Call 1300 877 609 to find out about the latest offers available.

Power Steering Flusher Safe Work Method Statement

SKU:SWMAU768

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Power Steering Flusher Safe Work Method Statement

Introducing the Safe Work Method Statement Template for using a power steering flusher, a helpful tool for ensuring the safety and wellbeing of your team on site. This pre-filled and comprehensive template is designed to make the process of creating a safe work method statement a breeze, so you can focus on getting the job done right.

Here are some key features of our Safe Work Method Statement Template:

Pre-filled and Comprehensive: We’ve done the hard work for you by pre-filling the template with all the essential information needed to ensure a safe work environment. The comprehensive layout makes it easy to see everything you need to know in one place.

Fully Editable and Customisable: Our template is designed to be fully editable and customisable in Microsoft Word format, allowing you to easily modify it to suit your specific needs.

Scope and Project Details: The template includes sections to outline the scope of the project, along with all the important project details to ensure that everything is accounted for.

High Risk Machinery Checklist: We’ve included a checklist of any high-risk machinery on site to ensure that proper precautions are taken when operating them.

Staff Training Record: There is space to record staff training to ensure that everyone is up to speed on the necessary safety protocols.

Before and After Risk Ratings: We’ve included a section for before and after risk ratings, so you can easily see the progress made in mitigating risks throughout the project.

Legislative References: The template includes resources for use of legislative references, so you can be sure that everything is up-to-date and compliant.

PPE Requirements: We’ve included all necessary Personal Protective Equipment (PPE) required for the project, so you can be sure that everyone is protected.

Risk Assessment and Risk Assessment Matrix: The template includes a risk assessment and risk assessment matrix to help you identify potential hazards and assess the level of risk associated with them.

Checklist for Implementation: There is a checklist to ensure that all requirements have been covered when implementing the SWMS, so you can be confident that everything has been addressed.

Sign-Off Page: The template includes a sign-off page for all workers and responsible persons, ensuring that everyone is aware of and has agreed to the safety procedures outlined.

Easy to Use and Customise: Our template is designed to be user-friendly and easy to customise, so you can quickly and easily create a safe work method statement that meets your specific needs.

Suitable for Large Contracts and Tenders: Our template is perfect for large contracts and tenders, including tier 1 contractual work, ensuring that you have everything you need to comply with safety regulations and win those big contracts.

Instant Download: Our Safe Work Method Statement Template is available for instant download, so you can get started right away.

In summary, our Safe Work Method Statement Template for Power Steering Flusher is a helpful tool for ensuring safety on your worksite. With its comprehensive layout, pre-filled information, and user-friendly design, this template is perfect for anyone who needs to create a safe work method statement quickly and easily.

Here is some safety information regarding working with a power steering flusher:

Hazards: The following hazards may arise during power steering flusher operations:

  • Chemical exposure to flushing fluids
  • Burns from hot fluids and components
  • Slips, trips, and falls due to wet surfaces
  • Crush injuries from moving equipment
  • Electrocution from electrical equipment

Risk assessment: Before starting any power steering flusher operations, a risk assessment should be conducted to identify and assess any hazards that may be encountered during the process. Appropriate control measures should be identified and implemented to eliminate or mitigate the risks.

Control measures: The following control measures should be implemented to ensure the safe conduct of power steering flusher operations:

  • Workers should wear appropriate personal protective equipment (PPE) such as eye protection, gloves, and aprons to prevent chemical exposure and burns.
  • The work area should be well-ventilated to minimise the risk of chemical exposure and to dissipate any fumes.
  • All equipment should be properly maintained and regularly inspected to prevent any malfunction or damage that may cause injury.
  • Workers should be trained in the safe use of the equipment and the handling of flushing fluids.
  • All spills should be immediately cleaned up to prevent slips, trips, and falls.
  • Electrical equipment should be properly grounded and regularly inspected to prevent electrocution.
  • Workers should be trained in the proper lifting and handling of equipment to prevent crush injuries.

Procedures: The following procedures should be followed when performing power steering flusher operations:

  1. Conduct a risk assessment to identify and assess any hazards that may arise during the process.
  2. Ensure all equipment is properly maintained and inspected.
  3. Wear appropriate PPE.
  4. Ensure the work area is well-ventilated.
  5. Position the vehicle on a level surface and secure it using appropriate supports.
  6. Drain the power steering fluid from the system.
  7. Connect the power steering flusher to the system and follow the manufacturer’s instructions for operation.
  8. Dispose of the used flushing fluid in accordance with local regulations.
  9. Refill the power steering system with new fluid.
  10. Conduct a final inspection to ensure all equipment is properly secured and the work area is clean and free of hazards.

Gary’s Safety Tips

G’day mate, it’s Gary here and today we’re gonna talk about something that’s incredibly important in the world of work – safe work method statements. As someone who’s been in the game for a while now, I know that safety should always be your number one priority. That’s why I wanna take a few minutes to talk about the key factors to consider when preparing a safe work method statement.

First things first, let’s define what a safe work method statement actually is. In simple terms, it’s a document that outlines the steps you need to take in order to carry out a task safely. It’s a way of identifying potential hazards and risks, and then putting measures in place to prevent them from happening.

So, what are the key factors you need to consider when preparing a safe work method statement? Well, here are a few things to keep in mind:

  1. Identify the task at hand

The first step in preparing a safe work method statement is to identify the task you’ll be carrying out. You need to have a clear understanding of what the task involves, what equipment you’ll be using, and what potential hazards and risks may be present.

  1. Assess the risks

Once you’ve identified the task, it’s time to assess the risks. You need to consider things like the environment you’ll be working in, the equipment you’ll be using, and the skills and experience of the people involved. This will help you to identify potential hazards and risks, and then put measures in place to prevent them from happening.

  1. Consult with others

Preparing a safe work method statement is not a one-person job. You need to consult with others who may be involved in the task, such as your team, your supervisor, or even external experts. By getting input from others, you can identify potential hazards and risks that you may have missed, and then put measures in place to prevent them from happening.

  1. Develop control measures

Based on the risks you’ve identified, you need to develop control measures to prevent accidents and injuries from occurring. This might include things like wearing protective equipment, implementing safe work procedures, or using specific tools or equipment to minimise risks.

  1. Implement and communicate

Once you’ve developed your safe work method statement, it’s time to implement it and communicate it to everyone involved. This means making sure that everyone understands the risks and control measures, and knows how to carry out the task safely.

  1. Review and update

Finally, it’s important to review and update your safe work method statement regularly. As you gain experience, you may identify new risks or control measures that need to be added, or you may need to modify existing measures to make them more effective. By reviewing and updating your safe work method statement, you can ensure that you’re always working as safely as possible.

So there you have it, folks – the key factors to consider when preparing a safe work method statement. Remember, safety should always be your number one priority, and by following these steps, you can ensure that you’re doing everything you can to prevent accidents and injuries from occurring.

Now, I know that some of you might be thinking, “But Gary, this all sounds like a lot of work. Can’t we just skip it and get on with the task at hand?” Well, my friend, let me tell you that the consequences of not preparing a safe work method statement can be far more serious than the time it takes to prepare one. Accidents and injuries can result in lost time, lost productivity, and even lost lives. So, take the time to prepare a safe work method statement, and make safety your top priority. Trust me, it’s worth it.

Cheers,

Power Steering Flusher Safe Work Method Statement

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket