Call 1300 877 609 to find out about the latest offers available.

Cable Fixing Tools (Gas Powered) Safe Work Method Statement (SWMS)

SKU:SWMAU672

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Cable Fixing Tools (Gas Powered) Safe Work Method Statement (SWMS)

Introducing our Safe Work Method Statement (SWMS) for gas powered cable fixing tools! Our SWMS is a comprehensive document designed to assist you in creating a safe work environment for your team. Here are the key features of our SWMS:

  • Pre-filled and Comprehensive: Our SWMS comes pre-filled with all the necessary details and requirements for gas powered cable fixing tools. This means that you won’t miss any important steps or requirements when creating your own SWMS.
  • Fully editable and customisable: Our SWMS is provided in Microsoft Word format, making it easy to edit and customise to suit your specific needs. You can easily add or remove sections, change details, and adjust the document to meet the requirements of your project.
  • Includes scope and project details: Our SWMS includes a detailed description of the scope of your project and all the relevant project details. This ensures that you have a clear understanding of the work to be done and the potential hazards that may be encountered.
  • Checklist of high-risk machinery: Our SWMS includes a checklist of any high-risk machinery on site. This ensures that you have a comprehensive understanding of the potential hazards that may be present and can take appropriate measures to mitigate these risks.
  • Space for recording staff training: Our SWMS includes space for recording any staff training that has been undertaken. This ensures that all staff members are fully trained and aware of the potential hazards associated with the use of gas powered cable fixing tools.
  • Before and after risk ratings: Our SWMS includes before and after risk ratings, which enable you to assess the level of risk associated with the work before and after implementing the SWMS. This helps you to determine the effectiveness of the SWMS and make any necessary adjustments.
  • Resources for legislative references: Our SWMS includes resources for the use of legislative references, ensuring that you are up-to-date with the latest regulations and requirements.
  • PPE requirements: Our SWMS includes all the PPE required for the use of gas powered cable fixing tools. This ensures that all staff members are properly equipped and protected when using these tools.
  • Risk assessment and risk assessment matrix: Our SWMS includes a risk assessment and risk assessment matrix, which enables you to identify and assess potential hazards and determine appropriate risk control measures.
  • Checklist for SWMS implementation: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS. This ensures that you have a comprehensive understanding of the work to be done and the potential hazards that may be encountered.
  • Sign off page for all workers and responsible persons: Our SWMS includes a sign off page for all workers and responsible persons. This ensures that everyone involved in the project is aware of the SWMS and has agreed to follow its guidelines.
  • Easy to use and customise: Our SWMS is designed to be easy to use and customise, ensuring that you can quickly and easily create a comprehensive SWMS for your project.
  • Suitable for large contracts and tenders: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work. This ensures that you can use our SWMS for a wide range of projects and contracts.
  • Instantly delivered download: Our SWMS is available as an instantly downloadable file, ensuring that you can access it quickly and easily whenever you need it.

At the end of the day, our SWMS is a tool designed to help you create a safe work environment for your team. While we can’t guarantee that accidents won’t happen, we believe that our SWMS can help you to minimise risks and ensure the safety of your team.

Here is some safety information related to using cable fixing tools.

Hazards:

The use of gas-powered cable fixing tools can present several hazards, including:

  • Physical injury from the tool’s moving parts, including the nail or staple ejection mechanism.
  • Hearing damage due to the high noise levels produced by the tools.
  • Eye injury from flying debris.
  • Electrical shock from contact with live cables or wires.
  • Burns from hot surfaces or exhaust fumes.

Control measures:

To mitigate these hazards, the following control measures must be implemented:

  • All personnel must be trained in the safe use of the tools, including any hazards associated with their use.
  • Only personnel who have been trained and authorised to use the tools may do so.
  • Personal Protective Equipment (PPE) must be worn at all times, including ear protection, eye protection, and gloves.
  • Before using the tools, ensure that the work area is clear of any obstructions, debris, or live wires.
  • Use the tools in a well-ventilated area, and avoid using them in confined spaces or areas with poor ventilation.
  • Follow the manufacturer’s instructions for the safe use of the tools, including proper maintenance and cleaning procedures.
  • Use the appropriate size and type of fastener for the cable being fixed, and ensure that the fastener is securely fixed into the surface.
  • Regularly inspect the tools for any signs of damage or wear, and do not use damaged or faulty tools.
  • Ensure that gas cylinders are stored and handled in accordance with relevant regulations and manufacturer’s instructions.
  • In case of emergency, ensure that first aid equipment is readily available and that personnel know how to use it.

Gary’s Safety Tips

Hey there, it’s your safety guy Gary, and today I want to talk about something serious: the dangers of working with gas-powered cable fixing tools.

Let’s face it, gas-powered tools are powerful and convenient. They get the job done quickly and efficiently, which is why they’re so popular in the construction industry. But with great power comes great responsibility, and that’s something that many people overlook when using these tools.

First and foremost, gas-powered tools are incredibly dangerous if not used correctly. They can cause serious injuries, even fatalities, if mishandled. The most common injuries associated with gas-powered tools are cuts, bruises, burns, and fractures, but it’s not uncommon for these tools to cause much more severe injuries.

One of the biggest dangers of gas-powered cable fixing tools is the risk of electrocution. These tools are often used to work on live electrical wires, and if the tool isn’t properly grounded or insulated, it can cause a fatal electrical shock to the operator.

Another danger of gas-powered tools is the risk of carbon monoxide poisoning. These tools emit dangerous fumes that can be deadly if inhaled in large quantities. Proper ventilation is essential when working with gas-powered tools, and workers should always be trained on how to properly use and maintain these tools to prevent accidents and injuries.

In addition to the immediate dangers of gas-powered tools, there are also long-term health risks associated with their use. Prolonged exposure to the noise, vibration, and exhaust fumes of these tools can lead to hearing loss, nerve damage, and respiratory problems.

So, what can you do to protect yourself when working with gas-powered cable fixing tools?

First and foremost, always follow the manufacturer’s instructions and safety guidelines when using these tools. Make sure you understand how to properly operate and maintain the tool, and never take shortcuts or ignore safety protocols.

Always wear the appropriate personal protective equipment (PPE) when using gas-powered tools. This includes eye and ear protection, gloves, and respiratory protection if necessary.

Ensure that the tool is properly grounded and insulated when working on live electrical wires. Never touch the tool or the wire with your bare hands, and always use insulated tools when working with electricity.

Make sure that the area where you’re using the tool is well-ventilated, and if possible, work outdoors or in a well-ventilated area to reduce the risk of carbon monoxide poisoning.

Finally, get regular checkups with a doctor to monitor your health if you work with gas-powered tools regularly. This will help to catch any long-term health problems early on so that they can be treated before they become serious.

In conclusion, gas-powered cable fixing tools are incredibly powerful and convenient, but they can also be incredibly dangerous if not used properly. Always follow the manufacturer’s instructions and safety guidelines, wear appropriate PPE, and take steps to protect yourself from the immediate and long-term dangers of these tools. By doing so, you can enjoy the benefits of gas-powered tools without putting yourself or others at risk. Stay safe out there!

Here are some additional safety tips for working with gas-powered cable fixing tools:

  1. Before using the tool, inspect it for any damage or wear and tear. If you notice any issues, do not use the tool and have it repaired or replaced.
  2. Keep the work area clear of debris, and never use the tool in a crowded or cluttered space.
  3. Always use the correct size and type of fuel recommended by the manufacturer, and store fuel in a well-ventilated area away from heat sources and flames.
  4. When transporting the tool, always turn it off and disconnect the spark plug to prevent accidental starting.
  5. When not in use, store the tool in a dry, secure location out of reach of children and unauthorised personnel.
  6. Be aware of your surroundings at all times when using the tool, and never operate it if you’re feeling tired or distracted.
  7. If you’re working at heights or on a ladder, use a safety harness or fall protection equipment to prevent falls.

Remember, safety should always be your top priority when working with gas-powered cable fixing tools. By following these tips and taking the necessary precautions, you can minimise the risk of accidents and injuries and keep yourself and those around you safe.

Cheers,

Cable Fixing Tools (Gas Powered) Safe Work Method Statement (SWMS)

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Cable Fixing Tools (Gas Powered) Safe Work Method Statement (SWMS)

Total Inc GST

$96.50

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket