Call 1300 877 609 to find out about the latest offers available.

Multi Borer Safe Work Method Statement (SWMS)

SKU:SWMAU7332

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Multi Borer Safe Work Method Statement (SWMS)

Introducing our Multi Borer Safe Work Method Statement – the perfect tool for ensuring a safe and efficient workplace when operating high-risk machinery. Our SWMS is designed to provide you with comprehensive guidance and information to ensure that your work is done in compliance with all relevant regulations and standards.

Key Features:

  • Pre-filled and Comprehensive: Our SWMS is pre-filled with all the necessary information required to ensure that you are operating safely and efficiently. It covers all the relevant aspects of the work, including project scope, project details, risk assessment, PPE requirements, and legislative references.
  • Fully Editable and Customisable: Our SWMS is fully editable and customisable in Microsoft Word format, making it easy for you to adjust it to your specific project requirements. This means that you can tailor the SWMS to your project’s unique needs and ensure that it covers all the necessary details.
  • Checklist of High-Risk Machinery: Our SWMS includes a checklist of any high-risk machinery on site, ensuring that you are aware of any potential risks associated with the equipment you are using.
  • Staff Training Records: Our SWMS includes space for recording any staff training, ensuring that you can keep track of who has received the necessary training and when.
  • Before and After Risk Ratings: Our SWMS includes before and after risk ratings, allowing you to assess the level of risk before and after implementing the SWMS.
  • Legislative References: Our SWMS includes resources for use of legislative references, ensuring that you are aware of all relevant regulations and standards that you need to comply with.
  • PPE Requirements: Our SWMS includes all PPE required for the job, ensuring that you are fully prepared and equipped to operate safely.
  • Risk Assessment and Risk Assessment Matrix: Our SWMS includes a risk assessment and risk assessment matrix, ensuring that you are aware of all the potential risks associated with the work you are doing and can take appropriate measures to manage them.
  • Checklist for Implementation: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS, ensuring that you don’t miss anything crucial.
  • Sign-off Page: Our SWMS includes a sign-off page for all workers and responsible persons, ensuring that everyone is aware of their responsibilities and has agreed to comply with the SWMS.
  • Easy to Use and Customise: Our SWMS is easy to use and customise, allowing you to adjust it to your project’s unique needs and ensure that it covers all the necessary details.
  • Suitable for Large Contracts and Tenders: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work, ensuring that you are fully prepared to take on any project.
  • Instant Download: Our SWMS is available for instant download, ensuring that you have access to it as soon as you need it.

We believe that our SWMS is the perfect tool for ensuring a safe and efficient workplace when working with a multi borer. It provides you with all the necessary information and guidance to ensure that you are operating safely and efficiently, while also allowing you to customise it to your specific project requirements. Order your copy today and experience the benefits of a comprehensive SWMS for yourself!

Here is some safety information related to working with a multi borer.

Hazards:

  • Risk of injury from rotating drill bits.
  • Risk of electrical shock from machinery.
  • Risk of material being ejected from the machine during operation.
  • Risk of slips, trips, and falls due to uneven surfaces or debris on the floor.
  • Risk of noise-induced hearing loss from operating the machine.

Control Measures:

  • All workers operating the multi borer must have received training on how to use the machine safely.
  • Personal protective equipment (PPE) must be worn at all times, including eye and ear protection, gloves, and safety footwear.
  • The work area must be free from any debris or obstructions that could cause a slip or trip hazard.
  • The multi borer must be inspected before use to ensure it is in good working order.
  • Workers must be aware of the location of emergency stop buttons and know how to use them.
  • Workers must keep a safe distance from the machine while it is in operation.
  • Only authorised personnel should be allowed to operate the multi borer.
  • The machine must be switched off and unplugged when not in use.
  • Workers must be trained on how to respond to an emergency, such as a worker becoming injured or the machine malfunctioning.

Job Steps:

  1. Preparation
  • Conduct a pre-start safety check of the multi borer.
  • Check the work area is clear of any debris or obstructions.
  • Put on appropriate PPE.
  1. Set Up
  • Position the multi borer in the appropriate location for the work to be completed.
  • Ensure the machine is level and stable.
  • Attach the appropriate drill bit for the job.
  1. Operation
  • Turn on the machine and begin the drilling operation.
  • Monitor the machine and the work area for any hazards or issues.
  • If an issue arises, stop the machine immediately using the emergency stop button and address the issue before continuing.
  1. Completion
  • Once the drilling is complete, turn off the machine and unplug it from the power source.
  • Remove the drill bit and clean the machine.
  • Conduct a post-operation safety check of the multi borer.
  • Store the machine and any associated tools and equipment in a safe and secure location.

Emergency Procedures:

  • In the event of an emergency, stop the machine immediately using the emergency stop button.
  • Provide first aid to any injured workers as necessary.
  • Contact emergency services if required.
  • Conduct an incident investigation to determine the cause of the emergency and identify any corrective actions to prevent a similar incident from occurring in the future.

Gary’s Safety Tips

Hey there, my friends! Today, I want to talk to you about a serious topic that affects many industries and businesses out there. It’s about the dangers and safety recommendations when it comes to working with a multi borer.

Now, I know some of you might be thinking, “What’s a multi borer?” Well, let me tell you, it’s a powerful piece of machinery used for drilling multiple holes in wood, plastic, and other materials. It’s a fantastic tool, no doubt, but it also comes with significant risks if not used correctly.

First and foremost, the biggest danger of working with a multi borer is the risk of injury. The powerful drills can quickly cause harm if not handled correctly. The most common injuries are cuts, lacerations, and even amputations. That’s why it’s crucial to follow strict safety guidelines when using a multi borer.

The first safety recommendation when working with a multi borer is to make sure you are wearing the right personal protective equipment (PPE). This includes eye protection, ear protection, and gloves. Also, make sure that your clothing is not loose-fitting, as it can quickly get caught in the machine’s moving parts.

Secondly, it’s crucial to inspect the machine before use. Make sure that all the moving parts are lubricated, and the drill bits are secured correctly. Any loose or damaged parts must be replaced before use. Failure to do so can result in equipment failure and injury.

Thirdly, make sure that the machine is on a stable surface and that it’s correctly anchored or secured. Any movement during operation can cause accidents or damage to the machine.

Fourthly, always read the manufacturer’s instructions before using the multi borer. The guidelines will give you a detailed rundown of the machine’s capabilities and limitations, and how to operate it safely.

Fifthly, never operate the multi borer if you’re tired, under the influence of drugs or alcohol, or have any medical conditions that may affect your ability to operate the machine safely.

Lastly, always keep a safe distance from the machine during operation. Accidents can happen unexpectedly, and you don’t want to be in harm’s way if something goes wrong.

In conclusion, a multi borer is an essential tool in many industries, but it also comes with significant risks if not handled correctly. Always follow strict safety guidelines and wear the right PPE when working with the machine. Inspect the machine before use, ensure it’s on a stable surface, and read the manufacturer’s instructions before using it. Never operate the machine if you’re tired, under the influence, or have any medical conditions that may affect your ability to operate it safely. Lastly, always keep a safe distance from the machine during operation.

Remember, guys, your safety should always come first, and it’s up to you to take the necessary precautions to protect yourself and others around you. So stay safe, my friends, and keep on grinding!

Cheers,

Multi Borer Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Multi Borer Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket