety guards are in place and all electrical cables are properly insulated.
  2. Wear appropriate PPE, including safety glasses, hearing protection, gloves, and steel-toed safety boots.
  3. Follow the manufacturer’s instructions for operating the machine.
  4. If the noise level is high, use earplugs or other hearing protection.
  5. If lifting machine components, use mechanical aids such as cranes or forklifts.
  6. Keep the surrounding area of the machine clean and tidy to prevent slips, trips, and falls.
  7. If any safety issues are identified, stop the machine and report the issue to the supervisor or maintenance personnel.

Emergency Procedures:

  1. In case of an electrical shock, turn off the power immediately and seek medical attention.
  2. In case of a crush injury, stop the machine immediately and seek medical attention.
  3. In case of a fire, activate the fire alarm and evacuate the area immediately.

Gary’s Safety Tips

Hey there, it’s Gary, and today we’re going to talk about the benefits of making Safe Work Method Statements (SWMS) available to employees. Now, I know what you’re thinking – “Gary, why do I need to bother with SWMS? It’s just a bunch of paperwork, right?” Wrong. Having SWMS readily available to your employees is crucial to ensuring a safe workplace, and here’s why.

First of all, let’s talk about what SWMS actually are. SWMS are documents that outline the hazards and risks associated with a particular job or task, as well as the steps that need to be taken to minimise or eliminate those hazards and risks. They are a legal requirement in many industries, including construction, mining, and manufacturing, and they are an essential part of any effective safety management system.

So, why should you bother with SWMS? Well, for starters, they can help to reduce the risk of workplace accidents and injuries. By identifying potential hazards and outlining the steps that need to be taken to mitigate those hazards, SWMS can help employees to work safely and avoid accidents. This not only helps to protect your employees, but it also helps to reduce the risk of expensive lawsuits and workers’ compensation claims.

In addition to reducing the risk of accidents, SWMS can also help to improve productivity and efficiency. When employees have a clear understanding of what is expected of them and what steps they need to take to complete a task safely, they are more likely to work quickly and efficiently. This means that projects are completed on time and within budget, which can help to boost your bottom line.

Another benefit of SWMS is that they can help to improve communication and collaboration between employees. By outlining the roles and responsibilities of each team member, SWMS can help to ensure that everyone is on the same page and working towards the same goal. This can help to reduce misunderstandings and conflicts, which can improve morale and job satisfaction.

Finally, SWMS can also help to improve your company’s reputation. By demonstrating a commitment to safety and taking steps to minimise risks and hazards, you can build trust with your employees and your customers. This can help to attract new business and retain existing customers, which can be a major competitive advantage in today’s marketplace.

So, now that you know the benefits of SWMS, how can you ensure that your employees have access to them? The easiest way is to make them readily available online or in a central location on your premises. This can be as simple as setting up a shared drive or cloud storage account where employees can access the relevant SWMS for their tasks.

It’s also important to ensure that your employees understand the importance of SWMS and are trained in how to use them effectively. This can involve providing training and resources on how to read and interpret SWMS, as well as conducting regular safety briefings and toolbox talks.

In conclusion, Safe Work Method Statements are not just a bunch of paperwork – they are a crucial part of any effective safety management system. By making SWMS readily available to your employees, you can reduce the risk of accidents and injuries, improve productivity and efficiency, enhance communication and collaboration, and build a positive reputation for your company. So, don’t wait – start making SWMS a priority in your workplace today!

Cheers,

Roll Former Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Roll Former Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket