Call 1300 877 609 to find out about the latest offers available.

Chain Wire Fencing Machine Safe Work Method Statement (SWMS)

SKU:SWMAU327

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Chain Wire Fencing Machine Safe Work Method Statement (SWMS)

Introducing our Safe Work Method Statement for using chain wire fencing, the ultimate guide to ensure a safe and secure installation process. Our SWMS is designed to assist workers and responsible persons in identifying and controlling risks associated with the installation of chain wire fencing.

Here are some key features that make our SWMS stand out:

  • Pre-filled and Comprehensive: Our SWMS is pre-filled with all the necessary details and is comprehensive enough to cover all aspects of chain wire fencing installation. We’ve done the hard work for you, so all you need to do is tailor it to your specific project requirements.
  • Fully editable and customisable in Microsoft Word format: We understand that each project is unique, and that’s why we’ve made our SWMS fully editable and customisable in Microsoft Word format. This means you can easily modify it to suit your project needs.
  • Includes the scope of the project and the project details: Our SWMS includes all the necessary information about the scope of the project and project details. This ensures that everyone involved in the project is aware of what needs to be done and how it needs to be done.
  • Includes checklist of any high-risk machinery on site: Our SWMS includes a checklist of any high-risk machinery that may be used on site. This helps to identify potential hazards and mitigate them before they become a problem.
  • Includes space for recording any staff training: Our SWMS includes space for recording any staff training that has been completed. This ensures that everyone involved in the project is aware of the risks and how to mitigate them.
  • Includes before and after risk ratings: Our SWMS includes before and after risk ratings to help you identify any changes in risk levels throughout the project. This ensures that risks are being controlled and managed effectively.
  • Includes resources for use of legislative references: Our SWMS includes resources for the use of legislative references, ensuring that you comply with all relevant laws and regulations.
  • Includes all PPE required: Our SWMS includes all the PPE required for the installation of chain wire fencing. This ensures that everyone involved in the project is protected from potential hazards.
  • Includes risk assessment and risk assessment matrix: Our SWMS includes a risk assessment and risk assessment matrix. This helps to identify potential hazards and assess the level of risk associated with each hazard.
  • Includes a checklist to ensure all requirements have been covered when implementing the SWMS: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS. This ensures that the SWMS is being used effectively and efficiently.
  • Includes sign-off page for all workers and responsible persons: Our SWMS includes a sign-off page for all workers and responsible persons. This ensures that everyone involved in the project has read and understood the SWMS.
  • Easy to use, easy to customise: Our SWMS is designed to be easy to use and easy to customise. This means you can spend less time on paperwork and more time on getting the job done.
  • Suitable for large contracts and Tenders, including tier 1 contractual work: Our SWMS is suitable for large contracts and Tenders, including tier 1 contractual work. This means you can use our SWMS for any project, big or small.
  • Instantly delivered download: Our SWMS is available for instant download, so you can get started on your project right away.

At Bluesafe, we are committed to providing high-quality SWMS that help keep workers safe on the job. Our SWMS for using chain wire fencing is an essential tool for any project involving this type of installation. Try it out today and see the difference it can make.

Here is some safety information related to using chain wire fencing machine.

Hazards: The following hazards are associated with the operation of a Chain Wire Fencing Machine:

  • Entanglement with moving parts of the machine
  • Electrocution from contact with power sources or electrical components
  • Manual handling injuries from lifting and positioning materials
  • Noise exposure
  • Inhalation of dust and other airborne particles
  • Eye injuries from flying debris

Risk Controls: To ensure the safety of all workers and others in the vicinity of the Chain Wire Fencing Machine, the following risk controls must be implemented:

  1. Planning and Preparation:
  • Conduct a risk assessment prior to commencing work to identify and assess potential hazards.
  • Ensure that all workers are competent to operate the machine and are provided with appropriate training, information and instruction.
  • Ensure that all safety equipment, including personal protective equipment (PPE), is available and in good working order.
  1. Set up:
  • Check that the machine is in good working order and free from defects.
  • Position the machine on level ground and secure it in place.
  • Ensure that all safety guards and shields are in place before starting the machine.
  • Ensure that the work area is clear of obstructions and other hazards.
  1. Operation:
  • Only operate the machine when all safety guards and shields are in place.
  • Follow the manufacturer’s instructions for starting and stopping the machine.
  • Do not wear loose clothing, jewellery, or other items that may become entangled in the machine.
  • Never place your hands or any other body part near moving parts of the machine.
  • Ensure that all materials are properly supported and positioned before starting the machine.
  • Use appropriate lifting techniques when handling heavy or awkward items.
  • Always wear appropriate PPE, including eye protection, hearing protection, and respiratory protection if required.
  • Regularly clean the machine and the work area to reduce the risk of dust inhalation and other hazards.
  • If any problems or hazards are identified, stop the machine immediately and report them to a supervisor.
  1. Shutdown:
  • Follow the manufacturer’s instructions for shutting down the machine.
  • Ensure that all moving parts have come to a complete stop before leaving the machine unattended.
  • Store the machine and all associated equipment in a safe and secure location.

Emergency Procedures: In the event of an emergency, such as an accident or injury, the following emergency procedures must be followed:

  • Call for medical assistance if required.
  • Stop the machine immediately and isolate the power source.
  • Evacuate the area if necessary.
  • Report the incident to a supervisor or manager.

Gary’s Safety Tips

What’s up everybody, it’s your safety guy Gary here to talk about something that’s been on my mind lately – the dangers of working with chain wire fencing machines.

Now, I know that many of you out there work in the construction industry, and if you’re like me, you understand that safety always comes first. When it comes to using chain wire fencing machines, there are some serious risks involved that you need to be aware of.

First off, let’s talk about the obvious – the machine itself. These machines are powerful tools that can cause serious injury or even death if not used properly. If you’re not trained in the use of a chain wire fencing machine, you should never attempt to operate one on your own.

Additionally, there are other potential dangers that come with using these machines. One of the biggest risks is getting caught in the wire. If you’re not careful, the wire can wrap around your fingers, hands, or even your arms, causing severe injuries or amputations.

Another potential danger is getting hit by flying debris. When the machine is in operation, it can kick up rocks, dirt, and other debris that can fly through the air at high speeds. This can cause serious injuries to your eyes or other parts of your body.

So, what can you do to stay safe when working with chain wire fencing machines? Here are a few recommendations that I have for you:

  1. Get Proper Training – As I mentioned earlier, if you’re not trained in the use of a chain wire fencing machine, you should never attempt to operate one on your own. Make sure you receive proper training before using one of these machines.
  2. Wear Proper Safety Gear – Always wear the proper safety gear when working with a chain wire fencing machine. This includes safety glasses, gloves, and long sleeves to protect your arms.
  3. Stay Alert – When using a chain wire fencing machine, it’s important to stay alert and focused on the task at hand. Don’t let distractions or fatigue get in the way of your safety.
  4. Inspect the Machine Before Use – Before using a chain wire fencing machine, inspect it to make sure it’s in good working condition. Check the wire tension, blade sharpness, and any other parts that may be prone to wear and tear.
  5. Don’t Work Alone – Whenever possible, work with a partner or team when using a chain wire fencing machine. This can help ensure that you have someone else there to help you in case of an emergency.

Remember, safety should always be your top priority when working with any type of machinery, especially something as powerful as a chain wire fencing machine. By following these recommendations and taking the proper precautions, you can help ensure that you stay safe and avoid any unnecessary accidents or injuries.

Thanks for tuning in, everybody. Until next time, stay safe and keep hustling!

Cheers,

Chain Wire Fencing Machine Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Chain Wire Fencing Machine Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket