Call 1300 877 609 to find out about the latest offers available.

Site Inspection Safe Work Method Statement (SWMS)

SKU:SWMS47098

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile

Download a Sample SWMS

Site Inspection Safe Work Method Statement (SWMS)

Safe Work Method Statement Template for Site Inspection of Demolition Contractors

  • Pre-filled and Comprehensive: This template comes pre-filled with essential information but also allows for easy customization to suit your specific project needs. It provides a comprehensive framework for creating a detailed site inspection plan.
  • Fully editable and customisable in Microsoft Word format: Easily edit and customize the template using Microsoft Word, ensuring convenience and flexibility in adapting it to your requirements. Modify sections, add or remove content as needed.
  • Includes scope of the project and project details: Clearly document the scope of the demolition project and outline all relevant project details, such as location, duration, and any other important information.
  • Checklist of any high-risk machinery on-site: Identify and assess all high-risk machinery present on the site to ensure proper safety measures are implemented and followed.
  • Space for recording staff training: Keep track of staff training by recording relevant details such as training dates, type of training, and certifications received. This helps ensure that all personnel possess the necessary skills and knowledge to work safely on-site.
  • Before and after risk ratings: Evaluate the level of risk associated with specific tasks and activities before they are carried out, and then reassess the risk levels after implementation of appropriate control measures. This allows for monitoring and improvement of safety practices.
  • Resources for use of legislative references: Find helpful resources within the template that can assist with understanding and applying relevant legislation and standards applicable to the demolition industry.
  • All PPE required: Identify and list all personal protective equipment (PPE) necessary for workers on the site. This ensures that all individuals are equipped with the right gear to protect themselves from potential hazards.
  • Risk assessment and risk assessment matrix: Conduct a comprehensive risk assessment using the provided matrix, which allows for a systematic evaluation of hazards and risks associated with different tasks and activities. This helps in devising appropriate control measures.
  • Checklist to ensure all requirements have been covered: Utilize the checklist provided within the template to ensure that all necessary aspects have been considered and addressed when implementing the Safe Work Method Statement (SWMS). Avoid overlooking any crucial safety measures.
  • Sign-off page for all workers and responsible persons: Keep a record of acknowledgment and agreement by personnel involved in the project. The sign-off page ensures that everyone understands their responsibilities and agrees to comply with the documented safety procedures.
  • Easy to use, easy to customize: The user-friendly format of the template allows for easy navigation and editing. Follow the clear instructions and easily tailor the document to suit your specific demolition site inspection requirements.
  • Suitable for large contracts and tenders, including tier 1 contractual work: This template is designed to meet the rigorous safety standards required for larger contracts and tenders, including tier 1 contractual work. It provides a professional and compliant approach to site inspections.
  • Instantly delivered download: Upon purchase, you will receive an instant download of the template, enabling immediate access for use in your project preparations.

Risks Associated with Site Inspection of Demolition ContractorsWhen conducting site inspections of demolition contractors, several risks need to be considered due to the nature of the work involved. These risks include:

1. Hazardous Substances and Materials:

During demolition activities, there is a risk of exposure to hazardous substances such as asbestos, lead, and other toxic chemicals. Inhalation or contact with these substances can lead to serious health issues.

2. Structural Instability:

Demolition sites often have weakened structures that may collapse unexpectedly. This poses a significant risk to workers if proper precautions are not taken to assess the structural stability of the site.

3. Falling Objects and Debris:

During demolition, objects and debris can fall from overhead, posing a danger to workers on the ground. This risk can be exacerbated if proper signage, barriers, or protective equipment are not in place.

4. Noise and Vibration:

Demolition work generates high levels of noise and vibrations, which can have long-term effects on workers’ hearing and overall health. Prolonged exposure without appropriate personal protective equipment (PPE) can lead to hearing loss and other issues.

5. Machinery and Equipment:

The use of heavy machinery and equipment, such as excavators and cranes, introduces hazards related to their operation and maintenance. Workers must be trained and competent in using this machinery to avoid accidents or injuries.

6. Electrocution:

Demolition sites often have exposed electrical wiring or equipment that can pose a risk of electrocution for workers, especially if they come into contact with live wires or faulty electrical systems.

Safe Work Method Statement for Site Inspection

A Safe Work Method Statement (SWMS) is a document that outlines the steps and procedures to mitigate risks associated with specific work activities. Developing a SWMS for site inspection of demolition contractors can help reduce the aforementioned risks by:

1. Identifying Hazards:

The SWMS requires a thorough assessment of potential hazards, such as hazardous substances, structural instability, falling objects, noise, machinery, and electrical hazards. This enables proactive identification of risks before commencing any site work.

2. Implementing Control Measures:

Based on the identified hazards, the SWMS provides clear guidelines for implementing control measures to minimize the risks. This may include using PPE, conducting pre-demolition structural assessments, securing debris and objects, and establishing exclusion zones.

3. Training and Competence:

The SWMS emphasizes the need for workers to be adequately trained and competent in their tasks, especially when operating heavy machinery. It ensures that only qualified personnel are involved in critical demolition processes, reducing the risk of accidents.

4. Communication and Consultation:

The SWMS promotes effective communication and consultation between all stakeholders involved in the demolition project, including contractors, workers, health and safety representatives, and site supervisors. This facilitates the exchange of information regarding hazards and control measures.

5. Regular Review and Updates:

The SWMS should be regularly reviewed and updated to ensure its effectiveness. As the demolition project progresses and new risks emerge, the SWMS can be revised to reflect the evolving nature of the site and implement additional control measures if necessary.

By following a comprehensive SWMS for site inspection of demolition contractors, the risks associated with demolition work can be effectively identified, managed, and minimized. This ensures a safer work environment for all personnel involved in the project.

Gary’s Safety Tips

Today I’m going to share with you some valuable tips for creating a Site Inspection Safe Work Method Statement (SWMS) that will help ensure the safety of everyone involved in the worksite. Now, as a mature Health and Safety Officer, it’s crucial for us to prioritize the well-being of our fellow colleagues.

Tip 1: Understand the Nature of the Task

The first step in creating an effective SWMS is to thoroughly understand the nature of the task at hand. Take the time to carefully analyze all the potential hazards that could arise during the site inspection. This involves reviewing any relevant legislation, conducting risk assessments, and speaking with experienced workers who have previously undertaken similar inspections.

Tip 2: Identify Hazards and Control Measures

Once you’ve identified the potential hazards, it’s important to determine appropriate control measures to minimize or eliminate these risks. This may include implementing personal protective equipment (PPE), establishing exclusion zones, providing proper signage, and ensuring all workers are adequately trained on safety procedures related to the site inspection.

Tip 3: Involve All Stakeholders

Including all stakeholders in the development of the SWMS is essential for its successful implementation. Consult with workers, supervisors, contractors, and any other relevant parties to gain their insights and perspectives on potential hazards and suitable control measures. Collaboration ensures everyone has a clear understanding of their responsibilities and fosters a safer working environment.

Tip 4: Keep It Simple and Clear

A SWMS should be concise, simple, and easy to understand by all workers involved. Avoid using complex jargon that may confuse or overwhelm those reading it. Stick to clear and straightforward language, outlining the hazards, control measures, and emergency procedures in a logical sequence. Remember, simplicity is key when it comes to communication.

Tip 5: Regularly Review and Update

A SWMS should never be a one-time document. It should be reviewed and updated regularly to reflect any changes in the worksite or work processes. As the Health and Safety Officer, it’s your responsibility to ensure that the SWMS is accurate and up-to-date. Keep an open line of communication with all workers and encourage them to provide feedback or report any new hazards they notice.

Tip 6: Train Workers on the SWMS

No matter how well-written your SWMS is, it won’t be effective unless all workers are trained on its contents. Conduct regular training sessions to familiarize workers with the SWMS, ensuring they understand the potential risks and how to mitigate them. Encourage open dialogue during these sessions, allowing workers to ask questions or share their own insights related to site inspection safety.

Tip 7: Monitor and Evaluate

The final tip for creating an effective SWMS is to consistently monitor and evaluate its implementation. Regularly inspect the worksite to ensure that control measures are being followed and that workers are adhering to the SWMS guidelines. By actively monitoring and evaluating the SWMS, you can identify any areas in need of improvement and take appropriate corrective actions.

Final Thoughts

Remember, safety should always be our top priority in any work environment. By following these tips and creating a comprehensive Site Inspection Safe Work Method Statement, you’ll be taking a significant step in ensuring the well-being of everyone involved. Stay committed to continuous improvement and foster a safety culture that values open communication, collaboration, and proactive risk management.

Site Inspection Safe Work Method Statement (SWMS)

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Site Inspection Safe Work Method Statement (SWMS)

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket

Verified by MonsterInsights