Call 1300 877 609 to find out about the latest offers available.

Curving Rolls Powered Safe Work Method Statement

SKU:SWMAU9451

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Curving Rolls Powered Safe Work Method Statement

Welcome to our Curving Rolls Powered Safe Work Method Statement (SWMS). This SWMS has been designed to assist you and your team in safely carrying out tasks associated with powered curving rolls. We understand the importance of workplace safety and this SWMS is here to help ensure that all necessary precautions are taken before starting any work.

Key Features:

  • Pre-filled and Comprehensive: Our SWMS is pre-filled with all the necessary details and is comprehensive in its coverage of safety measures related to working with powered curving rolls.
  • Fully editable and customisable in Microsoft Word format for easy editing: We understand that every workplace is different, which is why our SWMS is fully editable and customisable to suit your specific needs.
  • Includes the scope of the project and the project details: Our SWMS includes a clear scope of the project and all the necessary details associated with it, to help you understand the requirements of the job.
  • Includes a checklist of any high-risk machinery on-site: Our SWMS includes a checklist of all the high-risk machinery on-site to ensure that proper safety measures are taken when working with them.
  • Includes space for recording any staff training: Our SWMS provides space for recording any staff training related to the use of powered curving rolls.
  • Includes before and after risk ratings: Our SWMS includes before and after risk ratings to help you assess the effectiveness of the safety measures taken.
  • Includes resources for use of legislative references: Our SWMS includes resources for the use of legislative references to help you understand the legal requirements related to working with powered curving rolls.
  • Includes all PPE required: Our SWMS includes a list of all the necessary personal protective equipment required when working with powered curving rolls.
  • Includes risk assessment and risk assessment matrix: Our SWMS includes a risk assessment and a risk assessment matrix to help you identify potential risks associated with the task.
  • Includes a checklist to ensure all requirements have been covered when implementing the SWMS: Our SWMS includes a checklist to ensure that all the necessary safety measures have been covered when implementing the SWMS.
  • Includes sign-off page for all workers and responsible persons: Our SWMS includes a sign-off page for all workers and responsible persons to ensure that everyone is aware of the safety measures and has agreed to follow them.
  • Easy to use, easy to customise: Our SWMS is designed to be easy to use and easy to customize to suit your specific needs.
  • Suitable for large contracts and tenders, including tier 1 contractual work: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work.
  • Instantly delivered download: Our SWMS is available for instant download, allowing you to get started on your project as soon as possible.

We believe that safety should always come first, and our SWMS is designed to help you achieve that goal. By providing a comprehensive safety plan, we hope to make your job easier and safer. Please note that while we have taken every effort to provide a comprehensive safety plan, we cannot guarantee safety in all situations. It is important that you assess the risks and take appropriate safety measures before starting any work.

Here is some safety information related to working with powered curving rolls.

Hazards:

The use of curving rolls can present various hazards to workers. These include, but are not limited to:

  • Crush injuries from the moving parts of the machine
  • Hand injuries when feeding material into the machine
  • Slips, trips, and falls from working at height or on slippery surfaces
  • Eye injuries from flying debris
  • Hearing damage from prolonged exposure to noise
  • Strains and sprains from awkward postures and repetitive movements

Risk Assessment:

Before commencing work with curving rolls, a risk assessment should be conducted to identify potential hazards and determine appropriate control measures. The risk assessment should take into consideration:

  • The nature of the task
  • The experience and training of the workers
  • The condition and maintenance of the curving rolls
  • The condition and suitability of the material to be worked on
  • The work environment, including the presence of slip hazards, uneven surfaces, and overhead obstacles
  • The availability and suitability of PPE
  • The potential for other hazards, such as electrical or fire hazards

Control Measures:

To minimize the risk of injury when using curving rolls, the following control measures should be implemented:

  • All workers operating the machine must be trained and competent in its use.
  • Adequate PPE must be worn by all workers, including safety glasses, gloves, and hearing protection.
  • The work area must be kept clean and free from clutter to minimize the risk of slips, trips, and falls.
  • Workers must take care when feeding material into the machine to avoid hand injuries.
  • The machine must be regularly inspected and maintained to ensure it is in good working condition.
  • A designated area should be established for the storage of material and tools, away from the work area.
  • Workers must be aware of the location of emergency stops and switches, and how to use them in case of an emergency.
  • Only authorised personnel are allowed in the work area.
  • A safe distance must be maintained between workers and the machine when it is in operation.

Procedure:

The following steps should be followed when using curving rolls:

  1. Conduct a pre-start inspection of the machine to ensure it is in good working condition.
  2. Ensure that the work area is clean and free from clutter.
  3. Put on all required PPE, including safety glasses, gloves, and hearing protection.
  4. Position the material to be worked on in front of the machine, taking care to avoid any trip hazards.
  5. Turn on the machine and adjust the settings according to the material being worked on.
  6. Feed the material into the machine slowly and steadily, taking care to avoid hand injuries.
  7. Continue feeding the material into the machine until the desired shape is achieved.
  8. Turn off the machine and remove the finished material from the machine.
  9. Conduct a post-task inspection of the machine to ensure it is in good working condition.
  10. Clean up the work area and return all tools and material to their designated storage area.

Emergency Procedures:

In the event of an emergency, the following procedures should be followed:

  • If someone is injured, stop the machine immediately and provide first aid as necessary.
  • If there is a fire
  • If there is a fire, evacuate the area immediately and call the fire department.
  • If there is a risk of electric shock, turn off the power supply to the machine and call a qualified electrician.
  • If the machine malfunctions or there is a safety concern, activate the emergency stop switch and report the issue to a supervisor or manager.

Gary’s Safety Tips

Hello everyone! Today, I want to talk about a serious topic that’s often overlooked in many industrial workplaces – working with powered curving rolls. These machines can be incredibly useful for shaping and forming metal sheets, but they can also be extremely dangerous if proper safety measures aren’t taken. So, let’s dive into some of the dangers of working with powered curving rolls and some safety recommendations that you should follow to protect yourself and your coworkers.

First and foremost, the most obvious danger when working with powered curving rolls is the risk of physical injury. These machines are powerful and can easily crush or sever body parts if not used properly. Additionally, the sheet metal being worked on can easily become jammed in the rolls, causing the machine to malfunction and potentially injuring workers nearby. To avoid these types of accidents, it’s essential to follow all safety procedures and regulations when operating and maintaining the machine.

One of the most important safety recommendations is to always wear the appropriate personal protective equipment (PPE). This includes things like safety glasses, steel-toed boots, and gloves. If you’re working with particularly heavy or sharp sheet metal, you may also need to wear additional PPE like a helmet or full-body suit. Remember, PPE won’t completely eliminate the risk of injury, but it can greatly reduce the severity of any accidents that do occur.

Another key safety recommendation is to make sure that the machine is properly maintained and inspected regularly. This means checking for any signs of wear or damage on the machine’s moving parts, such as the rollers and bearings. If you notice any issues, be sure to report them to your supervisor right away and do not attempt to operate the machine until the issue has been resolved.

It’s also essential to ensure that the machine is properly guarded. This means that there should be physical barriers around the machine’s moving parts to prevent workers from accidentally coming into contact with them. Additionally, there should be emergency stops and other safety features in place that can quickly shut down the machine if something goes wrong. Make sure that you understand how these features work and how to use them in case of an emergency.

Finally, it’s crucial to receive proper training before operating powered curving rolls. This includes both initial training and ongoing refresher courses. Training should cover things like proper machine operation, maintenance procedures, and emergency protocols. If you’re unsure about anything related to the machine, don’t hesitate to ask your supervisor or a more experienced coworker for help.

So, those are some of the dangers of working with powered curving rolls and some safety recommendations that you should follow to stay safe on the job. Remember, accidents can happen even when all precautions are taken, so it’s important to always be aware of your surroundings and be prepared to react quickly in case of an emergency.

Now, I know that talking about safety procedures and regulations isn’t the most exciting topic, but it’s essential to keep ourselves and our coworkers safe on the job. As entrepreneurs and workers, we have to remember that our most valuable asset is ourselves, and we need to do everything we can to protect that asset.

That’s it for today’s episode. Stay safe out there, and as always, hustle hard and crush it!

Cheers,

Curving Rolls Powered Safe Work Method Statement

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket