Call 1300 877 609 to find out about the latest offers available.

WHS System Packages

Industry Specific and Customised Safety Management Systems

ISO 9001 Quality Packages

Quality Assurance Documentation System Packages

ISO 45001 Safety Packages

Industry Specific ISO 45001 Safety Management System Packages

NDIS & Aged Care Packages

NDIS and Aged Care Documentation Systems and Related Services

Unlock the latest package deals.

1300 877 609

Metal Tube Bending Machine Safe Work Method Statement (SWMS)

SKU:

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Metal Tube Bending Machine Safe Work Method Statement (SWMS)

Introducing our comprehensive Metal Tube Bending Machine Safe Work Method Statement (SWMS). This SWMS is here to assist you in ensuring the safety and efficiency of your work processes. With a user-friendly format and an emphasis on customisation, our SWMS provides a valuable tool to help you navigate the complexities of your project.

Key Features:

  1. Pre-filled and Comprehensive: Our SWMS comes pre-filled with relevant content, covering a wide range of potential hazards and risks associated with metal tube bending machine operations. It serves as a solid foundation that can be easily tailored to meet your specific project requirements. By starting with a comprehensive base, you save valuable time and effort.
  2. Fully Editable and Customisable in Microsoft Word format: To ensure maximum flexibility, our SWMS is provided in Microsoft Word format. This allows you to effortlessly edit and customise the document to match the unique needs of your project. You have the freedom to add, remove, or modify sections as required, making it easy to adapt the SWMS to your specific circumstances.
  3. Scope of the Project and Project Details: Our SWMS includes a dedicated section to outline the scope of your project, providing a clear overview of the tasks involved. Additionally, it allows you to record essential project details such as start and end dates, project location, and any specific requirements or considerations.
  4. Checklist of High-Risk Machinery on Site: Ensuring the safety of workers is crucial, especially when dealing with high-risk machinery. Our SWMS includes a checklist to help you identify and document all high-risk machinery present at the worksite. By maintaining a comprehensive list, you can easily manage and mitigate potential risks associated with these machines.
  5. Space for Recording Staff Training: Training is key to ensuring a safe work environment. Our SWMS provides dedicated sections to record staff training, ensuring that all workers have received the necessary instruction and guidance to operate the metal tube bending machine safely. This allows you to maintain a transparent record of training, promoting accountability and compliance.
  6. Before and After Risk Ratings: To track progress and identify improvements, our SWMS includes sections to record before and after risk ratings. This enables you to assess the effectiveness of your safety measures, evaluate potential risks, and implement corrective actions where needed.
  7. Resources for Legislative References: Our SWMS includes a comprehensive collection of legislative references, providing you with the necessary resources to align your work practices with relevant regulations and standards. These references serve as a valuable guide, assisting you in creating a safer working environment while ensuring compliance.
  8. All PPE Required: Personal Protective Equipment (PPE) plays a vital role in safeguarding workers. Our SWMS includes a detailed list of all required PPE for metal tube bending machine operations. By explicitly listing the necessary equipment, you can ensure that all workers are adequately protected.
  9. Risk Assessment and Risk Assessment Matrix: Identifying and assessing risks is fundamental to any successful safety management strategy. Our SWMS includes a thorough risk assessment process, allowing you to identify potential hazards and their associated risks. Furthermore, a risk assessment matrix is included to help you prioritise and address risks effectively.
  10. Checklist to Ensure All Requirements are Covered: To ensure a comprehensive approach to safety, our SWMS includes a checklist that acts as a final review. This checklist enables you to verify that all essential requirements, procedures, and safety measures have been addressed and implemented, reducing the likelihood of oversights.
  11. Sign-off Page for Workers and Responsible Persons: Promoting accountability and ensuring commitment to safety is crucial. Our SWMS includes a sign-off page for both workers and responsible persons. By signing this page, individuals acknowledge their understanding of the SWMS, confirming their commitment to follow the outlined safety procedures.
  12. Easy to Use, Easy to Customise:Our SWMS is designed with user-friendliness in mind. With a clear and intuitive layout, it is easy to navigate and understand. Each section is well-organised, making it simple to locate and modify specific information. The document’s structure ensures a smooth workflow, allowing you to efficiently customise it to suit your project’s requirements.
  1. Suitable for Large Contracts and Tenders, including Tier 1 contractual work: Our SWMS is meticulously crafted to meet the stringent requirements of large contracts and tenders, including tier 1 contractual work. It provides a robust framework that aligns with industry standards and regulations, demonstrating your commitment to safety and compliance. By utilising our SWMS, you can confidently pursue and execute significant projects while maintaining a high level of safety.
  2. Instantly Delivered Download: We understand the urgency of project deadlines and the need for prompt access to vital documents. Upon purchase, our SWMS is instantly delivered as a downloadable file, allowing you to access it immediately. This ensures that you can get started on your project without delay, with the necessary safety measures at your fingertips.

Our SWMS is more than just a document; it is a valuable tool that empowers you to establish a safer work environment when operating a metal tube bending machine. By combining a comprehensive approach with customisable features, our SWMS assists you in identifying, assessing, and mitigating risks associated with this specific task. Purchase our SWMS today and take a proactive step towards enhancing safety on your project.

Here is some safety information related to using a metal tube bending machine.

Responsibilities:

  • The machine operator is responsible for ensuring the safe operation of the metal tube bending machine.
  • The supervisor or site manager is responsible for providing proper training, supervision, and ensuring compliance with safety procedures.
  • All personnel working in the vicinity of the machine must adhere to safety instructions and report any hazards or incidents immediately.Pre-Work Preparation:
  • Conduct a risk assessment to identify potential hazards associated with the operation of the metal tube bending machine.
  • Ensure all personnel operating the machine are trained and competent in its operation.
  • Inspect the machine for any defects or damage that may affect safe operation. If any issues are identified, they must be reported and resolved before use.
  • Ensure the work area is clean and free from obstructions.
  • Wear appropriate personal protective equipment (PPE), including safety glasses, gloves, and hearing protection.Safe Operating Procedures:
  • Familiarise yourself with the machine’s user manual and manufacturer’s instructions before operation.
  • Ensure the machine is properly set up, including securing it to a stable surface or workbench.
  • Verify that the bending dies, mandrels, and tooling are clean, in good condition, and suitable for the specific task.
  • Securely clamp the metal tube in the bending machine, ensuring it is aligned correctly.
  • Check that the machine is set to the appropriate bending angle and radius as required for the specific job.
  • Start the machine and initiate the bending process while maintaining a safe distance from moving parts.
  • Monitor the bending process closely, ensuring that the tube is bending smoothly and without any signs of excessive stress or strain.
  • If any abnormalities, unusual noises, or vibrations occur during the bending process, immediately stop the machine and investigate the issue before continuing.
  • Once the bending process is completed, power off the machine and remove the bent tube carefully.
  • Clean the machine and remove any debris or waste materials from the work area.Risk Control Measures:
  • Use appropriate guarding and safety devices to prevent contact with moving parts.
  • Regularly inspect the machine for wear, damage, or malfunction and promptly address any issues.
  • Provide adequate training to personnel on the safe operation of the machine.
  • Ensure a clear and unobstructed work area around the machine.
  • Use proper lifting techniques and equipment when handling heavy or awkward objects.
  • Follow lockout/tagout procedures when performing maintenance or repairs on the machine.Emergency Procedures:
  • In case of an emergency, immediately stop the machine, secure the area, and follow the site-specific emergency procedures.
  • Report any incidents, accidents, or near misses to the supervisor or site manager.
  • Provide first aid to injured personnel and seek medical attention as necessary.

Gary’s Safety Tips

Hey there, folks! Today, I want to talk about something really important: the dangers and safety recommendations when it comes to working with a metal tube bending machine. Trust me, this is not something to take lightly. It’s crucial to prioritise safety in any work environment, especially when operating heavy machinery like a metal tube bending machine. So, let’s dive right in and discuss the potential dangers and some safety precautions you need to keep in mind.

First off, let me be clear: working with a metal tube bending machine can be risky if you’re not careful. This powerful equipment has moving parts, high pressure, and electrical systems that demand respect and caution. One of the major risks involves the possibility of accidents caused by moving machine parts. Whether it’s the bending arm, feeding mechanism, or clamping devices, any contact with these moving components can result in serious injuries. That’s why it’s absolutely crucial to follow strict safety protocols to minimise the chances of accidents.

To begin with, always wear appropriate personal protective equipment (PPE) when operating a metal tube bending machine. This includes safety goggles, gloves, steel-toe boots, and hearing protection. Your eyes, hands, and feet need to be shielded from potential hazards such as flying debris, sharp edges, and loud noises. Neglecting to wear proper PPE can leave you vulnerable to injuries that could have been easily prevented.

Next up, familiarise yourself with the specific safety guidelines outlined in the machine’s user manual. Remember, each machine may have unique features and requirements. Take the time to thoroughly read and understand the manufacturer’s instructions. It might seem like a mundane task, but it’s crucial for your safety. By doing so, you’ll gain a clear understanding of how the machine operates and the specific safety precautions you need to follow.

In addition, ensure that the metal tube bending machine is well-maintained and in proper working condition. Regular inspections and maintenance checks are essential to identify any potential defects or malfunctions. Check for loose or damaged parts, ensure proper lubrication of moving components, and inspect electrical connections. Never overlook signs of wear and tear or any unusual noises coming from the machine. Addressing these issues promptly can prevent accidents and keep you safe.

When operating the machine, it’s important to maintain a focused mindset. Distractions can be dangerous, so eliminate any potential sources of distraction from your work area. Avoid using your phone or engaging in unrelated conversations while operating the machine. A momentary lapse in concentration can lead to catastrophic accidents. Stay alert, stay present, and stay safe.

Furthermore, never underestimate the importance of proper training. Operating a metal tube bending machine requires skill and knowledge. If you’re new to the machine or lack sufficient experience, seek training from a qualified instructor. They can guide you through the process, teach you the necessary techniques, and ensure you’re aware of potential risks and safety precautions. Investing time in training may seem like a hassle, but it’s an investment in your well-being.

Lastly, and I can’t stress this enough, never attempt to bypass safety features or take shortcuts. Safety features are there for a reason. They are designed to protect you and those around you. Tampering with or disabling these features can have disastrous consequences. Remember, your well-being is far more important than rushing through a job.

To wrap things up, folks, let’s remember that safety should always be a top priority when working with a metal tube bending machine. Familiarise yourself with the safety guidelines, wear proper PPE, maintain the machine regularly, eliminate distractions, seek training if needed, and never compromise on safety. It’s not about being overly cautious; it’s about taking the necessary steps to protect yourself and your colleagues from potential harm. By adopting a safety-first mindset, you not only ensure your own well-being but also create a culture of safety within your work environment.

So, my friends, as you step into the world of metal tube bending machines, always keep safety at the forefront of your mind. Remember, accidents can happen in the blink of an eye, but by following these safety recommendations, you significantly reduce the risks involved.

Now, get out there, stay safe, and keep bending those tubes like the pros you are!

Regards,

Metal Tube Bending Machine Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Metal Tube Bending Machine Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket