Call 1300 877 609 to find out about the latest offers available.

Floor Polisher Safe Work Method Statement

SKU:SWMAU597

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Floor Polisher Safe Work Method Statement

Introducing our Safe Work Method Statement (SWMS) for working with a floor polisher – your comprehensive guide to ensure safety on your project site. Our SWMS is designed to help you and your team understand the risks involved with operating a floor polisher and to implement safety measures to reduce these risks.

Here are the key features of our SWMS:

Pre-filled and Comprehensive: Our SWMS is pre-filled with relevant information specific to working with a floor polisher, making it comprehensive and easy to use. It covers all the essential details required to ensure your team is well-prepared and informed about the risks involved in using a floor polisher.

Fully Editable and Customisable: Our SWMS comes in Microsoft Word format, making it easy for you to edit and customise according to your specific needs. You can add or remove information as required, ensuring that the SWMS is tailored to the specific requirements of your project.

Includes Scope and Project Details: Our SWMS includes the scope of the project and specific project details to help you and your team understand the requirements of the job. This information is crucial for ensuring that all safety measures are followed and risks are mitigated.

Includes Checklist for High-Risk Machinery: Our SWMS includes a checklist of any high-risk machinery on the site. This ensures that your team is well-prepared and equipped to handle the machinery safely, reducing the risks involved in operating it.

Includes Space for Recording Staff Training: Our SWMS includes space for recording staff training to ensure that everyone on the team is fully trained and equipped to handle the machinery safely.

Includes Before and After Risk Ratings: Our SWMS includes before and after risk ratings to help you track the effectiveness of the safety measures implemented during the project.

Includes Legislative References: Our SWMS includes resources for use of legislative references, ensuring that your team is up-to-date with the latest safety regulations and standards.

Includes All PPE Required: Our SWMS includes all PPE required to ensure that your team is well-protected while operating the floor polisher.

Includes Risk Assessment and Risk Assessment Matrix: Our SWMS includes a risk assessment and risk assessment matrix to help you identify and mitigate risks involved in using the floor polisher.

Includes Checklist to Ensure All Requirements Are Covered: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS. This helps to ensure that your team is fully prepared and informed about the safety measures required.

Includes Sign-Off Page: Our SWMS includes a sign-off page for all workers and responsible persons, ensuring that everyone on the team is aware of the safety measures in place and has agreed to follow them.

Easy to Use and Customise: Our SWMS is designed to be easy to use and customise, ensuring that you and your team can implement safety measures quickly and effectively.

Suitable for Large Contracts and Tenders: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work. It provides all the necessary information required for a successful and safe project.

Instantly Delivered Download: Our SWMS is available for instant download, ensuring that you and your team can access it quickly and easily.

We hope that our SWMS for working with a floor polisher will be a valuable resource for your project. By following the safety measures outlined in the SWMS, you can help to reduce the risks involved in operating a floor polisher and ensure the safety of your team.

Here is some safety information related to working with a floor polisher.

Hazard Identification:

  • Electrocution hazard due to the use of electrical power tools.
  • Tripping and slipping hazards due to cords and cables, debris, and wet surfaces.
  • Manual handling hazards due to the weight and size of the floor polisher.
  • Noise hazard due to the loud noise generated by the floor polisher.

Control Measures:

  1. Preparation and Inspection:
  • Inspect the floor polisher before use to ensure it is in good working order and all safety features are intact.
  • Check the power cord and ensure it is in good condition.
  • Ensure the area is free from debris, liquids, and other hazards that may cause slips or trips.
  • Wear appropriate personal protective equipment (PPE) such as eye protection, hearing protection, gloves, and safety boots.
  1. Operational Safety Measures:
  • Always switch off and unplug the floor polisher before carrying out any maintenance or cleaning.
  • Follow the manufacturer’s instructions for starting and stopping the machine.
  • Ensure the power cord is kept away from the work area and does not present a tripping hazard.
  • Keep the machine moving and do not leave it stationary in one area for too long to prevent uneven polishing.
  • Always maintain a firm grip on the machine handles and avoid leaning over the machine.
  • Use caution when turning the machine around corners or when working in confined spaces.
  • Do not operate the machine on surfaces that are wet or slippery.
  • If using a chemical solution, follow the manufacturer’s instructions for dilution and use.
  • Do not use the machine if you are feeling fatigued or unwell.
  1. Emergency Procedures:
  • In case of an emergency, switch off the machine and unplug it immediately.
  • If a person is injured, administer first aid and seek medical attention if required.
  • Report any incidents or hazards to your supervisor.
  1. Housekeeping:
  • Keep the work area clean and free from debris.
  • Ensure the floor polisher is stored in a secure location after use.
  • Ensure the power cord is coiled neatly and stored away.

Training and Supervision:

  • All personnel using the floor polisher must be trained and competent in its use.
  • Supervisors must ensure that all employees are aware of the potential hazards associated with the use of the floor polisher and the control measures to be taken to prevent injuries.

Gary’s Safety Tips

G’day everybody, Gary here, and today I want to talk about something that may not seem like the most exciting topic, but it’s a critical one. I’m talking about the dangers of working with a floor polisher and the safety recommendations that you need to follow to protect yourself and others.

First things first, let’s talk about the dangers. There are several risks involved with using a floor polisher, and if you’re not careful, you could end up seriously injuring yourself or someone else. One of the most significant dangers is the rotating brush or pad on the bottom of the polisher. If you’re not careful, it can easily catch loose clothing or hair and pull you into the machine.

Another danger is the risk of electrocution. If the polisher comes into contact with water or another liquid, it can cause a short circuit and put you in harm’s way. Additionally, the cord itself can be a tripping hazard, so it’s essential to keep it out of the way as much as possible.

So, now that we’ve gone over the risks let’s talk about some safety recommendations that you need to follow to keep yourself and others safe. First and foremost, make sure that you’re wearing the appropriate safety gear. This includes safety glasses, gloves, and non-slip shoes. Additionally, it’s important to wear clothes that fit well and won’t get caught in the rotating brush or pad.

Next, make sure that you’re using the polisher in a well-ventilated area. Floor polishers can kick up a lot of dust and debris, which can be harmful if you breathe it in. If you’re working in an enclosed space, make sure to open windows or use a fan to keep the air circulating.

Another safety recommendation is to make sure that the area you’re working in is clear of any obstacles. This includes moving furniture, rugs, and other objects that could get in your way while you’re operating the polisher. You also want to make sure that there are no electrical cords or other tripping hazards in the area.

When you’re ready to start using the polisher, make sure to read the manufacturer’s instructions carefully. This will give you a better understanding of how to operate the machine safely and effectively. If you have any questions or concerns, don’t hesitate to reach out to the manufacturer or a professional for guidance.

Finally, it’s essential to maintain the polisher properly to keep it in good working condition. This includes cleaning it regularly and checking it for any signs of wear and tear. If you notice any issues with the polisher, such as frayed cords or broken parts, stop using it immediately and have it serviced by a professional.

In conclusion, working with a floor polisher can be dangerous if you’re not careful, but by following these safety recommendations, you can minimize the risks and keep yourself and others safe. Remember, safety should always be your top priority when working with any kind of machinery or equipment. So stay safe out there, and I’ll catch you on the flip side.

Cheers,

Floor Polisher Safe Work Method Statement

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket