Call 1300 877 609 to find out about the latest offers available.

WHS System Packages

Industry Specific and Customised Safety Management Systems

ISO 9001 Quality Packages

Quality Assurance Documentation System Packages

ISO 45001 Safety Packages

Industry Specific ISO 45001 Safety Management System Packages

NDIS & Aged Care Packages

NDIS and Aged Care Documentation Systems and Related Services

Unlock the latest package deals.

1300 877 609

Metal Bending Machine Safe Work Method Statement (SWMS)

SKU:

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Metal Bending Machine Safe Work Method Statement (SWMS)

Introducing our Metal Bending Machine Safe Work Method Statement (SWMS). Our SWMS is a comprehensive and pre-filled document that provides essential guidelines to ensure a safe working environment. With an emphasis on helping you comply with safety regulations, our SWMS is fully editable and customisable in Microsoft Word format, making it incredibly user-friendly.

Key Features:

  1. Pre-filled and Comprehensive: Our SWMS comes pre-filled with detailed information, covering all the necessary aspects of working with metal bending machines. It saves you time and effort by providing a comprehensive foundation to build upon.
  2. Fully Editable and Customisable: Our SWMS is delivered in Microsoft Word format, allowing you to easily customise and adapt it to your specific project requirements. You have the flexibility to add, remove, or modify any information to align with your unique work environment.
  3. Scope of the Project and Project Details: Our SWMS includes a clear scope of the project, outlining the specific tasks and activities related to working with metal bending machines. It also captures important project details, such as timelines and project stakeholders, ensuring everyone is on the same page.
  4. Checklist of High-Risk Machinery: We understand the significance of identifying and managing high-risk machinery on-site. Our SWMS includes a checklist that helps you identify and document any high-risk machinery associated with metal bending, ensuring a systematic approach to risk assessment.
  5. Staff Training Records: Safety is enhanced when your staff are well-trained. Our SWMS provides designated sections to record staff training, ensuring that all personnel operating the metal bending machines have received proper training, contributing to a safer work environment.
  6. Before and After Risk Ratings: Our SWMS enables you to assess and monitor risk levels effectively. It includes spaces to record before and after risk ratings, allowing you to measure the effectiveness of implemented control measures and continuously improve safety protocols.
  7. Legislative References: To facilitate compliance with regulations, our SWMS provides resources for legislative references related to metal bending machines. It ensures that you have access to the necessary information to meet legal requirements and industry standards.
  8. Required Personal Protective Equipment (PPE): The safety of your workers is paramount. Our SWMS outlines all the necessary personal protective equipment (PPE) required when working with metal bending machines. It ensures that your workers have the appropriate gear to mitigate potential hazards.
  9. Risk Assessment and Risk Assessment Matrix: Our SWMS includes a comprehensive risk assessment section. It guides you through the process of identifying hazards, assessing risks, and implementing control measures. Additionally, a risk assessment matrix is provided to help you evaluate and prioritise risks effectively.
  10. Checklist for Complete SWMS Implementation: Our SWMS incorporates a checklist to ensure that all essential requirements have been addressed and covered when implementing the SWMS. It acts as a helpful reminder to guarantee that no critical aspects are overlooked.
  11. Sign-Off Page for Workers and Responsible Persons: To promote accountability and acknowledgment, our SWMS includes a sign-off page. It ensures that all workers and responsible persons involved in the project have read and understood the SWMS, fostering a culture of safety and compliance.
  12. Easy to Use and Customise: We understand the importance of simplicity in document management. Our SWMS is designed to be easy to use and customise, allowing you to navigate through the document effortlessly and tailor it to your specific needs.
  13. Suitable for Large Contracts and Tenders: Our SWMS is well-suited for large contracts and tenders, including tier 1 contractual work. It provides the necessary level of detail and professionalism required for complex projects, helping you meet the stringent safety requirements often associated with major contracts.
  14. Instantly Delivered Download: Time is valuable, and we strive to save youtime and streamline your processes. Once you make a purchase, our SWMS is instantly delivered as a downloadable file, allowing you to access and start using it immediately.

With a touch of personality mixed with professionalism, our SWMS is your trusted companion when it comes to working with metal bending machines. It provides a solid foundation for ensuring the safety of your workers and compliance with regulations. Remember, safety is a collaborative effort, and our SWMS is here to assist you every step of the way.

Here is some safety information related to using a metal bending machine.

Hazards:

  1. Pinch points and crushing hazards when feeding metal into the machine.
  2. Potential for entanglement of clothing or body parts in moving parts.
  3. Exposure to sharp edges and flying debris during the bending process.
  4. Risk of electrical shock when working with electrical components.
  5. Noise exposure above recommended levels.
  6. Manual handling risks when moving heavy metal sheets.
  7. Slips, trips, and falls due to cluttered work area or slippery floors.

Risk Assessment: Prior to commencing the work, a thorough risk assessment should be conducted to identify specific hazards and implement appropriate control measures. The following control measures should be considered:

  1. Personal Protective Equipment (PPE): a. All personnel operating the machine must wear appropriate PPE, including safety glasses, gloves, and steel-capped boots. b. Hearing protection should be worn when noise levels exceed recommended limits.
  2. Machine Safety: a. Ensure the machine is in good working condition and regularly maintained. b. Read and follow the manufacturer’s instructions and safety guidelines. c. Keep the machine’s guards and safety devices in place and functional. d. Only trained and authorised personnel should operate the machine. e. Do not bypass or tamper with any safety features.
  3. Safe Work Procedures: a. Conduct a thorough inspection of the work area, removing any potential hazards and ensuring good housekeeping. b. Use mechanical aids, such as trolleys or forklifts, to move heavy metal sheets. c. Position the machine in a well-lit area with adequate space for manoeuvring. d. Securely clamp the metal sheets before bending to prevent movement during the process. e. Ensure proper training and supervision for new or inexperienced operators. f. Regularly inspect and maintain tools and equipment.
  4. Electrical Safety: a. Ensure the machine is properly grounded. b. Avoid working with wet hands or in wet conditions. c. Do not overload electrical circuits. d. Report any electrical faults or malfunctions immediately.

Emergency Procedures:

  1. Emergency Contacts: a. [Specify the emergency contact numbers on-site] b. [Specify the location of the nearest first aid kit and fire extinguisher]
  2. First Aid: a. All personnel should be familiar with the location of the first aid kit. b. In the event of an injury, administer first aid as trained or seek medical assistance.
  3. Fire Safety: a. Familiarise yourself with the location of fire extinguishers and evacuation routes. b. In case of a fire, sound the alarm and evacuate the area according to the site’s emergency response plan. c. Do not use water on electrical fires.

Gary’s Safety Tips

Hey, everyone! Today, I want to talk about something that’s crucial to your safety in the workplace. We’re going to dive into the dangers and safety recommendations when it comes to working with a metal bending machine. Now, I know you’re eager to get those projects done and push the boundaries of what you can create, but it’s important to prioritised your well-being. So, let’s buckle up and get into it!

When you’re dealing with a metal bending machine, there are several risks that you need to be aware of. First and foremost, the moving parts of the machine can be a serious hazard. The sheer force and speed at which these parts operate can cause significant injuries if you’re not careful. Whether it’s the bending arm, the clamping mechanism, or the feeding mechanism, always remember that they’re not to be taken lightly.

Another danger to watch out for is the sharp edges of the metal being bent. One wrong move, and you could end up with a nasty cut or laceration. The metal itself can also pose a risk of flying debris, so wearing appropriate protective gear like safety glasses is a must. Trust me, it’s better to be safe than sorry.

Now, let’s get down to the safety recommendations. I want you to keep these in mind every time you step foot near a metal bending machine. Safety should never be an afterthought, my friends.

First off, always wear the right personal protective equipment (PPE). This includes safety glasses, gloves, and steel-toed boots. Don’t underestimate the importance of PPE. It’s there to shield you from potential harm, so make sure you’re properly equipped.

Next, make sure you’re familiar with the specific operating procedures of the metal bending machine you’re using. Read the instruction manual, attend any necessary training sessions, and understand the safety features of the machine. Knowledge is power, and it can save you from unnecessary accidents.

Keep your work area clean and organised. Clutter can lead to trips, slips, and falls, which are accidents waiting to happen. By maintaining a tidy workspace, you reduce the risk of injury and create an environment that promotes efficiency.

Always double-check your measurements and make sure the metal is properly secured before bending. Rushing through these steps can lead to mistakes, which can not only ruin your project but also put you in harm’s way. Take the time to do it right, my friends.

Never, and I repeat, never attempt to bypass or disable any safety mechanisms on the machine. They’re there for a reason – to protect you. Don’t get tempted by shortcuts or try to speed up the process by compromising your safety. It’s just not worth it.

Lastly, be mindful of your body position and posture while operating the metal bending machine. Maintain a stable stance, distribute your weight evenly, and avoid any awkward positions that could strain your muscles or joints. Taking care of your body is just as important as taking care of your projects.

So there you have it, my friends. Working with a metal bending machine can be an exhilarating experience, but it’s vital to prioritise your safety above all else. Remember the dangers I mentioned earlier, and implement the safety recommendations I’ve given you. Your well-being matters, and by taking these precautions, you’re setting yourself up for success.

Keep hustling, stay safe, and never stop pushing the boundaries of what you can create. Together, we can accomplish anything.

Regards,

Metal Bending Machine Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Metal Bending Machine Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket