Call 1300 877 609 to find out about the latest offers available.

WHS System Packages

Industry Specific and Customised Safety Management Systems

ISO 9001 Quality Packages

Quality Assurance Documentation System Packages

ISO 45001 Safety Packages

Industry Specific ISO 45001 Safety Management System Packages

NDIS & Aged Care Packages

NDIS and Aged Care Documentation Systems and Related Services

Unlock the latest package deals.

1300 877 609

Log Loader Safe Work Method Statement (SWMS)

SKU:

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Log Loader Safe Work Method Statement (SWMS)

Introducing our Log Loader Safe Work Method Statement (SWMS)! Our product is designed to help ensure the safety of workers and those around them when operating heavy machinery. Here are some key features:

  • Pre-filled and Comprehensive: Our SWMS is pre-filled with the necessary details to get you started, but it’s also fully customisable in Microsoft Word format. This means you can easily add or remove information to make it specific to your project and requirements.
  • Includes the scope of the project and the project details: This feature ensures that the SWMS accurately reflects the work that is to be performed, including project scope and details.
  • Includes checklist of any high-risk machinery on site: Our SWMS includes a checklist to help identify any high-risk machinery on site, allowing for extra precautions to be taken.
  • Includes space for recording any staff training: To ensure all staff are properly trained and equipped to perform the job safely, our SWMS includes space to record any staff training.
  • Includes before and after risk ratings: With our SWMS, you can easily assess and record the risk rating before and after the work is performed, allowing you to identify any changes in risk and take necessary precautions.
  • Includes resources for use of legislative references: Our SWMS includes resources to assist with the use of legislative references, ensuring that you are meeting all necessary legal requirements.
  • Includes all PPE required: To ensure the safety of workers, our SWMS includes all necessary Personal Protective Equipment (PPE) required for the job.
  • Includes risk assessment and risk assessment matrix: Our SWMS includes a risk assessment and risk assessment matrix to help identify potential hazards and their level of risk.
  • Includes a checklist to ensure all requirements have been covered when implementing the SWMS: Our SWMS includes a checklist to ensure all necessary information has been covered when implementing the SWMS, ensuring that all safety requirements are met.
  • Includes sign-off page for all workers and responsible persons: To ensure accountability and compliance, our SWMS includes a sign-off page for all workers and responsible persons to acknowledge that they have read and understood the SWMS.
  • Easy to use, easy to customise: Our SWMS is designed to be user-friendly, making it easy to use and customise to your specific project requirements.
  • Suitable for large contracts and Tenders, including tier 1 contractual work: Our SWMS is suitable for use in large contracts and Tenders, including tier 1 contractual work.
  • Instantly delivered download: Our SWMS is available as an instantly downloadable file, allowing you to start using it right away.

At our company, we understand the importance of safety in the workplace, and that’s why we’ve created this SWMS to help make it easier for workers and companies to operate heavy machinery safely. With our SWMS, you can have peace of mind knowing that you have taken all necessary precautions to ensure the safety of yourself and those around you.

Here is some safety information related to using a log loader.

Hazards:

The following hazards may be encountered when operating a log loader:

  • Pinch points, crushing, and entanglement hazards from moving parts and hydraulic systems.
  • Fall hazards when climbing onto and working from elevated positions.
  • Collisions with other machinery, objects, or personnel in the work area.
  • Electrical hazards when working near overhead power lines.
  • Heat stress and dehydration due to prolonged exposure to hot and humid conditions.

Controls:

The following controls should be implemented to minimise the risks associated with operating a log loader:

  1. Training and Competency:

Only workers who are properly trained and competent in the safe operation of a log loader should be permitted to operate the equipment. The training should include:

  • Operating procedures for the specific make and model of the log loader.
  • Identification of hazards and appropriate controls.
  • Pre-start checks and maintenance procedures.
  • Use of personal protective equipment (PPE) such as hard hats, safety glasses, hearing protection, and high visibility clothing.
  1. Pre-start Checks:

Before starting the log loader, the operator should conduct the following checks:

  • Check all fluid levels and inspect the equipment for leaks, damage, and loose or missing parts.
  • Check the tires, tracks, or pads for damage or excessive wear.
  • Ensure all guards and safety devices are in place and functioning correctly.
  1. Work Area Preparation:

The work area should be prepared before starting the log loader. This includes:

  • Ensuring the area is clear of personnel, vehicles, and obstacles.
  • Identifying and marking any overhead power lines.
  • Ensuring the ground is stable and capable of supporting the weight of the log loader.
  • Ensuring there is adequate clearance for the boom to move freely without contacting any structures, objects or personnel.
  1. Operation:

During the operation of the log loader, the operator should:

  • Always wear the required PPE and use the seat belt.
  • Use the controls and attachments in accordance with the manufacturer’s instructions.
  • Maintain a safe distance from other machinery, objects, and personnel in the work area.
  • Never exceed the rated capacity of the log loader.
  • Never leave the equipment unattended while it is running.
  1. Shut Down:

At the end of the shift or when the log loader is no longer required, the operator should:

  • Park the equipment on level ground with the boom lowered and the bucket or grapple empty.
  • Apply the parking brake and place the transmission in neutral.
  • Turn off the engine and remove the key.
  • Conduct a visual inspection of the equipment to identify any damage or defects that require attention.

Conclusion:

This information provides a guideline for the safe operation of a log loader. It is the responsibility of the employer and the operator to ensure that all hazards have been identified, and appropriate controls have been implemented to minimise the risks associated with operating a log loader.

Gary’s Safety Tips

Hey everyone, it’s Gary here, and today I want to talk about something that’s incredibly important for those of you who work in the logging industry: log loaders. These machines can be incredibly useful for moving heavy logs and other materials around, but they can also be very dangerous if not operated properly. Today, I want to talk about some of the dangers associated with log loaders and provide you with some safety recommendations to help you stay safe on the job.

First and foremost, it’s important to understand that log loaders can be incredibly powerful machines. They are designed to move heavy loads quickly and efficiently, and as a result, they can cause serious injuries or even fatalities if they are not used properly. One of the biggest dangers associated with log loaders is the risk of being crushed or pinned by the machine. This can happen if you are standing too close to the machine while it is in operation or if you are not paying attention to what you are doing.

To avoid these dangers, it’s important to always stay a safe distance away from the machine while it is in operation. Make sure that you are standing at least a few feet away from the machine at all times, and never try to move logs or other materials that are too heavy for the machine to handle. Additionally, it’s important to make sure that the machine is always in good working order and that all safety features are functioning properly. This includes things like emergency shut-off switches, safety guards, and warning signals.

Another major danger associated with log loaders is the risk of falling from the machine. This can happen if you are not properly secured to the machine or if you are not paying attention to your surroundings. To avoid this danger, it’s important to always wear appropriate safety gear, such as a hard hat, safety glasses, and a safety harness. Additionally, it’s important to always be aware of your surroundings and to never take unnecessary risks.

One of the most important safety recommendations when it comes to log loaders is to always receive proper training before operating the machine. This includes both formal training and on-the-job training. You should always make sure that you are fully familiar with the machine’s controls and functions before operating it, and you should always be aware of the machine’s limitations and capabilities. Additionally, it’s important to never operate the machine under the influence of drugs or alcohol, as this can greatly increase the risk of accidents.

Finally, it’s important to always follow proper procedures when loading and unloading logs. This includes things like making sure that the machine is properly secured before loading or unloading, and making sure that the logs are properly stacked and balanced. Additionally, it’s important to never overload the machine or to try to move logs that are too heavy for the machine to handle.

In conclusion, log loaders can be incredibly useful machines for those of you who work in the logging industry, but they can also be very dangerous if not operated properly. To stay safe on the job, it’s important to always stay a safe distance away from the machine while it is in operation, to wear appropriate safety gear, to receive proper training, and to follow proper procedures when loading and unloading logs. Remember, your safety should always be your top priority, and by following these recommendations, you can greatly reduce your risk of accidents and injuries while working with log loaders. Stay safe out there, and thanks for watching!

Regards,

Log Loader Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Log Loader Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket