Call 1300 877 609 to find out about the latest offers available.

WHS System Packages

Industry Specific and Customised Safety Management Systems

ISO 9001 Quality Packages

Quality Assurance Documentation System Packages

ISO 45001 Safety Packages

Industry Specific ISO 45001 Safety Management System Packages

NDIS & Aged Care Packages

NDIS and Aged Care Documentation Systems and Related Services

Unlock the latest package deals.

1300 877 609

Road Roller Safe Work Method Statement (SWMS)

SKU:

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Road Roller Safe Work Method Statement (SWMS)

Introducing our Road Roller Safe Work Method Statement (SWMS) – your go-to solution for ensuring a safe and efficient work environment for your team. Our SWMS is not a guarantee, but it is designed to provide you with a comprehensive and pre-filled document that covers all the necessary details to keep your team safe on the job.

Key Features:

  • Pre-filled and Comprehensive: Our SWMS is pre-filled with relevant information, making it comprehensive and easy to use. It provides clear guidance on the risks involved with using road rollers and how to mitigate them.
  • Fully editable and customisable in Microsoft Word format: Our SWMS is fully editable and customisable in Microsoft Word format, allowing you to easily tailor it to your specific needs.
  • Includes the scope of the project and the project details: Our SWMS includes the scope of the project and project details, ensuring that all relevant information is documented in one place.
  • Includes a checklist of any high-risk machinery on site: Our SWMS includes a checklist of any high-risk machinery on site, ensuring that your team is aware of potential hazards and how to avoid them.
  • Includes space for recording any staff training: Our SWMS includes space for recording any staff training, ensuring that your team is adequately trained before using road rollers.
  • Includes before and after risk ratings: Our SWMS includes before and after risk ratings, providing a clear understanding of the risks involved before and after the use of road rollers.
  • Includes resources for use of legislative references: Our SWMS includes resources for the use of legislative references, ensuring that you are aware of all the relevant regulations.
  • Includes all PPE required: Our SWMS includes all personal protective equipment (PPE) required, ensuring that your team is protected from potential hazards.
  • Includes risk assessment and risk assessment matrix: Our SWMS includes a risk assessment and risk assessment matrix, providing a clear understanding of the risks involved and how to manage them.
  • Includes a checklist to ensure all requirements have been covered when implementing the SWMS: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS, ensuring that all necessary steps have been taken to keep your team safe.
  • Includes sign-off page for all workers and responsible persons: Our SWMS includes a sign-off page for all workers and responsible persons, ensuring that everyone is aware of the risks involved and how to mitigate them.
  • Easy to use, easy to customise: Our SWMS is easy to use and easy to customise, ensuring that you can tailor it to your specific needs.
  • Suitable for large contracts and tenders, including tier 1 contractual work: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work, providing a comprehensive solution for all your road roller needs.
  • Instantly delivered download: Our SWMS is an instantly delivered download, providing you with immediate access to a comprehensive document that can be used right away.

At Bluesafe, we take pride in providing high-quality solutions to ensure the safety of your team. Our SWMS for using road rollers is a comprehensive and easy-to-use document that can be tailored to your specific needs. While we cannot guarantee its effectiveness, we are confident that it will provide a strong foundation for keeping your team safe on the job.

Here is some safety information related to working with road rollers.

Hazards: The hazards associated with operating a road roller include but are not limited to:

  1. Collision with other vehicles, equipment or pedestrians
  2. Rollover or tipping of the road roller
  3. Exposure to dust and noise
  4. Crush injuries from the roller
  5. Falls from the roller or working at heights

Precautions: To minimise the risks associated with operating a road roller, the following precautions must be taken:

  1. Only trained and competent operators are allowed to operate the road roller
  2. Ensure that the road roller is inspected and maintained regularly, and any faults or defects are reported immediately
  3. Wear appropriate personal protective equipment (PPE) such as high-visibility clothing, hard hat, safety glasses, and hearing protection
  4. Ensure that the site is clear of obstacles, debris, and pedestrians before commencing work
  5. Only operate the road roller on stable and level ground, and avoid operating on slopes or embankments
  6. Always use the seat belt and the rollover protection structure (ROPS) while operating the road roller
  7. Always keep the roller in good condition, and ensure that the vibration frequency and amplitude are set to the appropriate level for the job
  8. When reversing, use the reverse alarm, and ensure that a spotter is present to guide the operator
  9. When refuelling, shut off the engine, and ensure that there are no sources of ignition nearby
  10. Ensure that the road roller is properly immobilised when parked or left unattended

Emergency Procedures: In case of an emergency, the following procedures must be followed:

  1. If there is an injury, seek medical attention immediately
  2. If the road roller tips over, remain in the cab, and do not attempt to jump out
  3. Turn off the engine, and engage the emergency brake
  4. Contact the supervisor or the emergency services if necessary

Gary’s Safety Tips

Hello, everyone! Today, I want to talk about something that’s been on my mind lately: the dangers and safety recommendations when it comes to working with road rollers.

Now, I know this might not be the most exciting topic out there, but it’s one that’s incredibly important. Road rollers are heavy-duty machines that are designed to flatten and compact surfaces like asphalt and concrete. They’re essential for many construction projects, but they can also be extremely dangerous if not handled properly.

First and foremost, it’s important to understand the sheer size and weight of these machines. Road rollers can weigh anywhere from a few thousand pounds to over 100,000 pounds. That’s a lot of weight to be moving around, and it can be incredibly dangerous if it’s not done with care.

One of the biggest dangers when it comes to road rollers is the risk of rollovers. These machines are top-heavy, which means they’re more likely to tip over if they’re not operated correctly. This is why it’s so important to make sure that the operator is properly trained and that they’re following all safety guidelines.

Another danger when it comes to road rollers is the risk of entanglement. There are a lot of moving parts on these machines, and it’s easy for loose clothing or hair to get caught in them. This can lead to serious injuries or even death, so it’s important to make sure that everyone on the job site is dressed appropriately and that they’re keeping a safe distance from the machine.

In addition to these dangers, there are also a number of safety recommendations that should be followed when working with road rollers. Here are a few:

  1. Proper training: Anyone who operates a road roller should be properly trained and certified. This includes understanding how to safely operate the machine, as well as knowing what to do in case of an emergency.
  2. Personal protective equipment: Everyone on the job site should be wearing personal protective equipment, including hard hats, safety glasses, and high-visibility clothing. This will help to protect them from any flying debris or other hazards.
  3. Inspections: Before using a road roller, it’s important to inspect it thoroughly to make sure that everything is in working order. This includes checking the brakes, steering, and other components.
  4. Communication: Communication is key when it comes to working with road rollers. Everyone on the job site should be aware of where the machine is and what it’s doing at all times. There should also be clear signals in place for the operator to follow.
  5. Traffic control: If the job site is near a public road or other area with vehicle traffic, it’s important to have proper traffic control measures in place. This may include flaggers, barriers, or other safety measures to ensure that everyone stays safe.

Overall, working with road rollers can be incredibly dangerous if proper safety measures are not taken. It’s important to understand the risks and to follow all safety recommendations in order to keep everyone on the job site safe. So if you’re ever working with a road roller, make sure that you’re taking the necessary precautions and that you’re always putting safety first.

Regards,

Road Roller Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Road Roller Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket