Call 1300 877 609 to find out about the latest offers available.

Replace Boiling Water Unit Safe Work Method Statement (SWMS)

SKU:SWMAU9041

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Replace Boiling Water Unit Safe Work Method Statement (SWMS)

Introducing the Safe Work Method Statement Template for replacing a boiling water unit – a helpful tool designed to assist with project planning needs. This template is designed to ensure that all necessary information is included, while allowing for easy editing and customisation to suit your specific project requirements.

Here are some key features of the template:

  • Pre-filled and Comprehensive: The SWMS template is pre-filled with all the relevant details for replacing a boiling water unit, ensuring that all necessary information is included and saving you time.
  • Fully editable and customisable in Microsoft Word format for easy editing: The template comes in a Microsoft Word format, making it easy to edit and customise to suit your specific project requirements.
  • Includes the scope of the project and the project details: The template includes the project scope, details, and specific requirements, allowing you to clearly define the project goals and objectives.
  • Includes checklist of any high-risk machinery on site: The SWMS template includes a checklist of any high-risk machinery that may be present on the site, ensuring that you are aware of any potential hazards and can take necessary precautions.
  • Includes space for recording any staff training: You can use the template to record any staff training that is required for the project, ensuring that everyone is up-to-date on the necessary safety procedures.
  • Includes before and after risk ratings: The template includes before and after risk ratings, which allows you to measure the effectiveness of the SWMS and identify any areas that need improvement.
  • Includes resources for use of legislative references: The template includes resources for the use of legislative references, ensuring that your SWMS is compliant with all relevant legislation.
  • Includes all PPE required: The SWMS template includes a list of all personal protective equipment (PPE) required for the project, ensuring that you have everything you need to keep your team safe.
  • Includes risk assessment and risk assessment matrix: The template includes a risk assessment and risk assessment matrix, allowing you to identify and manage any potential hazards.
  • Includes a checklist to ensure all requirements have been covered when implementing the SWMS: The template includes a checklist to ensure that all the necessary requirements have been covered when implementing the SWMS.
  • Includes sign-off page for all workers and responsible persons: The template includes a sign-off page for all workers and responsible persons, ensuring that everyone has acknowledged and agreed to the SWMS.
  • Easy to use, easy to customise: The SWMS template is designed to be user-friendly and easy to customise, ensuring that you can create a personalised SWMS that meets all your project requirements.
  • Suitable for large contracts and tenders, including tier 1 contractual work: The SWMS template is suitable for large contracts and tenders, including tier 1 contractual work, ensuring that you have everything you need to bid for and win the biggest projects.
  • Instantly delivered download English: The template is available for instant download in English, allowing you to get started on your project planning right away.

Overall, the Safe Work Method Statement Template for replacing a boiling water unit is a helpful resource for anyone who needs to plan and implement a safe and compliant project. With its pre-filled and comprehensive design, fully editable and customisable format, and inclusion of all necessary project details, this SWMS template is sure to assist you in creating a successful and safe project plan.

Here is some safety information regarding replacing a boiling water unit.

  1. Hazard Identification:
  • Burns and scalds from hot water or steam.
  • Slips, trips, and falls due to wet floors.
  • Electrical hazards from electrical appliances and equipment.
  1. Risk Assessment:
  • Consider the temperature of the hot liquid and the container it is being held in.
  • Assess the distance and path of travel for the hot liquid.
  • Identify the location of electrical appliances and equipment.
  • Evaluate the condition of the work area, including any obstacles or potential hazards.
  1. Control Measures:
  • Wear appropriate personal protective equipment (PPE) such as heat-resistant gloves, aprons, and closed-toe shoes.
  • Ensure the container for the hot liquid is stable and secure.
  • Use a ladle or other appropriate tool to transfer the hot liquid.
  • Keep the work area clean and dry, and mark wet floors with appropriate signage.
  • Ensure electrical appliances and equipment are in good working condition and not in contact with water.
  1. Safe Work Procedures:
  • Ensure all workers are trained on the hazards and risks associated with handling hot liquids.
  • Use a thermometer to check the temperature of the hot liquid before handling it.
  • Use a ladle or other appropriate tool to transfer the hot liquid.
  • Ensure the container for the hot liquid is stable and secure before pouring.
  • Pour the hot liquid slowly and carefully, and avoid splashing.
  • Clean up any spills immediately and dry the area thoroughly.
  • Turn off and unplug any electrical appliances and equipment that are not in use.
  1. Emergency Procedures:
  • In the event of a spill, turn off any electrical equipment and evacuate the area.
  • Treat any burns or scalds with cold water immediately and seek medical attention if necessary.
  • Contact emergency services if the spill is large or there is a risk of fire.

Gary’s Safety Tips

Hey everyone, it’s great to be here today to talk about a really important topic that affects us all – replacing a boiling water unit. Now, I know this might not seem like the sexiest subject in the world, but it’s something that we all need to be aware of, because if we don’t do it properly, it can be really dangerous.

First of all, let’s talk about some of the dangers that can arise when you’re replacing a boiling water unit. The first and most obvious danger is scalding. Boiling water is extremely hot, and if you’re not careful, you can easily get burned. This can happen when you’re removing the old unit, installing the new one, or even just turning the water on after the installation is complete. So, it’s really important to take precautions to avoid scalding.

Another danger that you need to be aware of is the risk of electrical shock. Boiling water units are typically powered by electricity, so if you’re not careful when you’re installing or removing the unit, you could accidentally come into contact with live wires. This can be extremely dangerous, and can even be fatal in some cases.

Finally, it’s important to be aware of the risk of gas leaks if you have a gas-powered boiling water unit. If you’re not careful when you’re installing the new unit, you could accidentally damage the gas line, which could lead to a gas leak. Gas leaks can be extremely dangerous, as they can lead to fires or explosions.

So, now that we’ve talked about some of the dangers that can arise when you’re replacing a boiling water unit, let’s talk about some safety recommendations to help you avoid these risks.

First of all, it’s really important to turn off the power or gas supply to the old unit before you start removing it. This will help to prevent electrical shock or gas leaks. Make sure that you know where the power or gas supply is located before you start, and take the time to turn it off properly.

Once you’ve turned off the power or gas supply, you can start removing the old unit. Make sure that you wear gloves and other protective gear, like safety glasses, to protect yourself from scalding and other hazards. Use caution when removing the old unit, and be sure to follow the manufacturer’s instructions carefully.

When it comes to installing the new unit, it’s really important to read the instructions carefully and follow them closely. Make sure that you’re installing the unit in the right location, and that it’s properly secured. If you’re not sure about something, don’t hesitate to consult a professional. It’s better to be safe than sorry!

Finally, when you’re turning the power or gas supply back on, make sure that you do it slowly and carefully. Take the time to check for any leaks or other problems before you turn everything back on fully. If you do detect any issues, don’t hesitate to call a professional for help.

So, there you have it – some safety recommendations to help you avoid the dangers of replacing a boiling water unit. Remember, this is an important task that needs to be done properly, so don’t rush through it or try to take shortcuts. If you follow these recommendations and take your time, you can replace your boiling water unit safely and with confidence.

Remember, safety first!

Cheers,

Replace Boiling Water Unit Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Replace Boiling Water Unit Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket