Call 1300 877 609 to find out about the latest offers available.

Pool Pump And Filter Safe Work Method Statement (SWMS)

SKU:SWMAU886

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Pool Pump And Filter Safe Work Method Statement (SWMS)

Introducing our Safe Work Method Statement Template for Pool Pump and Filter – a helpful tool for businesses in the pool maintenance industry! This comprehensive and pre-filled template is designed to help you identify, assess and control hazards associated with pool pump and filter installations, repairs and maintenance.

Here are some key features that make our SWMS Template stand out from the crowd:

  • Pre-filled and Comprehensive: Our template comes pre-filled with all the important sections required for a thorough SWMS. This means you won’t have to waste time filling in the blanks and can focus on customising the template to your specific job site requirements.
  • Fully Editable and Customisable: Our SWMS Template is provided in Microsoft Word format, making it easy to edit and customise to suit your business needs. You can add or remove sections, change wording, and include your company logo for a professional touch.
  • Includes Scope of Project and Project Details: Our template includes a section for outlining the scope of the project and project details. This ensures all workers are aware of the specific task requirements and helps to prevent confusion or misunderstandings.
  • Includes Checklist of High-Risk Machinery: We understand that working with high-risk machinery is a serious matter. That’s why our template includes a checklist of any high-risk machinery on site, to help ensure all necessary precautions are taken to prevent accidents and injuries.
  • Includes Space for Recording Staff Training: Our template includes a section for recording any staff training completed before the job commences. This helps to ensure that all workers are properly trained and competent to perform the required tasks safely.
  • Includes Before and After Risk Ratings: Our SWMS Template includes before and after risk ratings to help assess the effectiveness of control measures implemented during the job. This allows for ongoing improvement of safety practices and procedures.
  • Includes Resources for Legislative References: We understand that keeping up-to-date with legislative requirements can be a challenge. That’s why our template includes resources for use of legislative references, making it easier to ensure compliance with relevant laws and regulations.
  • Includes All PPE Required: Our template includes a comprehensive list of all Personal Protective Equipment (PPE) required for the job. This helps to ensure that all workers have the necessary gear to perform their tasks safely.
  • Includes Risk Assessment and Risk Assessment Matrix: Our SWMS Template includes a risk assessment section and a risk assessment matrix. This helps to identify potential hazards and assess the level of risk associated with each task.
  • Includes Checklist to Ensure all Requirements are Covered: Our template includes a checklist to ensure all requirements have been covered when implementing the SWMS. This helps to ensure that no important steps are missed during the planning and execution of the job.
  • Includes Sign Off Page for Workers and Responsible Persons: Our template includes a sign off page for all workers and responsible persons. This helps to ensure that everyone involved in the job is aware of the safety measures in place and acknowledges their commitment to following them.
  • Easy to Use, Easy to Customise: Our SWMS Template is designed to be easy to use and easy to customise. This means you can quickly and easily create a professional and comprehensive SWMS, saving you time and reducing the risk of accidents and injuries.
  • Suitable for Large Contracts and Tenders: Our template is suitable for large contracts and tenders, including tier 1 contractual work. This means you can confidently bid for big jobs knowing that you have a thorough and professional SWMS in place.
  • Instantly Delivered Download: Our SWMS Template is available for instant download, so you can start using it straight away. This means you can quickly and easily create a professional and comprehensive SWMS, saving you time and reducing the risk of accidents and injuries.

At the end of the day, the safety of your workers and the success of your business are our top priorities.

Here is some safety information regarding Pool Pump And Filter:

Hazards:

  1. Electrical hazards – from power cords and switches.
  2. Chemical hazards – from chemicals used in pool water treatment.
  3. Noise hazards – from the operation of the pump and filter.
  4. Slip, trip and fall hazards – from wet surfaces and working at heights.
  5. Pinch and crush hazards – from the moving parts of the pump and filter.

Risk Assessment:

  1. Assess the location and access to the pool pump and filter.
  2. Identify all potential hazards associated with the operation and maintenance of the pool pump and filter.
  3. Determine the likelihood and severity of the identified hazards.
  4. Implement appropriate controls to eliminate or minimise the risks.

Controls:

  1. Ensure all workers and contractors are trained and competent to operate and maintain the pool pump and filter.
  2. Always turn off the power supply to the pump and filter before carrying out any maintenance or cleaning.
  3. Wear appropriate personal protective equipment (PPE) including safety glasses, gloves, and hearing protection when working with chemicals or carrying out maintenance.
  4. Keep the pool pump and filter area clean and dry to prevent slip, trip and fall hazards.
  5. Ensure the pool pump and filter area is well ventilated to minimise exposure to fumes from pool chemicals.
  6. Use lockout/tagout procedures to prevent accidental start-up of the pump and filter during maintenance.
  7. Use guards and barriers to prevent access to moving parts of the pump and filter.
  8. Always follow the manufacturer’s instructions and recommendations for the safe operation and maintenance of the pool pump and filter.

Procedure:

  1. Before starting work, assess the location and access to the pool pump and filter and identify any potential hazards.
  2. Turn off the power supply to the pump and filter.
  3. Wear appropriate PPE including safety glasses, gloves, and hearing protection when working with chemicals or carrying out maintenance.
  4. Remove any debris or obstructions from the pool pump and filter.
  5. Follow the manufacturer’s instructions for maintaining the pump and filter.
  6. Replace any worn or damaged parts as required.
  7. Use lockout/tagout procedures to prevent accidental start-up of the pump and filter during maintenance.
  8. Turn on the power supply to the pump and filter and check for proper operation.
  9. Conduct regular inspections and maintenance of the pool pump and filter to ensure it is operating safely and efficiently.
  10. Keep a record of all maintenance and repairs conducted on the pool pump and filter.

Emergency Procedures:

  1. In case of electrical shock, turn off the power supply to the pump and filter immediately and seek medical attention.
  2. In case of chemical exposure, flush the affected area with water and seek medical attention.
  3. In case of injury from moving parts of the pump and filter, seek medical attention immediately.
  4. In case of fire, evacuate the area and call the fire department.

Gary’s Safety Tips

Hey there, friends! Today, I want to talk about something very important: the dangers and safety recommendations when working with a pool pump and filter.

First things first, let me tell you that a pool pump and filter can be extremely dangerous if not handled correctly. These machines are powerful and can cause serious injury or even death if not used properly. That being said, it’s important to take the necessary precautions to ensure your safety.

One of the most important safety recommendations is to always turn off the power to the pool pump and filter before doing any maintenance or repair work. This may seem like common sense, but it’s important to emphasise because many accidents happen when people forget to turn off the power. It’s also a good idea to lock the power switch or breaker box to prevent someone from accidentally turning it back on while you’re working.

Another important safety recommendation is to wear appropriate safety gear, including eye protection and gloves. The pool pump and filter can generate debris and sharp edges, so it’s important to protect yourself from flying objects and cuts.

It’s also important to use the right tools when working with the pool pump and filter. Using the wrong tool or a tool that’s in poor condition can cause damage to the equipment or result in injury. Always use the recommended tools and inspect them for damage before using them.

When working with the pool pump and filter, it’s important to be aware of your surroundings. Make sure the area around the equipment is clear of debris and other hazards. If possible, work with a partner who can assist you and keep an eye out for potential hazards.

Another important safety recommendation is to never touch the pool pump or filter with wet hands or feet. Water and electricity don’t mix, and touching the equipment with wet hands or feet can result in a serious electrical shock. Always dry your hands and feet thoroughly before working with the equipment.

When cleaning or backwashing the pool filter, be sure to follow the manufacturer’s instructions. Using the wrong cleaning solution or technique can damage the filter and reduce its effectiveness. It’s also important to dispose of the used cleaning solution properly to avoid environmental damage.

It’s also a good idea to inspect the pool pump and filter regularly for signs of wear or damage. Look for cracks or leaks in the equipment, and listen for any unusual sounds when the equipment is running. If you notice any problems, it’s important to address them promptly to avoid further damage or injury.

Finally, it’s important to follow the manufacturer’s recommended maintenance schedule for the pool pump and filter. Regular maintenance can help extend the life of the equipment and prevent costly repairs. It’s also a good idea to have a professional inspect the equipment annually to ensure it’s functioning properly.

In conclusion, working with a pool pump and filter can be dangerous if not handled correctly. It’s important to take the necessary safety precautions to ensure your safety and the safety of those around you. Remember to turn off the power, wear appropriate safety gear, use the right tools, be aware of your surroundings, never touch the equipment with wet hands or feet, follow the manufacturer’s instructions, inspect the equipment regularly, and follow the recommended maintenance schedule. By following these safety recommendations, you can enjoy your pool without putting yourself or others at risk. Stay safe out there, my friends!

Cheers,

Pool Pump And Filter Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Pool Pump And Filter Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket