Call 1300 877 609 to find out about the latest offers available.

Foundry Work Safe Work Method Statement

SKU:SWMAU3811

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Foundry Work Safe Work Method Statement

Introducing our Safe Work Method Statement (SWMS) for foundry work – a comprehensive and pre-filled document that provides detailed guidelines to help ensure safety and minimise risks in foundry work.

Here are the key features of our SWMS for foundry work:

• Pre-filled and Comprehensive: Our SWMS comes pre-filled with all the necessary information and guidelines for foundry work. It covers all aspects of the job to help ensure safety, and is designed to help you comply with legal requirements.

• Fully Editable and Customisable: Our SWMS comes in Microsoft Word format, making it easy to edit and customise to suit your specific needs. You can add or remove information as necessary, ensuring that the document is tailored to your particular project.

• Includes Scope of Project and Project Details: Our SWMS includes a detailed scope of the project and project details to ensure that all requirements are met and the project runs smoothly.

• Includes Checklist of High-Risk Machinery: Our SWMS includes a checklist of any high-risk machinery that may be on-site, helping to identify potential hazards and minimise risks.

• Includes Space for Recording Staff Training: Our SWMS includes a section for recording staff training, ensuring that all workers are trained in the necessary safety procedures.

• Includes Before and After Risk Ratings: Our SWMS includes before and after risk ratings, helping to assess the effectiveness of the safety measures in place.

• Includes Legislative References: Our SWMS includes resources for use of legislative references, helping to ensure compliance with relevant regulations.

• Includes All PPE Required: Our SWMS includes a comprehensive list of all Personal Protective Equipment (PPE) required for the job, ensuring that workers are adequately protected.

• Includes Risk Assessment and Risk Assessment Matrix: Our SWMS includes a risk assessment and risk assessment matrix, helping to identify potential hazards and assess the level of risk.

• Includes Checklist for SWMS Implementation: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS, helping to minimise risks and ensure safety.

• Includes Sign-off Page for Workers and Responsible Persons: Our SWMS includes a sign-off page for all workers and responsible persons, helping to ensure that everyone is aware of the safety procedures in place.

• Easy to Use, Easy to Customise: Our SWMS is designed to be user-friendly and easy to customise, making it easy for you to tailor the document to your specific needs.

• Suitable for Large Contracts and Tenders: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work, ensuring that safety is a top priority in all projects.

• Instantly Delivered Download: Our SWMS is available for instant download, making it easy to get started right away.

We understand the importance of safety in foundry work, and our SWMS is designed to help minimise risks and ensure safety on the job. So why wait? Download our SWMS today and start working safely!

Here is some safety information related to formwork.

Hazards and Risks: Some of the hazards and risks associated with foundry work include:

  • Burns from hot metal and molten metal
  • Eye injuries from flying debris and sparks
  • Hearing damage from noise exposure
  • Musculoskeletal injuries from lifting heavy objects
  • Respiratory problems from exposure to dust and fumes
  • Chemical burns from exposure to hazardous chemicals

Control Measures: The following control measures should be implemented to minimize the risks associated with foundry work:

  1. Personal Protective Equipment (PPE): All workers should wear appropriate PPE, including:
  • Heat-resistant clothing and gloves
  • Hard hats
  • Safety glasses or face shields
  • Respirators or dust masks
  1. Safe Lifting Techniques: Workers should be trained in safe lifting techniques to prevent musculoskeletal injuries. They should use lifting equipment such as cranes and forklifts to move heavy objects.
  2. Hot Work Permits: A hot work permit should be obtained before any welding or cutting work is done in the foundry.
  3. Fire Prevention: The foundry should have adequate fire prevention measures, including:
  • Fire extinguishers
  • Smoke detectors
  • Fire alarms
  • Clear access to emergency exits
  1. Chemical Safety: Workers should be trained in the safe handling of hazardous chemicals. They should wear appropriate PPE and follow the instructions on the labels of the chemicals.
  2. Noise Control: The foundry should implement measures to control noise levels, such as:
  • Use of noise-reducing earplugs or earmuffs
  • Enclosing noisy machinery in soundproof enclosures
  • Scheduling noisy work during off-hours
  1. Ventilation: The foundry should have adequate ventilation to prevent exposure to dust and fumes.
  2. Machine Safety: All machinery in the foundry should be regularly maintained and inspected for safety hazards. Workers should receive training on the safe operation of machinery.

Emergency Procedures: In the event of an emergency, the following procedures should be followed:

  • Call for medical assistance if needed
  • Evacuate the area immediately
  • Sound the fire alarm
  • Use fire extinguishers to control small fires
  • Follow emergency exit signs and procedures

Gary’s Safety Tips

Hey there, my friends. Today, I want to talk about something that is very important for all of us who work in the industrial field – foundry work. Now, foundry work can be a dangerous business, but it doesn’t have to be. By taking the proper safety precautions, we can all work safely and efficiently in the foundry.

First, let’s talk about some of the dangers of foundry work. One of the biggest dangers is the risk of burns. Molten metal can reach temperatures of over 2,000 degrees Fahrenheit, which can cause severe burns. In addition, foundry workers are also at risk of inhaling harmful fumes and dust, which can lead to respiratory problems.

Another danger of foundry work is the risk of injuries from heavy equipment and machinery. Moving machinery, sharp edges, and heavy loads can all pose a risk to workers if proper precautions are not taken. And finally, foundry work can also be hazardous due to the noise levels. Exposure to high levels of noise over a prolonged period can lead to hearing loss and other health problems.

So, what can we do to protect ourselves from these dangers? First and foremost, we need to make sure that we are wearing the proper personal protective equipment (PPE). This includes heat-resistant gloves, safety glasses, and face shields to protect against burns and flying debris. We should also wear respirators to protect our lungs from harmful fumes and dust.

In addition, we need to be trained on how to properly operate and maintain machinery and equipment. We should always follow proper lockout/tagout procedures to prevent accidents while working on machines, and we should never attempt to operate machinery without proper training and authorisation.

Another important safety measure is to keep our work areas clean and organised. Cluttered work areas can lead to accidents and injuries, so it’s important to keep our tools and materials organised and put away when not in use.

And finally, we need to be aware of the potential hazards around us and take action to mitigate them. For example, we can use noise-cancelling earplugs to protect our hearing, or we can use machine guards and barriers to prevent accidental contact with moving machinery.

In conclusion, foundry work can be dangerous, but by taking the proper safety precautions, we can all work safely and efficiently. Remember to wear the proper PPE, be trained on machinery and equipment, keep our work areas clean and organised, and be aware of the potential hazards around us. By doing so, we can all stay safe and healthy while working in the foundry. Stay safe out there, my friends!

Cheers,

Foundry Work Safe Work Method Statement

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket