Call 1300 877 609 to find out about the latest offers available.

Mulcher Tractor Mounted Safe Work Method Statement

SKU:SWMAU9741

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Mulcher Tractor Mounted Safe Work Method Statement

Introducing our Mulcher Tractor Mounted Safe Work Method Statement (SWMS)! Our SWMS is designed to help you and your team work safely and efficiently when operating a mounted mulcher tractor. Here’s what you can expect from our product:

Pre-filled and Comprehensive: Our SWMS is pre-filled with all the essential details you need to complete the project safely. It is also comprehensive, covering all the critical aspects of working with a mounted mulcher tractor.

Fully Editable and Customisable: Our SWMS comes in Microsoft Word format, making it easy to edit and customise as per your specific project requirements. You can tailor it to your needs, making it work for your project.

Scope of the Project and Project Details: Our SWMS includes a section on the project scope and details, providing you with a clear understanding of what needs to be done and how.

Checklist of Any High Risk Machinery on Site: Our SWMS includes a checklist of all the high-risk machinery on the site, ensuring that you have a comprehensive understanding of the hazards present.

Space for Recording Staff Training: Our SWMS includes space for recording staff training to ensure that everyone involved is adequately trained and prepared to work safely.

Before and After Risk Ratings: Our SWMS includes before and after risk ratings, providing you with a clear understanding of the risks involved and how the SWMS helps mitigate them.

Resources for Use of Legislative References: Our SWMS includes resources for the use of legislative references, making it easy for you to comply with regulations and standards.

All PPE Required: Our SWMS includes all personal protective equipment (PPE) required to work safely with a mounted mulcher tractor.

Risk Assessment and Risk Assessment Matrix: Our SWMS includes a risk assessment and risk assessment matrix, ensuring that all risks are identified, assessed and managed.

Checklist to Ensure all Requirements are Covered: Our SWMS includes a checklist to ensure that all requirements are covered when implementing the SWMS, making it easy to ensure that nothing is overlooked.

Sign-Off Page for All Workers and Responsible Persons: Our SWMS includes a sign-off page for all workers and responsible persons to acknowledge their understanding and commitment to following the SWMS.

Suitable for Large Contracts and Tenders: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work.

Instantly Delivered Download: Our SWMS is an instantly delivered download, ensuring that you can access it immediately and start working safely and efficiently.

Our SWMS is easy to use and easy to customise, making it an excellent choice for your project. It has been carefully designed with both personality and professionalism, helping you to work safely while staying engaged with the process. So why wait? Order your Safe Work Method Statement for working with a mounted mulcher tractor today!

Here is some safety information related to working with a mounted mulcher tractor.

Hazards and Risks: The following hazards and risks are associated with the use of mulcher tractor mounted machines:

  • Entanglement, crushing and impact injuries from moving parts, such as the blades, belts and drums.
  • Dust, noise and vibration hazards that may cause respiratory problems, hearing loss or musculoskeletal disorders.
  • Fire and explosion hazards due to the buildup of flammable materials such as dry leaves and branches.
  • Electrical hazards due to the use of electric-powered mulchers.
  • Chemical hazards due to the use of pesticides, herbicides and other chemicals to control vegetation.
  • Slips, trips and falls due to uneven terrain, wet or slippery surfaces and obstacles on the ground.
  • Traffic hazards due to the proximity of the work area to roads and other vehicles.

Controls: To mitigate the hazards and risks associated with the use of mulcher tractor mounted machines, the following controls should be implemented:

  1. Personal Protective Equipment (PPE): All personnel operating, maintaining or repairing mulcher tractor mounted machines must wear the following PPE:
  • Hard hat
  • Safety glasses or goggles
  • Ear plugs or ear muffs
  • Respirator mask if required
  • Gloves
  • Steel-toed boots
  1. Training and Induction: All personnel must receive training and induction on the safe operation, maintenance and repair of mulcher tractor mounted machines before commencing work.
  2. Maintenance and Inspection: Mulcher tractor mounted machines must be regularly maintained and inspected to ensure that they are in good working order. Before each use, the following checks must be performed:
  • Check the blades, belts and drums for damage or wear.
  • Check the brakes, steering and other controls for proper operation.
  • Check the fuel, oil and other fluid levels.
  • Check the tires for proper inflation and wear.
  • Check the electrical system for loose connections, damaged wires or other faults.
  1. Work Area Preparation: Before starting work, the work area must be prepared to ensure that it is safe and free from hazards. The following steps should be taken:
  • Clear the work area of debris, obstacles and other hazards.
  • Mark the boundaries of the work area with cones or barriers.
  • Ensure that the work area is well lit and visible to other vehicles and pedestrians.
  • Ensure that the mulcher tractor mounted machine is parked on a level surface.
  1. Operational Controls: The following operational controls should be implemented when using mulcher tractor mounted machines:
  • Do not operate the machine unless you are authorised and trained to do so.
  • Ensure that all guards and safety devices are in place and in good condition.
  • Do not wear loose clothing or jewellery that may become entangled in the moving parts.
  • Keep your hands and feet away from the moving parts.
  • Use a ground guide to assist with manoeuvring the machine if necessary.
  • Do not use the machine near electrical lines or other hazards.
  • Always maintain a safe distance from other personnel and vehicles in the work area.
  1. Emergency Procedures: Emergency procedures should be in place in case of accidents, incidents or other emergencies. The following procedures should be followed:
  • If an accident or incident occurs, stop the machine immediately and assess the situation.
  • Call for medical assistance if necessary.
  • Follow the company’s reporting and investigation procedures for accidents and incidents.
  • Have a fire extinguisher and first aid kit readily available.

Gary’s Safety Tips

Hey there, my friends! Today, I want to talk to you about something that’s really important if you’re in the agricultural business: the dangers of working with a mounted mulcher tractor and some safety recommendations to keep in mind.

First off, let’s talk about the dangers. Working with a mounted mulcher tractor can be extremely hazardous if you don’t take the necessary precautions. One of the biggest risks is the possibility of getting caught in the mulcher. If you’re not careful, loose clothing or hair can get caught in the machine and cause serious injuries. It’s essential to make sure that you’re wearing tight-fitting clothes and keeping your hair tied back when operating the machine.

Another danger is the risk of flying debris. As the mulcher spins, it can throw out debris, including rocks, sticks, and other objects that can cause serious injuries to you or anyone else in the area. That’s why it’s important to always wear appropriate protective gear, such as goggles, a hard hat, and gloves.

Additionally, you need to be aware of your surroundings when operating the mounted mulcher tractor. The machine can be loud and may make it difficult to hear other machinery or people in the area. It’s essential to have a spotter to help you maneuver the tractor, especially if you’re working near buildings, fences, or other obstacles.

Now, let’s talk about some safety recommendations to keep in mind when working with a mounted mulcher tractor. First and foremost, it’s important to make sure that the tractor is properly maintained and in good working order. Before each use, inspect the machine thoroughly to make sure that all parts are functioning correctly and that there are no loose or damaged parts.

Another important safety tip is to always read and follow the manufacturer’s instructions for operating the mounted mulcher tractor. Make sure that you understand how to properly start and stop the machine, as well as how to safely operate the various controls and levers.

In addition to wearing appropriate protective gear, it’s also essential to keep a safe distance from the mulcher when it’s in operation. Never get too close to the machine, especially when it’s mulching large pieces of debris or tree limbs.

Finally, it’s important to have a plan in place in case of an emergency. Make sure that you have a first aid kit on hand and that everyone on your team knows how to use it. Additionally, make sure that you have a way to quickly shut off the machine in case of an emergency.

In conclusion, working with a mounted mulcher tractor can be a dangerous job if you’re not careful. However, by taking the necessary safety precautions and following the manufacturer’s instructions, you can minimize the risks and ensure that everyone stays safe. So always remember to wear appropriate protective gear, keep a safe distance from the machine, and have a plan in place in case of an emergency. Stay safe out there, my friends!

Cheers,

Mulcher Tractor Mounted Safe Work Method Statement

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket