Call 1300 877 609 to find out about the latest offers available.

WHS System Packages

Industry Specific and Customised Safety Management Systems

ISO 9001 Quality Packages

Quality Assurance Documentation System Packages

ISO 45001 Safety Packages

Industry Specific ISO 45001 Safety Management System Packages

NDIS & Aged Care Packages

NDIS and Aged Care Documentation Systems and Related Services

Unlock the latest package deals.

1300 877 609

Metal Plate Rolling Machine Safe Work Method Statement (SWMS)

SKU:

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Metal Plate Rolling Machine Safe Work Method Statement (SWMS)

Introducing our Metal Plate Rolling Machine Safe Work Method Statement (SWMS) — a comprehensive and pre-filled document designed to assist you in managing workplace safety effectively. Our SWMS priorities customisation, ease of use, and adherence to legislative requirements, helping you streamline your project planning and execution with confidence. Let’s explore the key features that make our SWMS a valuable tool for your workplace safety needs:

  1. Pre-filled and Comprehensive: Our SWMS comes pre-filled with essential information and comprehensive guidelines, providing you with a solid foundation to start building your safety plan. While we cannot guarantee it covers every possible detail specific to your project, it serves as a valuable starting point to address common safety concerns associated with working with a metal plate rolling machine.
  2. Fully Editable and Customisable: Delivered in Microsoft Word format, our SWMS offers complete flexibility for customisation. You can easily tailor the document to align with your specific project requirements, incorporating site-specific hazards, control measures, and other necessary details.
  3. Scope of the Project and Project Details: Our SWMS includes a dedicated section to outline the project’s scope and key details, providing a clear understanding of the work being performed. This helps in communicating the specific requirements and hazards associated with working on the metal plate rolling machine.
  4. Checklist of High-Risk Machinery on Site: To ensure comprehensive risk management, our SWMS includes a checklist of high-risk machinery commonly found on worksites. By identifying and addressing potential hazards related to the metal plate rolling machine and other equipment, you can proactively implement appropriate control measures.
  5. Space for Recording Staff Training: Training plays a crucial role in promoting workplace safety. Our SWMS offers designated spaces to record staff training, including induction, competency assessments, and refresher courses. This feature helps you maintain a comprehensive record of employee training, fostering a safety-conscious work environment.
  6. Before and After Risk Ratings: Our SWMS incorporates before and after risk ratings, enabling you to assess the effectiveness of control measures implemented. This feature allows you to track improvements in risk reduction over time, providing valuable insights into the success of your safety measures.
  7. Resources for Legislative References: Staying compliant with legislative requirements is vital. Our SWMS includes a section that provides resources for legislative references, helping you easily access and incorporate relevant regulations, codes of practice, or standards into your safety planning.
  8. Inclusion of All Required PPE: Personal Protective Equipment (PPE) is crucial for safeguarding workers. Our SWMS lists all the necessary PPE required for working with a metal plate rolling machine. By ensuring compliance with PPE guidelines, you create a safer work environment for your team.
  9. Risk Assessment and Risk Assessment Matrix: Our SWMS incorporates a comprehensive risk assessment, identifying potential hazards and their associated risks. This includes a risk assessment matrix, which assists in evaluating the level of risk and determining appropriate control measures to mitigate them effectively.
  10. Checklist to Ensure Comprehensive Coverage: Our SWMS features a checklist to ensure all necessary requirements have been covered when implementing the document. This helps you identify any potential gaps in your safety planning and provides a systematic approach to ensure nothing is overlooked.
  11. Sign-off Page for Workers and Responsible Persons: To emphasise accountability and promote a culture of safety, our SWMS includes a sign-off page. This allows all workers and responsible persons to acknowledge their understanding of the SWMS and their commitment to adhering to its guidelines.
  12. Easy to Use and Customise: Our SWMS is designed with user-friendliness in mind. With its clear formatting and intuitive structure, it simplifies the process of creating and managing a safety plan. You can easily navigate through the document, add or remove sections as needed, and customise it to suit your specific project requirements. We have carefully crafted the SWMS to ensure it is straightforward and accessible, saving you time and effort in creating a comprehensive safety plan.
  1. Suitable for Large Contracts and Tenders: Our SWMS is designed to meet the needs of large contracts and tenders, including tier 1 contractual work. Whether you are involved in a significant construction project or undertaking a high-profile job, our SWMS provides the necessary framework to meet rigorous safety standards and demonstrate your commitment to workplace safety.
  2. Instantly Delivered Download: We understand the importance of efficiency in your work processes. Upon purchase, you will receive an instant download of our SWMS in Microsoft Word format. This means you can get started right away, without any delays or waiting periods.

With a balance of professionalism and a touch of personality, our SWMS for working with a metal plate rolling machine is a valuable resource for enhancing workplace safety. It provides a solid foundation, allows customisation, and helps you comply with legislative requirements while addressing common hazards associated with this specific task. Empower your team with a comprehensive safety plan that promotes a culture of well-being and ensures a safer work environment. Take the first step towards efficient and effective safety management by incorporating our SWMS into your project today.

Here is some safety information related to using a metal plate rolling machine.

Hazards and Risks:

  1. Pinch points and entanglement hazards from moving parts of the rolling machine.
  2. Crushing and trapping hazards from the weight and movement of metal plates.
  3. Manual handling hazards due to the weight and size of metal plates.
  4. Noise exposure from the operation of the machine.
  5. Risk of cuts and injuries from sharp edges of metal plates.
  6. Electrical hazards from the machine’s power supply.

Control Measures:

  1. Personal Protective Equipment (PPE):
    a. All personnel involved in the operation must wear the following PPE:

    • Safety goggles or face shield
    • Safety gloves
    • Hearing protection
    • Steel-toed safety boots
    • High-visibility vests b. Additional PPE may be required based on the specific task or site requirements.
  2. Training and Competency:
    a. Ensure all personnel operating the rolling machine are adequately trained and competent to perform the task.
    b. Provide training on machine operation, safety procedures, and emergency protocols.
    c. Maintain records of training and competency assessments.
  3. Machine Inspection and Maintenance:
    a. Regularly inspect the rolling machine for any damage or malfunction.
    b. Conduct routine maintenance according to the manufacturer’s recommendations.
    c. Immediately address any faults or defects identified during inspections.
  4. Safe Operating Procedures:
    a. Before starting work, conduct a risk assessment of the area and identify potential hazards.
    b. Ensure the work area is clear of obstacles and tripping hazards.
    c. Mark and secure the boundaries of the work area.
    d. Ensure all necessary permits or approvals are obtained before commencing work.
    e. Use lifting equipment (e.g., cranes, forklifts) for moving and positioning metal plates, if required.
    f. Avoid overloading the machine by adhering to its specified capacity.
    g. Position the metal plates securely on the machine’s rollers and adjust the machine settings according to the plate thickness and desired outcome. h. Avoid placing hands or body parts near moving parts of the machine.
    i. Use appropriate tools (e.g., clamps, tongs) to handle metal plates and minimise direct contact.
    j. Regularly inspect the rolled plates for quality and dimensional accuracy.
    k. Shut down the machine and isolate the power supply before performing any maintenance or adjustments.
  5. Emergency Procedures:
    a. Identify and communicate emergency evacuation routes and assembly points to all personnel.
    b. Ensure the availability and accessibility of emergency contact numbers.
    c. Provide training on emergency response procedures, including fire evacuation and first aid.
  6. Housekeeping:
    a. Maintain a clean and organised work area to minimise trip hazards.
    b. Properly store tools and equipment when not in use.
    c. Dispose of waste materials and scrap metal in designated containers.

Gary’s Safety Tips

Hello, my friends! Today, I want to talk about a topic that’s crucial for anyone working with metal plate rolling machines. Now, I know you’re all about hustling and getting things done, but it’s important to remember that safety should always be a top priority in any workplace. That’s why I want to discuss the dangers associated with metal plate rolling machines and share some valuable safety recommendations to keep you all safe and sound.

First things first, let’s address the dangers that come with operating these machines. When you’re dealing with heavy machinery and metal plates, there’s always a risk of accidents and injuries if you’re not careful. One of the main hazards is the potential for entanglement or crushing. The rolling process involves feeding the metal plate through a series of rollers that apply pressure to shape the material. If your hands, clothing, or any other body part gets caught in the rollers, it can lead to severe injuries or even amputation.

Another danger to watch out for is the possibility of flying debris or sparks. When metal plates are being rolled, they can produce small chips or fragments that may be ejected at high speeds. These projectiles can cause serious eye injuries if proper eye protection isn’t worn. Additionally, the rolling process can generate sparks, posing a fire hazard if there are flammable materials nearby.

Now that we’ve covered some of the potential risks, let’s move on to the safety recommendations that can help mitigate these dangers. Remember, safety is a team effort, and it’s crucial to create a culture where everyone is committed to following these guidelines.

First and foremost, before operating a metal plate rolling machine, it’s essential to receive proper training. Make sure you fully understand the machine’s operation, including its controls, emergency stop mechanisms, and safety features. Knowing how to use the equipment correctly will significantly reduce the risk of accidents.

Always wear the appropriate personal protective equipment (PPE). This includes safety glasses or a face shield to protect your eyes from debris, gloves to safeguard your hands, and steel-toed boots to shield your feet from potential hazards. Don’t take any shortcuts when it comes to PPE—your safety is worth every extra second it takes to put on the necessary gear.

Inspect the machine before each use to ensure it’s in proper working condition. Check for any loose or damaged parts, frayed cables, or malfunctioning safety mechanisms. If you notice anything out of the ordinary, report it to your supervisor immediately and refrain from operating the machine until it’s fixed.

Maintain a clean and organised workspace. Keep the area around the metal plate rolling machine free from clutter, oil, or any other slippery substances. A clean workspace not only prevents accidents but also allows you to move around safely without tripping or stumbling.

Another crucial safety recommendation is to use a buddy system. Whenever possible, have a coworker present when operating the machine. They can act as a lookout for potential hazards and be ready to assist in case of an emergency. Having an extra set of eyes and hands can make a significant difference in keeping you safe.

Lastly, never underestimate the importance of taking regular breaks. Fatigue can impair your judgment and reaction time, increasing the likelihood of accidents. Make sure to rest and recharge to maintain focus and concentration throughout your workday.

My friends, working with metal plate rolling machines can be rewarding and productive, but it’s vital to prioritised your safety at all times. Remember the dangers associated with these machines and follow the safety recommendations I’ve shared. By being aware, prepared, and proactive, you can ensure a secure and thriving workplace for yourself and your team.

Keep hustling, stay safe, and until next time, take care!

Regards,

Metal Plate Rolling Machine Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Metal Plate Rolling Machine Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket