Call 1300 877 609 to find out about the latest offers available.

Edge Bander Safe Work Method Statement

SKU:SWMAU208

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Edge Bander Safe Work Method Statement

Introducing our Edge Bander Safe Work Method Statement (SWMS), designed to provide a comprehensive, easy-to-use solution for managing risks on your job site. We understand that safety is a top priority, which is why we’ve created this pre-filled and editable SWMS in Microsoft Word format, making it simple to customise to suit your specific requirements.

Key Features:

  • Pre-filled and Comprehensive: Our SWMS comes with pre-filled details, including the scope of the project and all the necessary project details, so you can be confident that all relevant information is included.
  • Fully Editable and Customisable: You can easily edit and customise our SWMS to suit your specific needs using Microsoft Word, making it a breeze to adapt to different job sites or projects.
  • Includes High-Risk Machinery Checklist: We’ve included a checklist of high-risk machinery commonly used when working with an edge bander, ensuring that you’ve considered all the potential risks associated with the equipment on your site.
  • Staff Training Recording Space: Our SWMS includes space for recording any staff training, ensuring that all employees are properly trained and equipped to work safely.
  • Before and After Risk Ratings: Our SWMS includes before and after risk ratings, so you can track the effectiveness of your safety measures and adjust as necessary.
  • Resources for Legislative References: We’ve provided legislative references that you can use to ensure that your SWMS is fully compliant with relevant safety regulations and guidelines.
  • Includes All Required PPE: Our SWMS includes all the necessary Personal Protective Equipment (PPE) required when working with an edge bander, ensuring that workers are protected from any potential hazards.
  • Risk Assessment and Risk Assessment Matrix: Our SWMS includes a risk assessment and risk assessment matrix, enabling you to identify potential hazards and determine appropriate control measures.
  • Checklist for SWMS Implementation: Our SWMS includes a checklist to ensure that all necessary requirements have been covered when implementing the SWMS, leaving nothing to chance.
  • Sign-Off Page: Our SWMS includes a sign-off page for all workers and responsible persons, ensuring that everyone on your job site is aware of the safety measures in place and has agreed to follow them.
  • Suitable for Large Contracts and Tenders: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work, providing a reliable and effective solution for managing safety risks on complex job sites.
  • Instant Download: Our SWMS is available for instant download, so you can get started on managing safety risks right away.

Our SWMS is not a sure guarantee or solution, but it is a valuable tool that can help you manage safety risks on your job site. It is easy to use and customisable, and it covers all the necessary details that you need to keep your workers safe. We believe that safety should always come first, and our SWMS is designed to help you achieve that goal.

Here is some safety information related to working with edge bander.

Hazard Identification:

  • Risk of contact with moving parts of the machine.
  • Risk of entanglement with the machine.
  • Risk of electrical shock due to contact with live parts of the machine.
  • Risk of fire due to the presence of flammable substances.
  • Risk of eye injury due to flying debris.
  • Risk of cuts due to contact with the cutting tools.
  • Risk of slips, trips, and falls due to poor housekeeping.

Risk Assessment:

  • All operators and persons in the vicinity of the machine must be properly trained and have the necessary skills and experience to operate the machine safely.
  • Appropriate personal protective equipment (PPE) must be worn at all times, including eye protection, hearing protection, gloves, and safety footwear.
  • The machine must be regularly maintained and serviced to ensure that all moving parts are in good working order.
  • The machine must be operated in a well-ventilated area, away from sources of ignition, and any flammable materials must be stored in a safe manner.
  • The area around the machine must be kept clean and tidy, and any spillages or debris must be cleared up immediately.
  • The machine must be isolated from the power source before any maintenance or repairs are carried out.

Control Measures:

  • All operators and persons in the vicinity of the machine must be trained and competent in the safe operation of the machine.
  • Appropriate PPE must be worn at all times.
  • The machine must be regularly maintained and serviced to ensure that all moving parts are in good working order.
  • The machine must be operated in a well-ventilated area, away from sources of ignition, and any flammable materials must be stored in a safe manner.
  • The area around the machine must be kept clean and tidy, and any spillages or debris must be cleared up immediately.
  • The machine must be isolated from the power source before any maintenance or repairs are carried out.
  • A lockout/tagout system must be implemented to prevent the machine from being operated while maintenance or repairs are being carried out.

Emergency Procedures:

  • In the event of an emergency, all operators and persons in the vicinity of the machine must be familiar with the location and operation of emergency stops and other emergency equipment.
  • First aid equipment must be readily available and all operators must be trained in basic first aid procedures.
  • In the event of a fire, the machine must be immediately switched off and the fire department contacted.
  • In the event of an electrical shock, the power source must be immediately isolated and medical attention sought.

Gary’s Safety Tips

What’s up everyone, it’s your safety guy, Gary, and today we’re going to talk about a topic that hits close to home for me – the dangers and safety recommendations on working with an edge bander.

Now, for those of you who don’t know, an edge bander is a machine used to apply edging strips to the edges of materials like wood, plastic or particle board. It’s a very useful tool in the world of manufacturing and woodworking, but it’s also one of the most dangerous machines in the workshop.

First of all, let’s talk about the dangers of an edge bander. The most obvious danger is the rotating blade that trims the excess edge banding material. This blade can cause serious injury if it comes into contact with your body. It’s important to keep your hands and fingers away from the blade at all times, and to use push sticks or other tools to feed the material through the machine.

Another danger is the heating element used to activate the glue on the edge banding material. This element can get extremely hot, and if it comes into contact with your skin, it can cause serious burns. It’s important to make sure that the heating element is properly shielded and that you are wearing appropriate protective gear, such as gloves and long sleeves.

In addition to these obvious dangers, there are also other risks associated with working with an edge bander. For example, the machine can produce a lot of dust and debris, which can be harmful to your lungs if you breathe it in. It’s important to wear a respirator or dust mask when using the machine to protect yourself.

So, now that we’ve covered the dangers, let’s talk about some safety recommendations for working with an edge bander. First and foremost, it’s important to make sure that the machine is properly maintained and in good working order. This means checking the blade for sharpness, ensuring that the heating element is functioning properly, and checking for any loose or worn parts.

It’s also important to follow the manufacturer’s instructions for operating the machine. This means using the correct feed rate, keeping your hands and fingers away from the blade, and using appropriate tools to feed the material through the machine.

Another important safety recommendation is to always wear appropriate protective gear. This includes gloves, long sleeves, eye protection, and a respirator or dust mask.

Finally, it’s important to be aware of your surroundings and to make sure that there are no distractions or hazards in the area when using the machine. This means keeping the work area clean and free of clutter, and making sure that there are no people or pets nearby who could be injured.

In conclusion, an edge bander is a useful tool in the world of manufacturing and woodworking, but it’s also one of the most dangerous machines in the workshop. It’s important to be aware of the dangers associated with working with an edge bander, and to take appropriate safety precautions to protect yourself. By following these safety recommendations, you can use an edge bander safely and effectively, and avoid injury or harm. Stay safe out there, my friends!

Cheers,

Edge Bander Safe Work Method Statement

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket