Call 1300 877 609 to find out about the latest offers available.

Power Drill Safe Work Method Statement (SWMS)

SKU:SWMAU2411

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Power Drill Safe Work Method Statement (SWMS)

Introducing our Safe Work Method Statement Template for Power Drill – a helpful tool for any construction site or project that involves the use of a power drill. This comprehensive and pre-filled template is designed to simplify the process of creating a SWMS for your team, saving you time and effort in the process.

Key features of our Safe Work Method Statement Template for Power Drill include:

  • Pre-filled and Comprehensive: Our template comes pre-filled with all the information you need to get started. We’ve included a comprehensive list of potential hazards, risk assessments, and PPE requirements to ensure that you don’t miss anything important.
  • Fully Editable and Customisable: The template is provided in Microsoft Word format, allowing you to easily edit and customise it to your specific needs. Whether you need to add or remove items, change the wording or layout, or add your company logo, you can do it all with ease.
  • Project Scope and Details: We’ve included space for you to outline the scope of your project and provide project details, ensuring that everyone is on the same page when it comes to the work being done.
  • High Risk Machinery Checklist: Our template includes a checklist of any high risk machinery that may be on site, helping you identify potential hazards and manage risks accordingly.
  • Staff Training Record: We’ve provided space for you to record any staff training that has been conducted, ensuring that your team is fully prepared and qualified for the work they will be doing.
  • Before and After Risk Ratings: Our template includes a space to record before and after risk ratings, allowing you to track progress and identify areas that may need further attention.
  • Legislative References: We’ve included resources for use of legislative references, ensuring that you are compliant with all relevant laws and regulations.
  • PPE Requirements: Our template includes all PPE requirements, ensuring that your team is properly protected at all times.
  • Risk Assessment and Risk Assessment Matrix: Our template includes a risk assessment and risk assessment matrix, helping you identify and manage potential hazards.
  • SWMS Implementation Checklist: Our template includes a checklist to ensure that all requirements have been covered when implementing the SWMS, making sure that you don’t miss anything important.
  • Sign Off Page: Our template includes a sign off page for all workers and responsible persons, ensuring that everyone is aware of their responsibilities and has agreed to follow the SWMS.
  • Easy to Use and Customise: Our template is designed to be easy to use and customise, making it easy to create a comprehensive SWMS for your team.
  • Suitable for Large Contracts and Tenders: Our template is suitable for large contracts and tenders, including tier 1 contractual work, ensuring that you are fully prepared for any project.
  • Instant Download: Our template is available for instant download, allowing you to get started right away.

At our company, we understand the importance of safety on the job site. That’s why we’ve created this Safe Work Method Statement Template for Power Drill – to help you create a comprehensive SWMS that will keep your team safe and compliant with all relevant regulations. We hope that this template will make your job easier and more efficient, and we’re always here to help if you have any questions or concerns.

Here is some safety information regarding Power Drill:

Hazards:

  1. Electrical hazards due to the use of power tools.
  2. Risk of physical injury from the drill bit.
  3. Risk of inhaling dust and debris.
  4. Risk of tripping and falling over cords or other obstacles.

Risk Control Measures:

  1. Ensure that all power drills and cords are checked before use, and any defects are reported and repaired before use.
  2. Use only properly grounded and insulated power tools and cords.
  3. Always wear appropriate personal protective equipment (PPE), including eye protection, earplugs, and a dust mask.
  4. Keep the work area clean and free of debris to reduce the risk of tripping or falling.
  5. Avoid wearing loose clothing, jewellery, or long hair that could get caught in the drill.
  6. Use a drill stand or vice to hold the material being drilled to prevent it from moving.
  7. Use the correct drill bit for the material being drilled, and ensure that it is securely fastened to the drill.
  8. Avoid placing your fingers near the drill bit while it is in use.
  9. Do not attempt to remove a jammed or stuck drill bit without turning off the power and unplugging the drill.
  10. Ensure that the drill is turned off and unplugged when not in use, and store it in a safe and secure location.

Emergency Procedures:

  1. In case of an electric shock, turn off the power source immediately and call for medical assistance.
  2. In case of a physical injury, seek medical attention immediately and report the incident to your supervisor.
  3. In case of a fire, evacuate the area immediately and call the fire department.
  4. In case of a chemical spill, follow the appropriate procedures for cleanup and containment.

Gary’s Safety Tips

Hey, everyone! Today we’re going to talk about something that might seem simple at first glance but can actually be pretty dangerous if not handled properly: power drills. That’s right, Gary here to give you some safety recommendations on working with this powerful tool.

First of all, let’s talk about some of the dangers of using a power drill. One of the most obvious risks is the possibility of getting hurt by the drill bit. Whether you’re drilling into wood, metal, or any other material, if the bit slips or breaks, it can cause serious injury. That’s why it’s important to always wear protective gear such as safety glasses and gloves.

Another risk is the possibility of electrocution. Power drills are electric tools, which means they carry the risk of electric shock if not used properly. Make sure to always use a grounded outlet, and never use a power drill with wet hands or in wet conditions.

Now that we’ve covered some of the potential dangers, let’s talk about some safety recommendations to keep you and those around you safe while working with a power drill.

First and foremost, always read the manual before using a power drill. It might seem boring, but the manual contains important information about how to properly use the tool, as well as any potential hazards that come with it. Take the time to read it and make sure you understand everything before you start drilling.

Another important safety tip is to always use the right drill bit for the job. Using the wrong bit can not only damage your material but also put you at risk of injury. Make sure you have the right bit for the material you’re drilling into, and if you’re not sure, ask someone with more experience or consult the manual.

When it comes to drilling, always start with a pilot hole. A pilot hole is a smaller hole drilled before the main hole to guide the drill bit and prevent it from slipping. This not only makes the drilling process easier but also reduces the risk of injury.

One mistake many people make when using a power drill is applying too much pressure. Let the drill do the work for you; applying too much pressure can cause the bit to break or cause the drill to slip, potentially leading to injury. Keep a firm grip on the drill, but don’t push too hard.

It’s also important to secure the material you’re drilling into. If the material moves or slips while you’re drilling, it can cause the bit to break or cause injury. Use clamps or other methods to keep the material in place and prevent any accidents from happening.

Finally, always unplug the power drill when you’re finished using it. Leaving it plugged in can be dangerous, especially if someone else accidentally turns it on. Make sure to store it in a safe place where it won’t be knocked over or bumped.

So there you have it, folks, some safety recommendations to keep in mind when working with a power drill. Remember, power drills can be incredibly useful tools, but they also carry some risk if not handled properly. Take the time to read the manual, use the right bit for the job, and always prioritise safety.

Cheers,

Power Drill Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Power Drill Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket