Call 1300 877 609 to find out about the latest offers available.

Brick Wallbank Press Safe Work Method Statement (SWMS)

SKU:SWMAU642

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Brick Wallbank Press Safe Work Method Statement (SWMS)

Introducing our Safe Work Method Statement for using Brick Wallbank Press – the comprehensive tool for any construction project that involves the use of high-risk machinery. Our SWMS is designed to help you and your team work safely and effectively, while adhering to all necessary regulations and legislative requirements. Here are some key features of our SWMS:

  • Pre-filled and Comprehensive: Our SWMS comes pre-filled with all the necessary details and information you need to get started. It covers all the key areas of concern, including risk assessment, PPE requirements, staff training, legislative references, and more.
  • Fully editable and customisable: Our SWMS is provided in Microsoft Word format, which means it’s fully editable and customisable to suit your specific needs. You can add or remove information as required, and tailor the document to fit your particular project.
  • Includes the scope of the project and project details: Our SWMS includes a clear description of the project and its scope, so everyone involved is aware of what’s expected of them. This helps to ensure everyone is on the same page and working towards the same goal.
  • Includes a checklist of any high-risk machinery on site: Our SWMS includes a detailed checklist of any high-risk machinery that will be used on site. This helps to ensure that all machinery is properly inspected, maintained and operated in accordance with relevant regulations and guidelines.
  • Includes space for recording any staff training: Our SWMS includes space for recording any staff training that has taken place, so you can keep track of who has received training and when.
  • Includes before and after risk ratings: Our SWMS includes before and after risk ratings, which can help you identify any potential hazards before work begins and monitor the effectiveness of your risk management strategies.
  • Includes resources for use of legislative references: Our SWMS includes resources for the use of legislative references, so you can stay up-to-date with the latest regulations and guidelines and ensure you’re operating within the law.
  • Includes all PPE required: Our SWMS includes a comprehensive list of all PPE required for the job, so you can ensure that everyone on site is properly protected.
  • Includes risk assessment and risk assessment matrix: Our SWMS includes a detailed risk assessment and risk assessment matrix, which helps you to identify potential hazards and implement effective risk management strategies.
  • Includes a checklist to ensure all requirements have been covered: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS. This helps to ensure that nothing is missed and all necessary steps have been taken to ensure a safe and successful project.
  • Includes sign off page for all workers and responsible persons: Our SWMS includes a sign-off page for all workers and responsible persons, so you can ensure that everyone has read and understood the SWMS and is committed to following it.
  • Easy to use, easy to customise: Our SWMS is designed to be user-friendly and easy to customise, so you can quickly and easily create a document that meets your specific needs.
  • Suitable for large contracts and tenders, including tier 1 contractual work: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work, so you can be confident that it meets the highest standards of quality and compliance.
  • Instantly delivered download: Our SWMS is available for instant download, so you can start using it right away and get your project off to a safe and successful start.

Our SWMS is the perfect tool for anyone who needs to use high-risk machinery on a construction project. It’s comprehensive, easy to use, and fully customisable, so you can tailor it to suit your specific needs. Whether you’re working on a small project or a large contract, our SWMS is the perfect solution for ensuring a safe and successful

Here is some safety information related to using Brick Wallbank Press.

Hazards:

  • Manual Handling Injuries
  • Electrical Hazards
  • Crush Injuries
  • Struck-by Hazards
  • Pinch Points
  • Eye Injuries

Risk Assessment:

  • Before commencing work, inspect the working area and ensure that there are no potential hazards.
  • Only workers who have received proper training and instruction are permitted to operate the Brick Wallbank Press.
  • Workers must wear appropriate personal protective equipment (PPE) including safety glasses, gloves, steel-capped boots, and hearing protection.
  • Ensure that all electrical cords and equipment are free from damage and are in good working order.
  • All workers must use correct manual handling techniques and avoid overexertion when handling bricks and equipment.
  • Ensure that the press is installed and operated in accordance with the manufacturer’s instructions.
  • Ensure that the press is securely anchored to the floor or fixed to a substantial stand.
  • Do not operate the press if it has been damaged or is not functioning correctly.

Control Measures:

  • Use mechanical aids such as trolleys, forklifts, and pallet jacks to move heavy loads.
  • All electrical cords and equipment must be checked before use to ensure they are in good condition and free from damage.
  • Before operating the press, ensure that all guards and safety devices are in place and functioning correctly.
  • Workers must use correct manual handling techniques to avoid overexertion and injury.
  • Always wear appropriate PPE when operating the press.
  • Conduct regular checks of the press to ensure it is functioning correctly and report any faults or damage immediately.
  • Never modify the press or its safety features.
  • Ensure that the press is isolated from the power source when not in use.

Emergency Procedures:

  • In case of an emergency, shut down the press and isolate it from the power source.
  • Administer first aid if necessary and seek medical attention if required.
  • Report the incident to the site supervisor immediately.
Gary’s Safety Tips

Hey there, it’s great to be here and talk about best practices for creating safe work method statements for high-risk jobs. Now, as someone who’s been in the business world for quite some time, I understand the importance of safety in the workplace. It’s not just about avoiding accidents and injuries, it’s also about protecting your employees and your business from potential liabilities.

So, how do you create safe work method statements for high-risk jobs? Well, the first step is to identify the risks associated with the job. You need to analyse the work environment, equipment, and materials involved in the job to determine what hazards exist. This includes both physical hazards, such as falling objects or electrical hazards, and chemical hazards, such as toxic substances or flammable materials.

Once you’ve identified the risks, you need to develop a plan to mitigate them. This plan should include specific steps that employees can take to reduce the risk of injury or accident. This may include wearing personal protective equipment, using specific tools or equipment, or following specific procedures to minimise the risk of exposure to hazardous materials.

It’s important to involve your employees in the process of creating safe work method statements. Your employees are the ones who are on the front lines, so they have valuable insights into the risks associated with their jobs. By involving them in the process, you can ensure that the plan you develop is practical and effective.

When creating a safe work method statement, it’s important to be specific. You need to provide clear instructions for each step of the job, including any safety procedures that need to be followed. This may include providing diagrams or illustrations to help employees understand the steps involved.

It’s also important to ensure that your safe work method statement is up to date. You need to regularly review and update the plan to ensure that it remains effective. This may include revising the plan based on new information about potential hazards or changes in equipment or materials.

Another important aspect of creating safe work method statements is training your employees. You need to ensure that your employees understand the risks associated with their jobs and the steps that they need to take to mitigate those risks. This may include providing regular training sessions or refresher courses to ensure that your employees are up to date on the latest safety procedures.

Finally, it’s important to enforce your safe work method statements. You need to ensure that your employees are following the procedures outlined in the plan. This may include conducting regular inspections or audits to ensure that your employees are complying with the plan.

In conclusion, creating safe work method statements for high-risk jobs is essential for protecting your employees and your business. By identifying potential hazards, developing a plan to mitigate those risks, involving your employees in the process, being specific in your instructions, ensuring that your plan is up to date, training your employees, and enforcing the plan, you can create a safe and productive work environment for everyone. Remember, safety should always be a top priority in the workplace.

Cheers,

Brick Wallbank Press Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Brick Wallbank Press Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket