Call 1300 877 609 to find out about the latest offers available.

Automatic Transmission Flusher Safe Work Method Statement (SWMS)

SKU:SWMAU608

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Automatic Transmission Flusher Safe Work Method Statement (SWMS)

Introducing the Automatic Transmission Flusher Safe Work Method Statement – your all-inclusive resolution for guaranteeing safety at your worksite. We comprehend the significance of safety in any scheme, and that is why we’ve established a document that is already filled with crucial information, and fully modifiable in Microsoft Word format, aimed at simplifying your life.

Here are some of the key features that distinguish this document from others:

Pre-filled and Comprehensive: Our document is already filled with all the important information required for a secure worksite, sparing you the time and effort. It encompasses a thorough list of safety requirements that are obligatory for the project’s successful completion.

Fully editable and customisable: We acknowledge that every worksite differs, hence we have designed our document to be fully editable and modifiable in Microsoft Word format. You can effortlessly add, delete, or alter any details to adapt it to your exact project necessities.

Includes the scope of the project and project details: Our document covers detailed project scope and project details for easy comprehension.

Includes checklist of any high-risk machinery on site: Our document comprises of a checklist of any high-risk machinery that will be present at the worksite. This ensures that all essential safety measures are implemented before operating such machinery.

Includes space for recording staff training: Our document includes a space for recording staff training to ensure that all employees have undergone adequate training in safety procedures before starting work at the site.

Includes before and after risk ratings: Our document incorporates before and after risk ratings to assist you in evaluating and monitoring the effectiveness of your safety procedures.

Includes resources for use of legislative references: Our document includes resources for the use of legislative references to aid you in staying up-to-date with the latest safety regulations and requirements.

Includes all PPE required: Our document comprises of a comprehensive list of all Personal Protective Equipment (PPE) required to ensure the safety of workers.

Includes risk assessment and risk assessment matrix: Our document encompasses a risk assessment and risk assessment matrix to assist you in identifying potential hazards and implementing necessary safety measures.

Includes a checklist to ensure all requirements have been covered when implementing the document: Our document includes a checklist to guarantee that all requirements have been addressed when implementing the document, ensuring that no crucial safety procedures have been missed.

Includes sign-off page for all workers and responsible persons: Our document features a sign-off page for all workers and responsible persons, ensuring that everyone involved in the project is aware of and consents to follow the safety procedures mentioned in the document.

Easy to use, easy to customise: Our document is designed to be user-friendly and easy to customise, so you can rapidly adapt it to any project.

Suitable for large contracts and tenders, including tier 1 contractual work: Our document is suitable for large contracts and tenders, including tier 1 contractual work, ensuring that your worksite complies with all the necessary safety requirements.

Instantly delivered download: Our document is accessible as an instant download, enabling you to begin your project immediately.

To summarise, the Safe Work Method Statement for Automatic Transmission Flusher is a comprehensive and user-friendly solution to guarantee safety at your worksite. With our pre-filled and fully editable document, you can have faith that you have fulfilled all the required safety procedures for your project.

Here is some safety information related to working with automatic transmission flusher.

Hazard Identification:

  1. Chemical hazards: The automatic transmission flusher uses chemicals which can be hazardous if not used correctly.
  2. Slip and trip hazards: There is a risk of slipping and tripping on the equipment or the area around it.
  3. Electrical hazards: The flusher is powered by electricity and there is a risk of electrocution if not used correctly.
  4. Manual handling hazards: The flusher can be heavy and awkward to lift, increasing the risk of back strain and other injuries.
  5. Noise hazards: The flusher produces a loud noise which can be damaging to hearing if exposed to it for prolonged periods.

Risk Assessment:

Risk assessments should be conducted prior to using the equipment to identify potential hazards and determine appropriate control measures.

Control Measures:

  1. Chemical hazards: Wear appropriate personal protective equipment (PPE) such as gloves, goggles and a respirator. Follow the manufacturer’s instructions for the safe use and disposal of chemicals.
  2. Slip and trip hazards: Ensure the area around the equipment is clear of obstructions and spills. Use appropriate footwear with slip-resistant soles.
  3. Electrical hazards: Ensure the equipment is properly grounded and the power supply is protected by a residual current device (RCD). Do not use the equipment in wet conditions.
  4. Manual handling hazards: Use proper lifting techniques and seek assistance if necessary. Use equipment such as trolleys or hoists to move the flusher.
  5. Noise hazards: Wear hearing protection such as earplugs or earmuffs.

Procedure:

  1. Conduct a risk assessment prior to using the equipment.
  2. Ensure the area around the equipment is clear of obstructions and spills.
  3. Ensure the equipment is properly grounded and the power supply is protected by an RCD.
  4. Wear appropriate PPE such as gloves, goggles and a respirator.
  5. Follow the manufacturer’s instructions for the safe use and disposal of chemicals.
  6. Use proper lifting techniques and seek assistance if necessary.
  7. Use equipment such as trolleys or hoists to move the flusher.
  8. Wear hearing protection such as earplugs or earmuffs.
  9. Test the flusher before use to ensure it is working correctly.
  10. Connect the flusher to the vehicle’s transmission using the appropriate fittings.
  11. Turn on the flusher and allow it to run for the recommended amount of time.
  12. Turn off the flusher and disconnect it from the vehicle’s transmission.
  13. Dispose of chemicals and waste materials according to local regulations.
  14. Clean and store the flusher in a safe and secure location.

Emergency Procedures:

  1. In case of chemical exposure, rinse affected area with water and seek medical attention.
  2. In case of a slip or trip, assess the severity of the injury and seek medical attention if necessary.
  3. In case of an electrical shock, turn off power supply and seek medical attention.
  4. In case of a manual handling injury, assess the severity of the injury and seek medical attention if necessary.
  5. In case of noise exposure, remove yourself from the source of the noise and seek medical attention if you experience hearing loss or ringing in the ears.

Gary’s Safety Tips

Hey there, my friends! Today we’re going to talk about something that’s really important to me: safety procedures and policies when working with an Automatic Transmission Flusher. Now, I know that might not sound like the most exciting topic in the world, but trust me when I say that taking the time to ensure you’re working safely is absolutely crucial.

First things first, let’s talk about what an Automatic Transmission Flusher is. This is a piece of equipment that’s used in automotive repair shops to flush out old transmission fluid and replace it with new fluid. It’s a really important tool for keeping cars running smoothly, but it can also be dangerous if not used properly.

So, let’s get down to the nitty-gritty: how do you work safely with an Automatic Transmission Flusher? Well, the first step is to make sure you’re using the right equipment. This means wearing gloves, safety glasses, and a face mask to protect yourself from any fluids that might be splashing around. You also need to make sure that the Flusher itself is in good working order, with no leaks or other issues that could lead to an accident.

Once you’re all geared up and ready to go, it’s important to follow some basic safety procedures. The first rule of using any piece of equipment is to read the instructions carefully. This might sound obvious, but you’d be surprised how many accidents happen simply because someone didn’t take the time to read the manual. Make sure you understand how the Flusher works and what the different parts do.

Another important safety procedure is to never work alone. Always make sure there’s someone else in the shop with you who can help if something goes wrong. This might mean having a colleague nearby who can grab a fire extinguisher or call for help if needed. It’s also important to let someone know what you’re doing and how long you expect to be working.

When you’re actually using the Flusher, there are a few key things to keep in mind. First, always make sure you’re using the right type of fluid for the transmission you’re working on. Using the wrong fluid can cause serious damage to the transmission and even lead to a fire. It’s also important to never exceed the recommended pressure for the Flusher. This can cause the equipment to fail or even explode, which is obviously not something you want to happen!

Another important safety policy is to make sure the area around the Flusher is clear and free of any obstacles. This might mean moving other tools or equipment out of the way, or simply making sure that no one is standing too close to the Flusher while it’s in use. You should also make sure that the Flusher is placed on a stable surface and that it’s not in danger of tipping over.

Finally, it’s important to know what to do in case of an emergency. This means having a plan in place for what to do if the Flusher fails or if there’s a spill or other accident. You should know where the emergency shut-off switch is located and how to use it, and you should have a plan in place for how to evacuate the area if necessary.

In conclusion, working with an Automatic Transmission Flusher can be a safe and effective way to keep cars running smoothly, but it’s important to take safety seriously. Make sure you’re using the right equipment, following basic safety procedures, and always working with a colleague nearby. And if something does go wrong, make sure you know what to do and have a plan in place for how to handle the situation. Stay safe out there, my friends!

Cheers,

Automatic Transmission Flusher Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Automatic Transmission Flusher Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket