- Electric shock from electrical connections
- Burns from hot water
- Slip, trip, and fall hazards from working in confined spaces
- Inhaling harmful chemicals from cleaning agents
- Eye injuries from splashes or sprays of water
- Back, muscle, and joint strains from awkward working positions
Risk Controls:
- Conduct a risk assessment before commencing any work and identify potential hazards. Develop a plan to mitigate these hazards.
- Use appropriate personal protective equipment (PPE) such as gloves, safety glasses, and respiratory protection where required.
- Ensure electrical power supply to the TMV is switched off before commencing work.
- Drain the hot water supply system before starting work to reduce the risk of burns.
- Use non-slip footwear and work in well-lit areas to avoid trip and fall hazards.
- Ensure adequate ventilation is available when using cleaning agents to avoid inhaling harmful chemicals.
- Install a temporary barrier around the work area to prevent unauthorised entry and protect other workers from splashes or sprays of water.
- Use a suitable lifting device to reduce the risk of back, muscle, and joint strains when lifting heavy equipment.
Procedure:
- Conduct a pre-work inspection of the TMV to assess the damage and identify the cause of the problem.
- Follow the manufacturer’s instructions to disconnect the TMV from the hot and cold water supply.
- Disassemble the TMV and inspect all parts for damage or wear.
- Replace any damaged or worn parts with genuine manufacturer’s parts.
- Reassemble the TMV in accordance with the manufacturer’s instructions.
- Reconnect the TMV to the hot and cold water supply.
- Turn on the water supply and test the TMV to ensure it is working correctly.
- Conduct a post-work inspection to ensure the TMV is installed correctly and functioning as intended.
- Dispose of any waste materials in accordance with local regulations.
Emergency Procedures: In case of an emergency, follow the emergency procedures outlined in the company’s safety manual.
Gary’s Safety Tips 
G’day everyone, it’s Gary here to talk about a topic that may not be the most exciting, but is definitely important for businesses and organisations to consider: implementing reporting systems when injuries occur.
Now I know what you might be thinking – “Gary, injuries are no fun, why would we want to talk about that?” And believe me, I get it. Nobody wants to see their employees or colleagues hurt on the job. But the reality is that accidents can happen, and it’s important for us to be prepared for them.
So, let’s dive in. First off, why is it important to have a reporting system in place? Well, for starters, it helps to ensure that injuries are promptly and accurately recorded. This is not only important from a legal perspective, but it also helps businesses to identify potential hazards and take steps to prevent similar incidents from happening in the future.
But beyond that, having a reporting system in place can also help to create a culture of safety within your organisation. When employees know that their injuries will be taken seriously and that steps will be taken to prevent future incidents, it can help to boost morale and create a sense of trust and respect between management and staff.
So, how do you go about implementing a reporting system? Well, the first step is to identify the key stakeholders who will be involved in the process. This may include HR, legal, and safety personnel, as well as managers and supervisors who will be responsible for ensuring that incidents are promptly reported and investigated.
Once you’ve identified your stakeholders, the next step is to develop a clear and concise reporting process that outlines the steps that need to be taken when an injury occurs. This may include things like notifying management, completing incident reports, and seeking medical attention as necessary.
It’s also important to ensure that employees are properly trained on the reporting process and that they understand the importance of reporting incidents promptly and accurately. This may include conducting regular training sessions and providing resources such as posters or handouts that explain the reporting process in detail.
Another important aspect of implementing a reporting system is ensuring that incidents are investigated thoroughly and that corrective actions are taken to prevent similar incidents from happening in the future. This may involve things like conducting safety audits, identifying hazards, and implementing new safety procedures or equipment as necessary.
Finally, it’s important to regularly review and evaluate your reporting system to ensure that it remains effective and relevant over time. This may involve soliciting feedback from employees, reviewing incident reports to identify trends or areas for improvement, and making updates or changes to the reporting process as necessary.
So, there you have it – some tips on implementing a reporting system when injuries occur. Remember, accidents can happen to anyone, but with the right systems and processes in place, we can help to minimise their impact and ensure the safety and well-being of our employees.
Stay safe out there!
Cheers,
