Call 1300 877 609 to find out about the latest offers available.

CNC Machining Centre Safe Work Method Statement (SWMS)

SKU:

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

CNC Machining Centre Safe Work Method Statement (SWMS)

Looking for a comprehensive CNC Machining Centre Safe Work Method Statement (SWMS)? Look no further! Our SWMS is designed to assist you in completing your project safely and efficiently.

Key features of our SWMS include:

  • Pre-filled and Comprehensive: Our SWMS comes pre-filled with relevant information and is designed to cover all aspects of working with a CNC machining centre. It is a comprehensive guide that will help you identify and manage risks associated with the project.
  • Fully editable and customisable: Our SWMS is provided in Microsoft Word format, making it easy to customise and edit to suit your specific needs. You can add or remove information as necessary to ensure the SWMS accurately reflects your project’s requirements.
  • Includes scope of project and project details: Our SWMS includes a detailed description of the project’s scope and key details, ensuring everyone involved in the project understands what is expected of them.
  • Includes checklist of any high-risk machinery on site: Our SWMS includes a checklist of any high-risk machinery that will be on site, making it easier to manage these risks and ensure they are appropriately addressed.
  • Includes space for recording staff training: Our SWMS includes space for recording staff training, ensuring everyone working on the project is adequately trained and competent.
  • Includes before and after risk ratings: Our SWMS includes before and after risk ratings, making it easy to monitor and assess the effectiveness of risk management strategies.
  • Includes legislative references: Our SWMS includes resources for use of legislative references, helping you stay up-to-date with relevant legislation and regulations.
  • Includes all PPE required: Our SWMS includes all Personal Protective Equipment (PPE) required for the project, ensuring that everyone working on the project is properly protected.
  • Includes risk assessment and risk assessment matrix: Our SWMS includes a risk assessment and risk assessment matrix, which helps identify potential hazards and manage them effectively.
  • Includes checklist to ensure all requirements have been covered: Our SWMS includes a checklist to ensure all requirements have been covered when implementing the SWMS, helping to ensure nothing is missed.
  • Includes sign off page for all workers and responsible persons: Our SWMS includes a sign-off page for all workers and responsible persons, ensuring that everyone involved in the project is aware of their responsibilities and has agreed to follow the SWMS.
  • Easy to use, easy to customise: Our SWMS is easy to use and customise, making it a practical tool for managing risks associated with working with a CNC machining centre.
  • Suitable for large contracts and tenders: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work.
  • Instantly delivered download: Our SWMS is available for instant download, so you can get started on your project right away.

We believe that our SWMS is a valuable tool for managing risks associated with working with a CNC machining centre. It is designed to assist you in completing your project safely and efficiently. Please note that while we are confident in the effectiveness of our SWMS, it is important to remember that it is only one part of a larger safety management system, and additional safety measures may be required depending on the specific requirements of your project.

Here is some safety information related to using a CNC machining centre.

Hazards:

There are several hazards associated with the use of a CNC machining centre. These include:

  • Electrical hazards
  • Mechanical hazards
  • Chemical hazards
  • Noise hazards
  • Heat hazards
  • Fire hazards

Precautions:

The following precautions should be taken when using the CNC machining centre:

  1. Electrical hazards:
  • Ensure that the machine is properly grounded.
  • Ensure that all electrical components are properly installed and maintained.
  • Never touch electrical components with wet hands.
  • Never tamper with electrical components.
  1. Mechanical hazards:
  • Ensure that all guards and safety devices are in place and functioning properly.
  • Never reach into the machine while it is operating.
  • Never touch moving parts of the machine.
  • Never remove guards or safety devices.
  1. Chemical hazards:
  • Follow all manufacturer’s instructions when handling chemicals.
  • Ensure that all chemicals are stored properly.
  • Wear appropriate personal protective equipment (PPE) when handling chemicals.
  1. Noise hazards:
  • Wear appropriate hearing protection when operating the machine.
  1. Heat hazards:
  • Ensure that the machine is properly cooled and ventilated.
  • Wear appropriate PPE to protect against heat.
  1. Fire hazards:
  • Ensure that the machine is properly maintained and free from debris.
  • Never leave the machine unattended while it is operating.

Procedure:

The following procedures should be followed when using the CNC machining centre:

  1. Setup:
  • Ensure that the machine is properly grounded.
  • Ensure that all guards and safety devices are in place and functioning properly.
  • Ensure that all tools and materials are properly secured.
  1. Programming:
  • Follow all manufacturer’s instructions when programming the software.
  • Ensure that all programs have been verified and tested.
  1. Operation:
  • Follow all manufacturer’s instructions when operating the machine.
  • Ensure that all guards and safety devices are in place and functioning properly.
  • Monitor the machine while it is operating.
  • Never leave the machine unattended while it is operating.

Conclusion:

The CNC machining centre is a powerful and complex tool that requires careful handling to avoid injury or damage. It is the responsibility of all personnel to follow the guidelines outlined.

Gary’s Safety Tips

Hey everyone, it’s Gary! Today, we’re going to talk about an important topic that affects many of you out there who work with CNC machining centres. While these machines are incredibly powerful and useful, they also come with certain dangers that you need to be aware of.

First and foremost, let’s talk about the dangers. CNC machining centres are heavy-duty machines that are capable of cutting through tough materials like metal and wood with ease. As a result, they can cause serious injury if not operated correctly. One of the biggest dangers associated with these machines is the risk of entanglement. This occurs when your clothing or body parts get caught in the machine’s moving parts, which can result in severe injury or even death.

Another danger is the risk of flying debris. When the machine is cutting, tiny pieces of material can be launched into the air at high speeds. If these pieces hit you, they can cause serious cuts or puncture wounds. Eye protection is especially important when working with CNC machining centres, as debris can easily get into your eyes and cause permanent damage.

Finally, there is the risk of electrical shock. CNC machines are powered by electricity, and if they are not properly grounded, there is a risk of electrical shock. This is especially dangerous if you are working in a damp or wet environment, as water can conduct electricity.

Now that we’ve talked about the dangers, let’s discuss some safety recommendations to help keep you safe when working with a CNC machining centre.

First and foremost, it is essential that you are properly trained on how to use the machine. Before operating the CNC machining centre, take the time to read through the operator’s manual thoroughly. Make sure you understand all of the machine’s functions, and practice operating it before you start working on any projects. If you have any questions or concerns, don’t hesitate to ask your supervisor or a more experienced colleague for guidance.

Another important safety recommendation is to wear the proper personal protective equipment (PPE). This includes safety glasses or a face shield to protect your eyes from flying debris, as well as gloves and a heavy-duty apron to protect your hands and body from sharp edges and entanglement. It is also important to wear non-slip shoes with a steel toe to protect your feet.

It’s also a good idea to keep your work area clean and organised. This can help prevent accidents from occurring, such as slipping on a piece of debris or tripping over a loose tool. Make sure all tools and equipment are stored in their proper place when not in use.

When operating the machine, it’s important to be aware of your surroundings at all times. This includes paying attention to where your hands and body are in relation to the machine’s moving parts. Never reach into the machine while it is in operation, and make sure you stand a safe distance away from the cutting area.

Finally, it’s important to properly maintain the CNC machining centre. This includes regular inspections and cleaning of the machine, as well as routine maintenance tasks such as oiling and lubricating moving parts. If you notice any issues with the machine, such as unusual noises or vibrations, report them to your supervisor immediately. It’s also important to follow all of the manufacturer’s recommended maintenance procedures to ensure that the machine is operating correctly and safely.

In conclusion, working with a CNC machining centre can be incredibly rewarding, but it also comes with certain risks. By following these safety recommendations, you can help keep yourself and those around you safe while using the machine. Always remember to stay alert, wear the proper PPE, and never hesitate to ask for guidance if you are unsure about how to operate the machine. Stay safe out there, everyone!

Regards,

CNC Machining Centre Safe Work Method Statement (SWMS)

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

CNC Machining Centre Safe Work Method Statement (SWMS)

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket

Verified by MonsterInsights